HomeMy WebLinkAbout2011-07-05 Planning Board Supplemental Materials (55)
Section 8.9.7
7.Modifications
a)A modification of a wireless service facility may be considered equivalent to an
application for a new wireless service facility and will require a Special Permit when
the following events apply:
i) The applicant and/or co-applicant want to add any equipment or additional height
not specified in the original design filing.
ii)The applicant and/or co-applicant want to alter the terms of the Special Permit by
changing the wireless service facility in one or more of the following ways:
(1)Change in the number of facilities permitted on the site;
(2)Change in technology used for the wireless service facility.