STORMWATER MANAGEMENT OPERATION AND
MAINTENANCE MANUAL
For
Definitive Subdivision Plan
Tax Map 61, Lots 16 & 34
Route 125 & Bradford Street
North Andover, Ma. 01845
For
G.M.Z. Realty Trust
1679 Osgood Street
North Andover, Ma 01845
Prepared by:
Jones & Beach Engineers, Inc.
85 Portsmouth Avenue
P.O. Box 219
Stratham, NH 03885
(603) 772-4747
May 18, 2011
Revised July 8, 2011
JBE Project No. 06163
Inspection and Maintenance of Facilities and Property
A. Maintenance of Common Facilities or Property
GMZ Realty Trust is responsible for maintenance of all stormwater infrastructure associated with
the facility and the property. This includes all temporary and permanent stormwater and erosion
control facilities, roadways, and parking areas during construction. Once the roadway is
accepted, the Town of North Andover will be maintaining the drainage system within the Right
of Way (R.O.W.). All drainage facilities outside the road R.O.W. are to be maintained by the
homeowners association.
B. General Inspection and Maintenance Requirements
1.Temporary and permanent stormwater and sediment and erosion control facilities to be
maintained on the site include but are not limited to the following:
a.Silt fencing and/or organic filter berms
b.Temporary diversion and swales
c.Erosion control blankets
d.Culvert and catch basin inlet protection measures
e.Construction entrances
f.Culverts
g.Swales
h.Vegetation and landscaping
i.Roadways
j.Riprap inlet and outlet protection aprons
k.Multi-stage discharge outlet structures
l.Water Quality ponds
m.Plunge pools
n.Gravel wetlands
o.Raingardens
2. Maintenance of temporary measures shall follow the following schedule:
a.The general contractor shall strictly adhere to the Stormwater Pollution Prevention
Plan (SWPPP) during construction operations.
inspected during and after
b.During the construction process, all silt fencing will be
storm events
to ensure that the fence still has integrity and is not allowing sediment
to pass. Any section of fence that has failed or is failing is to be replaced
immediately, overlapping adjacent fence sections by at least one foot. If the problem
persists, measures such as additional fencing (i.e. double) or the addition of haybales
on the project side of the fence line should be considered. Sediment is to be removed
from behind the fencing if found to be deeper than six inches and disposed of
properly.
C:\\Users\\gcp\\AppData\\Local\\Temp\\2\\2011-09-06 Planning Board Supplemental Materials (21)_28475\\2011-09-06 Planning Board Supplemental
Materials (21).docx
c.Sediment is to be removed from behind diversions if found to be deeper than six
inches and disposed of properly.
inspected after every major
d.Areas protected by erosion control blankets should be
rain event
in order to ensure that that matting has not come loose from the
underlying soil. Any areas found to be out of place should be re-secured with the
appropriate staking material.
inspected once per week
e.Culvert inlet protection measures should be and after every
major storm event. Sediment accumulations around the stone should be removed if
they are deeper than six inches. If extensive amounts of sediment appear to have
become trapped within the gravel filter stone such that proper operation of the
structure has become impractical, the stone should be cleaned or otherwise replaced.
inspected weekly
f.The stabilized construction entrance(s) shall be and after every rain
event in order to ensure that the pad(s) are not becoming choked with sediment.
Additional stone shall be added if required.
g.All stormwater facilities, including catch basins and detention ponds, shall have any
accumulated sediment and debris removed from them and disposed of properly once
construction has been completed.
h.All construction debris and trash shall be removed from the site at the completion of
construction and disposed of properly.
i.Once construction has been completed, the contractor is to remove all temporary
erosion control measures and, if necessary, smooth and revegetate the areas disturbed
by the removal.
3. Town Maintenance of permanent measures shall follow the following schedule:
a.Normal winter roadway maintenance including plowing and snow removal, salting,
and sanding.
b.Road sweeping at the end of every winter, preferably at the start of the spring rain
season.
Inspectiononce per month
c. of culvert inlets and outlets at least during the rainy
season (March to November). Any debris is to be removed and disposed of properly.
Annual inspection
d. of the site for erosion, destabilization, settling, and sloughing.
Any needed repairs are to be conducted immediately.
Annual inspection
e. of site’s vegetation and landscaping. Any areas that are bare shall
be reseeded and mulched with hay or, if the case is extreme, loamed and seeded or
sodded to ensure adequate vegetative cover. Landscape specimens shall be replaced
in kind if they are found to be dead or dying.
C:\\Users\\gcp\\AppData\\Local\\Temp\\2\\2011-09-06 Planning Board Supplemental Materials (21)_28475\\2011-09-06 Planning Board Supplemental
Materials (21).docx
inspected and cleaned a minimum of once per
f.Deep sump catch basins should be
year
. Any sediment accumulated shall be removed if it is deeper than one half the
depth from the bottom of the basin to the lowest pipe invert in the basin.
4. Homeowner/Homeowner Association Maintenance of permanent measures shall follow
the following schedule:
a.Ponds require timely maintenance and should be inspected after every major storm
event, as well as frequently during the first year of operation, and annually thereafter.
Every five years, the services of a professional engineer should be retained to perform
a thorough inspection of the pond and its infrastructure. Any debris and sediment
accumulations should be removed from the outlet structure(s) and emergency
spillway(s) and disposed of properly. Pond berms should be mowed at least once
annually so as to prevent the establishment of woody vegetation. Trees should never
be allowed to grow on a pond berm, as they may destabilize the structure and increase
the potential for failure. Areas showing signs of erosion or thin or dying vegetation
should be repaired immediately by whatever means necessary, with the exception of
fertilizer. Rodent borrows should be repaired immediately and the animals should be
trapped and relocated if the problem persists.
b.Gravel wetlands and sediment forebay inspection and maintenance criteria is as
follows:
1st Year Post-Construction: Inspection frequency should be after every major storm
in the first year following construction.
Inspect to be certain system drains within 24-72 hrs (within the design period, but
also not so quickly as to minimize stormwater treatment)).
Watering plants as necessary during the first growing season
Re-vegetating poorly established areas as necessary
Treating diseased vegetation as necessary
Quarterly inspection of soil and repairing eroded areas, especially on slopes
Checking inlets, outlets, and overflow spillway for blockage, structural integrity,
and evidence of erosion.
Post-Construction: Inspection frequency should be at least every 6 months thereafter,
as per USEPA Good House-Keeping Requirements. Inspection frequency can be
reduced to annual following 2 years of monitoring that indicates the rate of sediment
accumulation is less than the cleaning criteria listed below. Inspections should focus
on:
Checking the filter surface for dense, complete, root mat establishment across the
wetland surface. Thorough revegetation with grasses, forbs, and shrubs is
necessary. Unlike bioretention, where mulch is commonly used, complete surface
coverage with vegetation is needed.
Checking the gravel wetland surface for standing water or other evidence of riser
clogging, such as discolored or accumulated sediments.
Checking the sedimentation chamber or forebay for sediment accumulation, trash,
and debris.
C:\\Users\\gcp\\AppData\\Local\\Temp\\2\\2011-09-06 Planning Board Supplemental Materials (21)_28475\\2011-09-06 Planning Board Supplemental
Materials (21).docx
Inspect to be certain the sedimentation forebay drains within 24 to 72 hrs.
Checking inlets, outlets, and overflow spillway for blockage, structural integrity,
and evidence of erosion.
Removal of decaying vegetation, litter, and debris.
Mow grass areas periodically so that grass does not exceed 4" in height.
Cleaning Criteria for All Sedimentation Forebays: Sediment should be removed from
the sedimentation chamber (forebay) when it accumulates to a depth of more than 12
inches (30 cm) or 10 percent of the pretreatment volume. The sedimentation forebay
should be cleaned of vegetation if persistent standing water and wetland vegetation
becomes dominant. The cleaning interval is once every year. A dry sedimentation
forebay is the optimal condition while in practice this condition is rarely achieved.
The sedimentation chamber, forebay, and treatment cell outlet devices should be
cleaned when drawdown times exceed 60 to 72 hours. Materials can be removed with
heavy construction equipment; however this equipment should not track on the
wetland surface. Revegetation of disturbed areas as necessary. Removed sediments
should be dewatered (if necessary) and disposed of in an acceptable manner.
Cleaning Criteria for Gravel Wetland Treatment Cells: Sediment should be removed
from the gravel wetland surface when it accumulates to a depth of several inches (>10
cm) across the wetland surface. Materials should be removed with rakes rather than
heavy construction equipment to avoid compaction of the gravel wetland surface.
Heavy equipment could be used if the system is designed with dimensions that allow
equipment to be located outside the gravel wetland, while a backhoe shovel reaches
inside the gravel wetland to remove sediment. Removed sediments should be
dewatered (if necessary) and disposed of in an acceptable manner.
Draining and Flushing Gravel Wetland Treatment Cells: For maintenance it may be
necessary to drain or flush the treatment cells. The optional drains will permit simpler
maintenance of the system if needed. The drains need to be closed during standard
operation. Flushing of the risers and horizontal subdrains is most effective with the
entire system drained. Flushed water and sediment should be collected and properly
disposed.
c.Raingarden - Bioretention Cells:
Visually inspect monthly and repair erosion. Use small stones to stabilize erosion
along drainage paths.
Check the pH once or twice a year. Apply an alkaline product, such as limestone,
if needed.
Re-mulch any void areas by hand as needed.
Every 6 months, in the spring and fall, add a fresh mulch layer.
Once every 2 to 3 years, in the spring, remove old mulch layer before applying
new one.
Immediately after the completion of cell construction, water plant material for 14
consecutive days unless there is sufficient natural rainfall.
When trees have taken root, or at least by 6 months, remove stakes and wires.
C:\\Users\\gcp\\AppData\\Local\\Temp\\2\\2011-09-06 Planning Board Supplemental Materials (21)_28475\\2011-09-06 Planning Board Supplemental
Materials (21).docx
Once a month (more frequently in the summer), visually inspect vegetation for
disease or pest problems.
If treatment is warranted, use the least toxic approach.
Twice a year, from March 15th to April 30th and October 1st to November 30th,
remove and replace all dead and diseased vegetation considered beyond
treatment.
During times of extended drought, look for physical features of stress (unrevived
wilting, yellow, spotted or brown leaves, loss of leaves, etc.). Water in the early
morning as needed.
Weed regularly, if needed.
Prune excess growth annually or more often, if desired. Trimmed materials may
be recycled back in with replenished mulch or land filled if there is a concern of
heavy metals accumulation.
After rainstorms, inspect the cell and make sure that drainage paths are clear and
that ponding water dissipates over 4-6 hours. (Water may pond for longer times
during the winter and early spring.)
KEEP IN MIND, THE BIORETENTION CELL IS NOT A POND. IT SHOULD
NOT PROVIDE A BREEDING GROUND FOR MOSQUITOES.
MOSQUITOES NEED AT LEAST FOUR (4) DAYS OF STANDING WATER
TO DEVELOP AS LARVA.
d. House Roof Infiltration System:
The following recommendations will help assure that the roof infiltration system
is maintained to preserve its effectiveness.
Once the system has been constructed, it should be tested by inserting a garden
hose into the inlet and allowing the water to run for a minimum of one (1) hour.
The water should stay underground within the gravel. If water comes out of the
overflow, the system should be further inspected and possibly replaced. This
procedure should be performed every year during the fall inspection.
In the spring and fall, visually inspect the area around the system and repair any
erosion. Use small stones to stabilize erosion along drainage paths. Re-mulch any
void areas by hand as needed. Also inspect the roof collection and piping and
clean and repair as necessary.
Do not plant deep rooted trees and shrubs within 5’ of the system.
Keep heavy vehicles from driving or parking over the system.
C:\\Users\\gcp\\AppData\\Local\\Temp\\2\\2011-09-06 Planning Board Supplemental Materials (21)_28475\\2011-09-06 Planning Board Supplemental
Materials (21).docx
Any inquiries in regards to the design, function, and/or maintenance of any one of the
above mentioned facilities or tasks shall be directed to the project engineer:
Jones and Beach Engineers, Inc.
Attn: Michael Kerivan, P.E.
85 Portsmouth Avenue
P.O. Box 219
Stratham, NH 03885
T#: (603) 772-4747
F#: (603) 772-0227
C:\\Users\\gcp\\AppData\\Local\\Temp\\2\\2011-09-06 Planning Board Supplemental Materials (21)_28475\\2011-09-06 Planning Board Supplemental
Materials (21).docx
Commitment to maintenance requirements
I agree to complete and/or observe all of the required maintenance practices and their
respective schedules as outlined above.
___________________________________________
G.M.Z. Realty Trust
___________________________________________
Print Name
___________________________________________
Date
C:\\Users\\gcp\\AppData\\Local\\Temp\\2\\2011-09-06 Planning Board Supplemental Materials (21)_28475\\2011-09-06 Planning Board Supplemental
Materials (21).docx
STORM WATER POLLUTION PREVENTION PLAN
INSPECTION REPORT (Page 1 of 3)
FORM C-1
G.M.Z. Realty Trust
Inspections/reports must be completed every seven (7) days and before and within 24-hours after a storm event.
Inspection Type: Routine (every 7 calendar days) During Storm Date: _____________
Pre-Storm Post-Storm
Weather information for period since last inspection: Weather during inspection: _________________________
Storm Start Time: _________________________ _______________________________________________
Storm Duration: ___________________________ Description of any discharge during inspection: _________
Approximate Amount of Rainfall (inches): ______ _______________________________________________
Based on the results of the inspection, necessary control modifications shall be initiated within 24 hours and completed within 48 hours.
These reports shall be kept on file as part of the Storm Water Pollution Prevention Plan for at least five (5) years from the date of
completion and submission of the Final Stabilization Certification/Termination Checklist and Notice of Termination. A copy of the
SWPPP shall be kept at the site at all times during construction.
Certification Statement:
“I certify under penalty of perjury that I personally conducted this inspection and I personally prepared this inspection summary report
noting the deficiencies in BMPs and the corrective actions taken. I certify that the information in this report is true, accurate, and
complete. I am aware that there are significant penalties for submitting false information, including fines and imprisonment for knowing
violations”
Name of Inspector: ______________________________ Title of Inspector: ___________________________
Qualifications of Inspector:
Inspector’s Signature:
Construction phasing/sequencing is consistent with the SWPPP and Erosion Control Plans: ٱ Yes ٱ No
Compliance Certification
I certify that, based on no incidents of non-compliance identified during the inspection, the site is in compliance with the SWPPP
and the Construction General Permit
Name of Authorized Representative (Printed):
Signature of Authorized Representative:
Date:
*Note: This Compliance Certification is only to be signed by Authorized Representative (Project Manager) when
there are no “unsatisfactory” conditions and the construction phasing/sequencing is consistent with the SWPPP,
rendering the site in full compliance with the SWPPP and the Construction General Permit.
C:\\Users\\gcp\\AppData\\Local\\Temp\\2\\2011-09-06 Planning Board Supplemental Materials (21)_28475\\2011-09-06 Planning Board Supplemental
Materials (21).docx
Form C-1 Continued
Satisfactory
Maintenance Needed Implementation Date
Inspection Areas Location
Indicate if BMP is Inadequate For The Location of Corrective Action
Yes No N/A
Points of Discharge (if
inaccessible inspect
nearby downstream locations)
Construction Entrance/Exit
Perimeter Control Measures
Temporary Sediment Basins,
Gravel and Rip-rap Basins and
Sediment Traps
Inlet Protection
Outlet Stabilization
Material Laydown and
Staging Area
Storm Drainage Culverts
Curb and Gutter
Gravel Wetland #1
Infiltration Basin #2
Non-Stormwater Discharges
Slope Stabilization
Stormwater channels
Page 2 of 3
Form C-1 Continued
Satisfactory
Maintenance Needed Implementation Date
Inspection Areas Location
Indicate if BMP is Inadequate For The Location of Corrective Action
Yes No N/A
Temporary or Permanent
Seeding, Sodding, Mulching
or Landscaping
Pipe Slope Drains
Material Management and
Storage
Solid and Construction Waste
Sanitary Wastes
Non-Stormwater Discharges
Raingarden Lot 16-1
Raingarden Lot 16-2
Raingarden Lot 16-4
Raingarden Lot 16-5
Raingarden Lot 16-6
Raingarden Lot 31
Headwall
F.E.S. #1
F.E.S. #2
Location(s) Where Additional
BMP is Needed That Was Not
Shown On The Plan
“As of the date set forth below I certify under penalty of law that I personally reviewed this inspection report and personally noted any incidents of non-compliance with
permit conditions. Where this report does not identify any incidents of non-compliance I have certified that the construction project or site is in compliance with the SWPPP
and this permit (Form C-1 page 1 of 3). Based on my observations of the inspection report and of the site, to the best of my knowledge and belief, I certify that the
information in this inspection report is true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including fines and
imprisonment for knowing violations.”
Page 3 of 3 Project Manager: ______________________________
C:\\Users\\gcp\\AppData\\Local\\Temp\\2\\2011-09-06 Planning Board Supplemental Materials (21)_28475\\2011-09-06 Planning Board Supplemental Materials (21).docx
STORM WATER POLLUTION PREVENTION PLAN
Stabilization Schedule for Major Grading Activities
FORM C-2
Note: If activities cease for more than 14 days these columns need to
be completed.
Type of Stabilization
Major Site Begin Completion Temporary Resume Date Begin Date for Begin Date for (List measures used such as stone, Contractor Responsible
Construction Activity Date Date Cease Date Stabilization Stabilization seeding, mulch, landscaping, etc…) for Work
Areas Temporary Permanent
Temp. Gravel
Const. Entrance
Sediment Trap/Basin
Mass Grading
Entry Drive
Stormwater
Detention/Retention
Pervious Areas
STORM WATER POLLUTION PREVENTION PLAN
IMPLEMENTATION SCHEDULE
FORM C-3
G.M.Z. Realty Trust
*To be completed prior to initiation of construction by the contractor.
The Contractor will be responsible for implementing all erosion control and storm water management control
structures. The Contractor may designate these tasks to certain subcontractors as they see fit, but the ultimate
responsibility for implementing these controls and ensuring their proper functioning remains with the Contractor.
*Proposed *Proposed Actual Actual Contractor
Construction Activity Initiation Date Completion Initiation Completion Responsible for
Date Date Date Implementation
A pre-construction meeting shall be held by the
Project Manager and the Operator’s Engineer prior to
land disturbing activities. 14 days prior to the start of
any
land disturbing activity, it is the responsibility of
the site’s General Contractor and the Site Developer
(or Owner) to both file a Notice of Intent (NOI) form
and a copy of one (shared) Stormwater Pollution
Prevention Plan (SWPPP) with the State of MA
Department of Environmental Protection (MADEP)
in order to gain coverage under the MADES
Construction General Permit for Construction
Activities.
Construct temporary construction exits at locations
shown on the SWPPP plan sheet.
Install perimeter silt fences and temporary sediment
basin in the locations shown on the SWPPP plan
sheet.
Begin clearing and grubbing operations. Clearing and
grubbing shall be done only in areas where earthwork
will be performed and only in areas where building is
planned to commence within 14 days after clearing
and grubbing.
Commence site grading.
Disturbed areas of the site where Construction
Activity has ceased for more than 14 days shall be
temporarily seeded and watered.
Install inlet/outlet protection at the locations of all
grate inlets, curb inlets, and at the ends of all exposed
storm sewer pipes.
Finalize pavement subgrade preparation.
Construct all curb and gutter, gutter inlets, area inlets,
and storm sewer manholes, as shown on the plans.
Inlet protection may be removed temporarily for this
construction. Place required riprap at locations shown
on the plans.
Remove inlet protection around inlets and manholes
no more than 48 hours prior to placing stabilized base
course.
Install base material as required for pavement.
Carry out final grading and seeding and planting.
Remove silt fencing only after all paving is complete
and exposed surfaces are stabilized.
Clean site and all drainage structures, pipes, and
sumps of all silt and debris.
Remove temporary construction exits only prior to
pavement construction in these areas (These areas are
to be paved last).
C:\\Users\\gcp\\AppData\\Local\\Temp\\2\\2011-09-06 Planning Board Supplemental Materials (21)_28475\\2011-09-06 Planning Board
Supplemental Materials (21).docx
STORM WATER POLLUTION PREVENTION PLAN
MODIFICATION REPORT
FORM D-1
G.M.Z. Realty Trust
CHANGES REQUIRED FOR STORM WATER POLLUTION PREVENTION PLAN
The SWPPP must be amended whenever there is a change in design, construction, operation, or maintenance at
the construction site that has a significant effect on the discharge of pollutants to the waters of the United States
that has not been previously addressed in the SWPPP, if inspections or investigations by site staff, local, state or
federal officials determine that discharges are causing water quality exceedances or the SWPPP is ineffective in
eliminating or significantly minimizing pollutants in storm water discharges from the construction site, or based
on the results of an inspection, or there is a release containing a Hazardous Substance or Oil in an amount equal
to or in excess of a reportable quantity established under either 40 CFR Part 110, 40 CFR Part 117, or 40 CFR
Part 302 occurs during a 24 hour period, the SWPPP must be modified to include additional or modified BMPs
designed to correct identified problems. Revisions to the SWPPP must be completed within seven (7) calendar
days following the inspection. Modifications that are the result of inspections shall be initialed within 24 hours
and completed within 48 hours.
To: Project Manager Date:
Address:
Site:
Telephone:
Facsimile:
Sent Via: Facsimile Courier US Mail
MODIFICATION
INSPECTOR: DATE: NUMBER:
(Print)
___________________________________
(Signature)
QUALIFICATIONS OF INSPECTOR:
CHANGES REQUIRED TO THE STORMWATER POLLUTION PREVENTION PLAN:
REASONS FOR CHANGES:
TO BE PERFORMED BY: ON OR BEFORE:
Project Manager:
C:\\Users\\gcp\\AppData\\Local\\Temp\\2\\2011-09-06 Planning Board Supplemental Materials (21)_28475\\2011-09-06 Planning Board
Supplemental Materials (21).docx
STORM WATER POLLUTION PREVENTION PLAN
Inspection Report for Long Term Maintenance Activities (to be performed by the Town of North Andover)
Satisfactory
Maintenance Needed Implementation Date
Inspection Areas Location
Indicate if BMP is Inadequate For The Location of Corrective Action
Yes No N/A
Points of Discharge (if
inaccessible inspect
nearby downstream locations)
Inlet Protection
Outlet Stabilization
Gravel Wetland #1
Gravel Wetland #1 Outlet
Pond
Infiltration Basin #2
Storm Drainage Culverts
Deep Sump Catch Basins
Curb and Gutter
Stormwater channels
C:\\Users\\gcp\\AppData\\Local\\Temp\\2\\2011-09-06 Planning Board Supplemental Materials (21)_28475\\2011-09-06 Planning Board Supplemental Materials (21).docx