Loading...
HomeMy WebLinkAbout20170711 Monitoring reports - Miscellaneous - 175 SALEM STREET 8/21/2017North Andover Planning Board Y�����������������T�N�TU��� CONSTRUCTION/STORMWATER INDEPENDENT . ����/~~�/ n^^���" ,��"n,�� ���owvxnvr�' u_x^ ov/��,�" x��.^ Letter of Agreement Project Address 1175 Salem Street Independent Monitor Name Pack Sullivan,PE Monitor Contact Phone /D( ~��/ ` | Date rw 1 ��� �1/2017 Monitoring Type(s) 0ConstruCtioO |l Stormwater Monitor E-mail This Letter ofAgreement is between the the above named Independent Monftor and the North Andover Planning Board for monitoring services to be provided at the above mentioned Pro' c dd s and in a ce with the conditions and restrictions stated by the Planning Board in it's Dei / .a copy of that Decision has been provided to the Independent Monitor. nitia| of|'depmndont Monitor) By initialing, the Independent Monitor acknowledges receip ecision and an understanding of the conditions/restrictions set by the North Andover Planning Board. The Independent Monitor also acknowledges and agrees that he/she is providing monitoring services for the benefit of the Town of North Andover and is not the project owner or applicant, and does not have a financial or personal interest in the project. Further, the Independent Monitor understands that she/he may not act as the project owners agent, representative, partner, employee or joint -venturer on this project. The Independent Monitor agrees to immediately report to the North Andover Planning Board, via the Town Planner, any violations of the terms of the Decision listed above, as soon as observed or otherwise become known to the Independent Monitor. This report is in addition to regularly scheduled monitoring reports. The Independent Monitor understands that the failure to perfomi under this Letter of Agreement, to the reasonable satisfaction of the North Andover Planning Board, will be grounds for said Independent Monitor to be excluded in this role for any future projects which are within the jurisdiction of the North Andover Planning Board. Independent Moni | | / � Bysigning this Lett of that 1 have read and understandthe terms included herein. Date 108/21/2017 Town ' natume Date 11/15/2017 Town of North Andover Mail - 175 Salem Street NORTH ANDOVER Massachusetts 175 Salem Street 1 message Jean Enright <jenright@northandoverma.gov> Jean Enright <jenright@northandoverma.gov> To: jacksull53@comcast.net Cc: devlin_peter@yahoo.com, Jean Enright <jenright@northandoverma.gov> Jack, Wed, Nov 15, 2017 at 12:19 PM I have had a conversation with Peter Devlin and I have approved temporarily suspending the monitoring through the winter months. Peter has committed to having his contractor install straw mulch at the site be the end of this week. Please let me know if you have any questions. Sincerely, Jean Enright Planning Director Town of North Andover 120 Main Street North Andover, MA 01845 Phone 978.688.9533 Fax 978.688.9542 Email: jenright@northandoverma.gov Web: www.TownofNorthAndover.com cid:image001.jpg@010EOF52.F68A5980 https://mail.google.com/mail/u/0/?ui=2&ik=7c2eff6265&jsver=M-xhRWn0lp0.en.&view=pt&search=inbox&th=15fc0b1 c7d724cb8&siml=15fc0b1 c7d724c... 1/1 Sullivan Engineering Group, LLC Civil Engineers & Land Development Consultants Weekly Monitoring Report Month of September 2017 175 Salem Street, North Andover Monitor: John (Jack) D. Sullivan, III P.E. Date of Inspection: September 12, 2017 (Week of September 11th) 74 degrees/clear - Erosion control in place (silt sock); no sign of erosion - A few trees cut at edge of work area right at limit of work (outside 100 foot wetland buffer) Date of Inspection: September 19, 2017 (Week of September 18th) 65 degrees/raining Erosion control is in good condition; no signs of silt buildup - Foundation hole dug and footing is in place - Drywell has been installed according to the approved plan Date of Inspection: September 26, 2017 (Week of September 25th) 84 degrees/clear - Erosion control in good shape (dry week) - No signs of silt build-up along barriers - Foundation walls have been formed and poured Next week forms to be stripped and foundation backfilled Attached: Site Photos (10) throughout month PO Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail: jacksu1153@comcast.net 4 t, 4 -11 !.! -46 ,4k ' fo 1,41 '44, 1 rt ..;5 Sullivan Engineering Group, LLC Civil Engineers & Land Development Consultants Weekly Monitoring Report Month of October 2017 175 Salem Street, North Andover Monitor: John (Jack) D. Sullivan, III P.E. Date of Inspection: October 4, 2017 (Week of October 2°d) 74 degrees/clear Erosion control in good condition; no signs of erosion or silt migration - Framing starting on garage Site has been rough graded around garage Date of Inspection: October 9, 2017 (Week of October 9th) 74 degrees/rain Erosion control in good condition; 110 signs of erosion or silt migration Inspection took place during 0.37" rain event Framing of garage is complete Date of Inspection: October 16, 2017 (Week of October 16th) 54 degrees/clear Erosion control in good condition; no signs of erosion or silt migration - Site has been roughed graded Date of Inspection: October 25, 2017 (Week of October 23rd) Inspection took place during 0.88" rain event Erosion control in good condition; no signs of site erosion - Owner is going to try an loam/seed disturbed areas early next week Date of Inspection: November 2, 2017 (Week of October 30th) - 0.91" rain event on 10/29 0.34" rain event on 10/30 - Erosion control is in good condition - Spoke with contractor and loam/seed to take place next week Attached: Site Photos (11) throughout month PO Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail: jacksul153@comcast.net 411* g 1,;;, 0 0 , 4.1 ";',A1„'1”, 144111k **- 1.i 4)1 • 4,-