HomeMy WebLinkAbout2018-06-13 Conservation Commission Minutes
North Andover Conservation Commission Meeting Minutes
June 13, 2018
Members Present: Louis A. Napoli, Chairman, Albert P. Manzi, Jr. Vice Chairman,
Joseph W. Lynch, Jr., Deborah A. Feltovic, and Douglas W. Saal.
Members Absent: John T. Mabon
Staff Member Present: Jennifer A. Hughes, Conservation Administrator
Meeting came to Order at: 7:08 pm Quorum Present.
Pledge of Allegiance
Acceptance of Minutes
A motion to accept the minutes as written and reviewed is made by Mr. Manzi seconded by
Ms. Feltovic.
Vote 5-0 unanimous
Request for Determination
35 Dale Street (Allen) (Gibraltar Pools)
The Administrator reviews the proposed project with the Commission and the
nd
updates/changes that have been made to the project. These updates/changes include a 2
peer review letter which recommended no grading to be done on the backside of the pool
with anything steeper than a 2:1 slope and that the pool filter be located as far from the
resource area as possible on the western and north side of the property. An updated pool
O&M plan was also received.
Mr. Lynch would like a new O&M Plan with language that if the pool needs to be drained it
will be trucked away from the site.
The Administrator states it can be a preconstruction condition that the pool O&M
modification be submitted.
Mr. Manzi questions if there are limits to the number to conditions allowable on a
Determination of Applicability.
The Administrator states that there is no limit on the number of conditions allowed although
it should not be what is required for an OOC.
A motion by Mr. Manzi to issue a negative #3 determination with pre and post construction
inspection with a requirement to modify the O&M Plan with the pool drainage language
change, and the cartridge filter information, seconded by Ms. Feltovic
Vote 5-0 unanimous
Documents
SSV Engineering Inc. prepared by Sam Bade, dated 05/30/2018
707 Turnpike Street (Caffrey) (Christiansen & Sergi)
The Administrator states that a revised plan has been submitted, which now shows the
dewatering information as well as erosion controls on the opposite side of Rte. 114 as well as
a buffer zone associated with of-site resource areas. These buffers are approximate.
1 | Page
North Andover Conservation Commission Meeting Minutes
June 13, 2018
T.J Melvin, Christiansen & Sergi presents the plan changes on behalf of the owner Cheryl
Fitzpatrick at 707 Turnpike Street. Mr. Melvin states that at the last meeting adding a 10’ x
10’ receiving pit was added on the opposite side of 114. Also added was a dewatering plan
for that pit as needed, siltation controls around the limit of work were also added as well as
some approximate offsets are also shown on the revised plan.
Mr. Lynch states the commission needs a condition in the determination stating that this
decision does not grant any property rights to the applicant on the other side of the street.
Mr. Napoli states that the dewatering detail is not adequate for the water that will be
encountered in that area. He states the pit is only 2’ deep and the water will be silted. He
states a frac tank may be needed.
Mr. Lynch states metal sheathing on the sides of the pit could be adequate. He states the
sheathing should go 2’ below the work zone.
Mr. Saal states we should have information on the location of groundwater first.
Mr. Melvin asks if the water table pits could be hand dug.
The Administrator asks if the dewatering area could be enlarged.
Mr. Melvin states the work on the other side of Rte 114 should be short lived.
Mr. Lynch states water table detail is not all that valuable as it is from a point in time.
Commissioner Sean F. McDonough enters the meeting @ 7:22pm
A Motion to continue to June 27, 2018 is made by Mr. Manzi seconded by Ms. Feltovic
Vote 5-0 unanimous
Documents
Letter, prepared by James Melvin, dates 06/06/2018
Sewer Repair Plan, prepared by Christiansen & Sergi, dated 04/16/18, Revs. 06/05/2018
555-575 Turnpike Street (Chestnut Green) (Merrimack Engineering) (Property
Management of Andover)
The Administrator reviews the proposal to repave the parking lot and make other
improvements in the buffer zone. She states there is dumping of debris adjacent to the
wetland that has been removed. She also states that the stormwater management system had
not been maintained. Catch basins have since been cleaned but there are two outlets within
the wetland that could not be found.
Steve Stapinski, Merrimack Engineering Services presents the proposal on behalf of Property
Management of Andover. He states there is also new work at the end of Hillside outside of
the 100’ buffer zone. He states erosion control will be placed at the edge of the pavement. He
states the remainder of the stormwater maintenance will be done and silt sacks will be placed
in the catch basins during paving.
Mr. Lynch asks if the proposal is for grinding.
Mr. Stapinski states some of the material will be reclaimed for grading.
Mr. Lynch states that the paving will be taken down to the original gravel.
Mr. Stapinski states this should be a two week project with the potential for some work to
take place at night. He states there will be a new easement to the town in the cul-de-sac and
that the new paved parking area will be porous pavement per the planning board.
2 | Page
North Andover Conservation Commission Meeting Minutes
June 13, 2018
The Administrator states that proof of cleaning of the pipes could be provided prior to the
start of work.
Mr. Lynch states a machine may be needed to find the pipes.
A motion to issue a negative #3 determination with conditions for cleaning of the discharge
pipes prior to the start of construction, pre and post construction inspections, and placement
of wetland markers is made by Mr. Manzi and seconded by Ms. Feltovic.
Vote 6-0 unanimous
Documents
WPA Form 1 – Request for Determination of Applicability, prepared by Stephen
Stapinski dated 05/01/2018
Written Narrative, prepared by Stephen Stapinski, dated 05/01/2018
Locus Map
Application Checklist Request for Request for Determination of Applicability (RDA)
prepared by Stephen Stapinski, dated 05/01/2018
North Andover Conservation Commission Waiver Request Form, prepared by
Stephen Stapinski, dated 05/01/2018
Assessors Map
Town of North Andover Abutter List, prepared by Samuel Cheney dated 04/30/2018
Plan of Proposed Site Modifications containing 5 sheets, prepared by Merrimack
Engineering, dated 03/01/2018
190 Dale Street (Dyer) (Wetland Consulting Services)
The Administrator presents the need for after the fact permitting of a large patio discovered
while approving a building permit for a deck on the same property.
Robert Prokop, wetland scientist, presents the delineation plan done for the property. He
states the 22’ x 58’ patio is partially constructed and there is a stockpile area. He presents
photos of the site.
Mr. Manzi confirms that after the fact filing fees have been paid.
Mr. Lynch states pressure treated posts and wetland markers should be required at the 25’
No-Disturbance Zone.
A motion to issue a negative #3 determination with conditions for wetland markers on posts
at the 25’ No-disturbance Zone and a post construction inspection is made by Mr.
McDonough and seconded by Ms. Feltovic.
Vote 6-0 unanimous
Documents
WPA Form 1 – Request for Determination of Applicability, prepared by Robert
Prokop dated 05/22/2018
Copy of Check to the Town of North Andover
Written Narrative, prepared by Robert Prokop, Wetland Consulting Services, dated
05/15/2018
Figure 1. USGS Locus Map – 190 Dale Street
Figure 2. Plot Plan of Land, prepared by David P Terenzoni, dated 03/22/2018
Figure 3. Natural heritage Map
Photo A. View of Backyard showing lawn and patio currently under construction
dated 05/09/18
3 | Page
North Andover Conservation Commission Meeting Minutes
June 13, 2018
Photo B. View of Intermittent Stream, dated 05/09/18
Photo C. View of Patio under construction, dated 05/09/18
Photo D. Construction Material behind Patio, dated 05/09/18
Town of North Andover Abutter List, prepared by Samuel Cheney dated 05/15/2018
Notification to Abutters
Ipswich Street & Cotuit Street (Columbia Gas) (Merrill Engineers)
The Administrator presents the proposal for new gas line installation on Ipswich and Cotuit
Streets.
Mr. Lynch asks about abutter notification. A waiver was requested.
The Administrator states the gas company has left notification at residences in the past.
Dana Altobello of Merrill Engineers and Land Surveyors presents the replacement gas line
proposal to the commission. He states the new line will be high pressure PVC with service
connections. The work will be within the roadway and shoulder. He states Brad Holmes
delineated the wetland resource areas. He states the open trench method will be used. Erosion
control will be installed, silt sacks will be placed in catch basins and there will be no work
during rain events.
Mr. Lynch states there is a shallow culvert on Ipswich Street and asks what the plan is to
install the line in this area.
Mr. Altobello states the gas line will be below the culvert.
Mr. Lynch states the commission will need a detail of that work.
Mr. McDonough asks about notification.
The Administrator states they seek a waiver of that requirement and that it is not required by
the WPA only the bylaw.
Mr. Lynch sates a continuation will be needed to get a detail of the crossing area and a
stockpile location on the plan.
Ms.Feltovic asks about the construction schedule.
Mr. Altobello states the contractor will do about 80’-300’ per day. There is approximately
810’ total but work in the buffer zone should only be about 1-2 days.
A motion to continue the public hearing to June 27, 2018 is made by Mr. Lynch and
seconded by Mr. McDonough. The applicant does not need to attend if the detail is deemed
adequate by the Conservation Department.
Vote 6-0 unanimous
Documents
Letter, prepared by Dana M. Altobello, Merrill Engineers and Land Surveyors dated
05/17/2018
WPA Form 1 – Request for Determination of Applicability, Dana M. Altobello,
Merrill Engineers and Land Surveyors dated 05/17/2018
Conservation Filing Fees
Project Narrative
Photograph #1 – View East towards the northern end.
Photograph #2 – View along Ipswich Street
Photograph #3 – View along the proposed gas main replacement route
Photograph #4 – View south along Cotuit Street along proposed gas main
4 | Page
North Andover Conservation Commission Meeting Minutes
June 13, 2018
North Andover Wetlands Regulations Riverfront Area Map
USGS Site Locus Map
FEMA Map
Priority Habitats of Rare Species, Estimated Habitat of Rare Wildlife & Certified
Vernal Pools Map.
Wetland Delineation Overlay Plan
Filtrexx Silt Soxx detail sheet
Application Checklist – Request for Determination of Applicability (RDA) Dana M.
Altobello, Merrill Engineers and Land Surveyors dated 05/18/2018
Copy of Check to the Town of North Andover
Letter, prepared by Sana M. Altobello, Merrill Engineers and Land Surveyors dated
05/17/2018
851 Forest Street (DeResende)
The Administrator reviews the filling and grading work done on site without a permit.
Mr. Lynch confirms the work was done within 35’ of the wetland resource area.
The owner, Christopher DeResende, states all of the debris was cleaned up from the resource
area.
The commission discusses the location of the propane tanks (just inside the 100’ buffer zone)
and the boulders that were removed.
Mr. Manzi states restoration is need up to the 25’ No-Disturbance Zone with permanent
monumentation. Mr. Manzi recommends a stone wall.
Mr. McDonough asks where the boulders will be used.
Mr. Pierce the contractor states there will be grass up to the 25-foot No-Disturbance Zone.
A motion by Mr. Manzi to issue a negative #3 determination with pre and post construction
inspection with a requirement for construction on a 2x2 dry laid fieldstone or boulder wall
with monumentation and restoration planting on the 25 foot no-disturb zone, seconded by
Ms. Feltovic.
Vote 6-0 unanimous
Documents
WPA Form 1 – Request for Determination of Applicability, prepared by Christopher
DeResende, dated 05/31/2018
North Andover Wetlands Regulations Riverfront Area Map
Notification to Abutters
Residential Property Record Card
Copy of Check to the Town of North Andover
Application Checklist- Request for Determination of Applicability (RDA)
Town of North Andover Abutter Listing, prepared by Samuel Cheney, dated 06/04/2018
Notice of Intent (NOI)
242-1728, 500 Boxford Street (Donovan) (Andover Consultants)
A Motion to continue to June 27, 2018 at the request of the applicant is made by Ms. Feltovic
seconded by Mr. Lynch
Vote 6-0 unanimous
5 | Page
North Andover Conservation Commission Meeting Minutes
June 13, 2018
Documents
Email requesting a continuance until June 27, 2018 meeting from Dennis Griecci, dated
06/06/2018
242-1735, 1429 Osgood Street (Oliver Enterprises) (Allen & Major)
A Motion to continue to June 27, 2018 at the request of the applicant is made by Ms. Feltovic
seconded by Mr. Lynch
Vote 5-0 unanimous
Documents
Email requesting a continuance until June 27, 2018 meeting from Wayne Keefner, dated
06/06/2018
242-1736, 195 Olympic Lane (Crepeau) (Wetland & Land Management)
The administrator states that this is ready to close and issue.
A motion to close and issue within 21 days is made by Ms. Feltovic and seconded by Mr.
Manzi.
Vote 6-0 unanimous
242-1737, Annual Road Maintenance (DPW)
The Administrator reviews the renewal of the Public Works general permit with the
Commission.
Mr. Napoli states the Administrator should review the procedures with the new DPW
director.
The Administrator states the matter will need to continue for input from NHESP.
A Motion to continue to June 27, 2018 at the request of the applicant is made by Ms. Feltovic
seconded by Mr. Lynch
Vote 6-0 unanimous
Documents
WPA Form 3 – Notice of Intent, prepared by James Stanford, dated 05/31/2018
NOI Wetland Fee Transmittal Form
Application Checklist Notice of Intent (NOI) prepared by James Stanford, dated
05/31/2018
Letter, prepared by James Stanford, dated June 2018
North Andover Wetlands Regulations Riverfront Area Map
Town of North Andover Resource Area Map
Copy of Letter to MassDEP, prepared by John Borgesi, dated 06/01/2018
Copy of Letter to Natural Heritage and Endangered Species Program, prepared by John
Borgesi, dated 06/01/2018
General Business
242-1699, MOOC Request, 1 High Street (RCG)
The Administrator reviews the minor modification request with the Commissioners which
includes a change in the amount of rip rap installed at the new pond outlet structure.
6 | Page
North Andover Conservation Commission Meeting Minutes
June 13, 2018
Tania Hartford, RGC, reviews the changes as well as a new planting Plan.
A motion to grant the minor modification for 242-1699 is made by Mr. McDonough,
seconded by Ms. Feltovic.
Vote 6-0 unanimous
Documents
Pond Outlet Plan, dated 02/16/2017 revs, 06/04/2018
Planting Plan, prepared by WBB Landscape Design
Letter, prepared by David Giangrande, Design Consultants, Inc. dated 06/08/2018
242-672, PCOC, 22 Bucklin Road (Stapinski) (Merrimack)
The Administrator gives an overview of the original project and presents photos of the site.
Mr. Manzi states this was one of the first PRDs and that there is a stone wall defining the
resource area.
A motion is made by Mr. Manzi to grant a Partial Certificate of Compliance for DEP # 242-
672 for 22 Bucklin Road, seconded by Ms. Feltovic.
Vote 6-0 unanimous
Documents
Letter, prepared by Merrimack Engineering Services, Inc. dated 05/28/2018
WPA Form 8A prepared by Stephen Stapinski, dated 05/28/2018
North Andover Conservation Commission Order of Conditions Compliance Certification
Form, prepared by Stephen Stapinski, dated 05/28/2018.
As-Built Site Plan, prepared by Stephen Stapinski, Merrimack Engineering Services, Inc.
dated 05/28/2018
242-1711, COC Request, 42 Foster Street (Christiansen & Sergi) (D’Antonio)
The Administrator states there is final stabilization of the site.
A motion is made to grant a Certificate of Compliance for DEP # 242-1711 for 42 Foster
Street is made by Mr. McDonough, seconded by Ms. Feltovic.
Vote 5-0 unanimous
Documents
Letter, Prepared by James Melvin, Christiansen & Sergi dated 06/06/2018
WPA Form 8A – Request for Certificate of Compliance, prepared by James Melvin,
Christiansen & Sergi
Conservation As-Built Plan, prepared by Philip Christiansen, Christiansen & Sergi,
dated 06/06/2018.
Chairman Lou Napoli recuses himself for the airport matters as he is an abutter. @8:35pm
Vice Chairman Albert Manzi Jr. will now Chair the meeting.
242-951, COC Request, RW32 End Wetland Restoration (Stantec) (Lawrence Municipal
Airport
The Administrator reviews the request for a Certificate of Compliance and gives some
background on the project.
7 | Page
North Andover Conservation Commission Meeting Minutes
June 13, 2018
Randall Christiansen of Stantec presents the project and the request for a Certificate of
Compliance on behalf of the Lawrence Municipal Airport. He worked on the project and can
answer any questions the Commission has.
A motion is made by Mr. Lynch to grant a Certificate of Compliance for DEP # 242-951 for
Lawrence Municipal Airport, seconded by Ms. Feltovic.
Vote 5-0 unanimous
Documents
Letter, prepared by Randall Christiansen, Stantec, dated 06/08/2018
Letter, prepared Randal Christiansen, Dufresne-Henry, Inc. dated 08/16/1999
Letter, prepared Randal Christiansen, Dufresne-Henry, Inc. dated 09/08/1999
Letter, prepared Randal Christiansen, Dufresne-Henry, Inc. dated 09/09/1999
Letter, prepared Randal Christiansen, Dufresne-Henry, Inc. dated 09/20/1999
Copy of Order of Conditions, 242-951
WPA Form 8A – Request for Certificate of Compliance, prepared by Stantec
As-Built Survey, prepared by David W. Rich dated 05/31/2018
242-1087, COC Request, Airport Industrial Park (Stantec) (Lawrence Municipal Airport
The Administrator states that this project never started and that it is an invalid OOC for work
never started.
A motion is made by Mr. McDonough to grant a Certificate of Compliance for DEP # 242-
1087 for Lawrence Municipal Airport, seconded by Ms. Feltovic.
Vote 5-0 unanimous
Documents
Letter, prepared by Randall Christiansen, Stantec, dated 08/26/2016
Copy of Order of Conditions, 242-1087
WPA Form 8A – Request for Certificate of Compliance, prepared by Stantec
242-1347, COC Request, Airport Vegetation Management Plan (Stantec) (Lawrence
Municipal Airport
The Administrator states that a Final monitoring report was not done but that there are data
sheets from 3 out of the 5 years of reports were submitted. The Administrator states that the
site is well stabilized and complete and all requirements have been met.
Mr. Lynch asks if there are several VMP’s for this site.
Mr. Randall states that there were only two.
A motion is made to grant a Certificate of Compliance for DEP # 242-1347 for Lawrence
Municipal Airport is made by Mr. McDonough, seconded by Mr. Saal.
Vote 5-0 unanimous
Documents
Letter, prepared by Randall Christiansen, Stantec, dated 02/06/2018
Copy of Order of Conditions, 242-1347
WPA Form 8A – Request for Certificate of Compliance, prepared by Stantec
Record Drawings, prepared by Stantec dated July 2016
Letter, prepared by Randall Christiansen, dated 06-08-2018
Post-Management Vegetation Monitoring photos and report dated June 2018
8 | Page
North Andover Conservation Commission Meeting Minutes
June 13, 2018
242-1642, COC Request, Runway 14-32 Safety Area Project (Stantec) (Lawrence
Municipal Airport)
The Administrator states that there are a few discrepancies from the original proposed
plan. There is a gravel riprap slope adjacent to the resource area that is different from
what was proposed but is needed due to the steepness of the slope. In addition, wetland
markers on posts are still needed.
The Administrator recommends issuing the Certificate of Compliance but holding it until
confirmation of the Wetland Markers is completed.
A motion made by Mr. McDonough to grant a Certificate of Compliance for DEP # 242-
1642 for Lawrence Municipal Airport, seconded by Ms. Feltovic.
Vote 5-0 unanimous
Documents
Letter, prepared by Randall Christiansen, Stantec, dated 02/06/2018
Letter, prepared by David Rich, Stantec, dated 01/10/2018
Copy of Order of Conditions, 242-1642
WPA Form 8A – Request for Certificate of Compliance, prepared by Stantec
North Andover Conservation Commission Order of Conditions Compliance Certification
Form, prepared by David Rich, Stantec, dated 01/10/2018
Site Photos, October 2017, Runway 32 end safety area 5 Photos
Site Photos, October 2017, Runway 14 end safety area 3 Photos
As-Built Plans, prepared by Stantec, dated July 2016 29 pages
Record Drawings, prepared by Stantec dated July 2016
Chairman Louis Napoli resumes chairing the meeting @ 8:42pm
242-1691, COC Request, Phase 2 Sidewalk & Pedestrian Improvements Route 114/125
(VHB) (MassDOT)
A Motion to continue to July 11, 2018 at the request of the applicant is made by Mr. Manzi
seconded by Ms. Feltovic
Vote 6-0 unanimous
Documents
Email from Jay Quattrocchi dated 06/12/2018 requesting a continuance until the July
11, 2018 meeting.
63 Crossbow Lane Small Project/Enforcement Order
The Administrator states that Mr. Duffy would like to speak to the Commissioners regarding
the sand beach area on his property and the Commission’s decision to have Mr. Duffy
remove this area.
Mr. Dennis Duffy, 63 Crossbow Lane, states that the old shed has been removed from the
property as required by the Commission, Mr. Duffy give the Commission three photographs
of fish life in the water. Mr. Duffy would like the sand to remain and believes the sand is
better for the pond than grass.
There is discussion between the Commissioners and Mr. Duffy about the need to remove the
sand beach area, fencing, table, and fire pit.
9 | Page
North Andover Conservation Commission Meeting Minutes
June 13, 2018
The Commission asks the Administrator to send out a neighborhood letter letting pond
abutters know that all work within the buffer zone requires permitting.
The Commissioners instruct Mr. Duffy to remove the sand, fencing, fire pit, table, and all
other items from the water edge and to restore the area to its natural state.
Enforcement Order/Violation
25 Hollow Tree Lane (Fixler)
The Administrator states that Gregory Hochmuth has done a monitoring report which was to
determine if any additional tree’s need to be planted, or if the Natural regeneration will be
sufficient. The Administrator feels that this site can be revisited after the next monitoring
report in the fall. No additional planting is required at this time.
A motion by Mr. Manzi to continue this matter until the fall monitoring report has been
received, seconded by Ms. Feltovic.
Vote 6-0 unanimous
487 Winter Street (Haddad)
The Administrator reviews the file with the Commissioners.
The Commission discusses the potential need to continue this matter until the next meeting.
The Commission would like the Conservation Administrator to contact the owners of the
property.
A motion to continue until the June 27, 2018 meeting is made my Mr. Manzi, seconded by
Ms. Feltovic.
Vote 6-0 unanimous
851 Forest Street (DeResende)
The Administrator states the owner was before the Commission tonight for an after the fact
RDA regarding the work that was done and that an Enforcement Order was issued for. The
Administrator would ask to have the Commission confirm the Enforcement Order.
A motion made by Mr. Manzi to ratify the Enforcement Order, seconded by Ms. Feltovic.
Vote 6-0 unanimous
325 Great Pond Road (Belko & Reusch)
The Administrator states that the Conservation Department was informed by the DPW of
brush dumping on Great Pond Road Wetland Area. A letter along with photos was sent to the
homeowner and removal of the brush was requested. The Administrator states that the new
brush has been removed but prior dumping is still on site. The Administrator is asking the
Commissioners to ratify the Enforcement Order.
The Commission discusses the non-compliance with the EO and the homeowner’s negative
comments to the Field Inspector. The commission agrees all material should be removed.
A motion made by Mr. Manzi to ratify the Enforcement Order, seconded by Ms. Feltovic.
Vote 6-0 unanimous
Decision
242-1736, 195 Olympic Lane (Crepeau) (Wetland & Land Management)
The Administrator reviews the drafted order of Order of Conditions with the Commissioners.
10 | Page
North Andover Conservation Commission Meeting Minutes
June 13, 2018
A motion to approve the Order of Conditions as amended is made by Mr. McDonough seconded by
Mr. Manzi.
Vote 6-0 unanimous
Commission Elections
A motion is made by Mr. Manzi to nominate Mr. Louis Napoli as Chairman, seconded by Mr.
Lynch.
Vote 5-0 Unanimous
A motion is made by Mr. Louis Napoli to nominate Mr. Albert Manzi Jr. as Vice Chairman,
seconded by Mr. Lynch.
Vote 5-0 Unanimous
Adjournment 9:30
A motion to adjourn is made by Mr. Manzi seconded by Ms. Feltovic
Vote 6-0 unanimous
11 | Page