February 27, 2013
Ms. Judith Tymon
North Andover Town Planner
1600 Osgood Street
North Andover, MA 01845
Re: Regency Place PRD, 464 Appleton St.
North Andover Engineering Department Subdivision Review #2
Dear Ms. Tymon:
We have received a copy of Gene Willis’ February 6, 2013 Subdivision Review #2 for
the above referenced project, and we offer the following response. To facilitate the
review of this information, we have reproduced each of Mr. Willis’ comments in
Italics, and our response to each comment immediately follows.
1. The development utilizes many low impact development (LID) techniques
that require drainage easements outside of the right of way. The DPW
does not have personnel to maintain these facilities. A homeowners
association should be created to maintain the drainage, both inside and
outside the right of way, in perpetuity. There should be reference to the
association in the individual lot deeds.
CSI response: The Subdivision Plans and the Stormwater Management
Operation and Maintenance Plan (O&M Plan) will be revised to reflect the
requirement that a Homeowners Association (HOA) will be established to
maintain Infiltration Basins A and B. The O&M Plan already states that the
owner of each lot will also be responsible for the maintenance of the grass swale
and driveway culvert on and in front of his/her lot. Appropriate deed restrictions
will be placed on the lots.
We disagree that the HOA should maintain the drainage system components that will
lie in the roadway right-of-way. The Low Impact design results in far less roadway
infrastructure for the Town to maintain, and the stormwater design includes just two
catch basins and a Stormceptor that will require routine maintenance. One existing
catch basin that the Town currently maintains will be eliminated. Only about 5,500
square feet of new roadway pavement will contribute to the two catch basins and
Stormceptor. The cost of inspecting and removing the sediment from these devices
should be far less than the cost of maintaining the drainage system from a
convention roadway design. The taxes to be paid by the homeowners should cover
CHRISTIANSEN & SERGI, INC.
PROFESSIONAL ENGINEERS AND LAND SURVEYORS
160 SUMMER STREET, HAVERHILL, MA 01830
tel: 978-373-0310 www.csi-engr.com fax 978-372-3960
z Page 2
the cost of the Town maintaining the drainage system from a small portion of the
road.
2. Much of the drainage infrastructure/swales as shown will be located on
private property. Easements should be created to describe the areas
(swales, basins, structures etc.) and granted to the homeowners
association. Specifically infiltration basins C & D are not delineated with
bearings and distances.
CSI response: Infiltration Basins C and D will be installed to mitigate peak rates
and treat runoff from the driveways of Lots 3 and 4, respectively. Since each of
these basins will only receive runoff from the lot on which it lies, it will be the
responsibility of the individual homeowner, and not the HOA, to maintain the
basin on his/her lot. No easements are necessary since no entity other than the
homeowner (or his/her agents) will need access to the basins. Appropriate deed
restrictions will outline the requirements for perpetual maintenance.
3. The project proposes using a “Stormceptor” to replace the existing catch
basin at STA. 0+23.6. The DPW does not have personnel to maintain this
type of infrastructure. This structure, and the two up gradient catch basins
at STA. 0+37.5, should remain the responsibility of the homeowner’s
association referenced above.
CSI response: Maintenance of the Stormceptor device is similar to catch basin
maintenance. Inspections are made by opening the cover and measuring the
depth of sediment from the surface, and cleaning takes place using a vacuum
truck. We have attached a copy of the Stormceptor maintenance brochure for
further information.
4. An O&M plan for the LID facilities should be created and incorporated in
the home owner’s association. The association should be referenced in
the individual lot deeds.
a. The operation and maintenance of the entire drainage system
listed in the Stormwater Report will remain a private responsibility
in perpetuity.
b. The Board’s decision should reflect this fact preferably with deed
restrictions on the individual lots.
CSI response: The recorded HOA documents will include reference to the
approved O&M Plan, and the individual deeds will reference the HOA. We again
disagree that the HOA should maintain the drainage system components that will
lie within the Town accepted right-of-way.
z Page 3
5. The DPW does not require the newly created subdivision road to be a
through street to the existing Appleton St. roadway.
CSI response: No response necessary.
6. The proposed new roadway entrance should leave Blue Ridge Road with
a negative pitch. The low point in the roadway pavement should occur
opposite the catch basins at STA. 0+37.5.
CSI response: Though the proposed roadway centerline will leave Blue Ridge
Road at a positive pitch, the two proposed catch basins will be set at elevations
lower than the existing pavement in Blue Ridge Road (see roadway profile on
Sheet 8 of the Plans), so runoff from the new road will not flow onto Blue Ridge
Road. It should be noted that §6.8.9 of the Subdivision Regulations allows new
subdivision roads to be constructed with grades of up to 3 percent upgradient or
downgradient from the existing roadway. It is not reasonable to expect
subdivisions where the land is at a higher elevation than the existing roadway to
have a roadway starting with a downhill grade. The current design is consistent with
the applicable regulations.
7. Section 6.9 curbing waiver request. The width of the roadbed subgrade
and gravel fill must extend the full 32 feet wide (4’ at each shoulder) if the
granite curbing is to be waived.
CSI response: The “Subdivision Street with Drainage Swales” detail provided on
Sheet 10 of the Plans is consistent with this request, in that it indicates that the
sub base and gravel are to extend 4 feet beyond the edge of pavement on both
sides of the road.
8. A detail should be provided for water and sewer service connections.
CSI response: The plans will be revised to include the water and sewer service
connection details.
9. Particular attention must be paid to the grass seed mix proposed for the
swales. Should check dams be installed in the steeper sections of the
shoulder drainage swale?
CSI response: The applicant intends to install sod in the swales as soon as the
roadway binder pavement is installed. This will provide immediate stabilization
and will allow the grass to provide filtration for the runoff much sooner than would
occur if seed were used. The “Subdivision Street with Drainage Swales” detail
provided on Sheet 10 of the Plans will be revised to specify sod in place of loam
and seed.
Temporary checks dams will be maintained in the drainage swales during
construction (see Sheet 9 of the Plans). Due to the limited drainage areas and
low velocities of flow expected in the swales, permanent check dams are not
needed (see attached Analysis of Drainage Swale Hydraulics).
10. All accumulated sediment shall be removed from infiltration basins before
roadways are submitted to the town for acceptance.
CSI response: The Subdivision Plans and the Stormwater Management O&M
Plan will be revised to include the recommended notation.
The Definitive Plans and Stormwater Management Report will be revised as noted to
address the comments made by Mr. Willis, Eggleston Environmental, Hancock
Associates, and comments received from other Town Departments.
Please contact me if you have any questions regarding this matter.
Very truly yours,
Chri iansen & Sergi, Inc.
*Phili..
0 Page 4
Inspection and Maintenance. Easy. Convenient.
When it rains, oils, sediment and other contaminants are captured
and contained by over 20,000 Stormceptor units operating
worldwide. While Stormceptor’s patented scour prevention
technology ensures captured pollutants remain in the unit during
all rainfall events, the accumulated pollutants must eventually be
removed as part of a regular maintenance program.
If neglected, oil and sediment gradually build up and diminish any
BMP’s effi ciency, harming the environment and leaving owners and
operators vulnerable to fi nes, surcharges and bad publicity.
Maintenance is a must
Ease, frequency and cost of maintenance are often overlooked by
specifi ers when considering the merits of a stormwater treatment
system. In reality, maintenance is fundamental to the long-term
performance of any stormwater quality treatment device.
While regular maintenance is crucial, it shouldn’t
be complicated. An ongoing maintenance
program with Stormceptor is convenient and
practically effortless. With virtually no disruptions, you can concentrate on
your core business.
Quick inspections
Inspections are easily carried out above ground from any standard surface
access cover through a visual inspection of the orifi ce and drop tee
components. A sludge judge and oil dip-stick are all that are needed for
sediment and oil depth measurements.
Easy unit access
Maintenance is typically conducted from the same surface access cover,
eliminating the need for confi ned space entry into the unit. Your site
remains undisturbed, saving you time and money.
MAINTENANCE
Maintenance_imbrium.indd 1 5/2/2007 8:58:38 AM
No muss, no fuss and fast
Maintenance is performed quickly and inexpensively with a
standard vacuum truck. Servicing usually takes less than
two hours, with no disruption to your site.
A complete stormwater management plan for Stormceptor
extends beyond installation and performance to regular
maintenance. It’s the smart, cost-effective way to ensure
your unit continues to remove more pollutants than any
other separator for decades to come.
Stormceptor maintenance recommendations
Units should be inspected post-construction, prior to being put into service.
Inspect every six months for the fi rst year of operation to determine the oil and sediment
accumulation rate.
In subsequent years, inspections can be based on fi rst-year observations or local
requirements.
Cleaning is required once the sediment depth reaches 15% of storage capacity, (generally
taking one year or longer). Local regulations for maintenance frequency may vary.
Inspect the unit immediately after an oil, fuel or chemical spill.
A licensed waste management company should remove captured petroleum waste products
from any oil, chemical or fuel spills and dispose responsibly.
With over 20,000 units operating worldwide, Stormceptor performs and protects every day,
in every storm.
•
•
•
•
•
•
www.imbriumsystems.com
USA: (888) 279 8826
CANADA: (800) 565 4801
Maintenance_imbrium.indd 2 5/2/2007 8:58:49 AM