Loading...
HomeMy WebLinkAbout- Certificate of Compliance - 2198 TURNPIKE STREET 9/6/2018 (3) ------------------ 16 . PUBLIC HEALTH DEPARTMENT Town of North Andover Community and Economic Development Division CERTIFICATE OF COMPLIANCE As of: September 6, 2018 This is to certify that the individual subsurface disposal system received a SATISFACTORY INSPECTION of the: :Full Repair ofOn-Site Sewage Disposal System By: Joseph Watson At: 2198 Turnpike Street Map 108.0 Lot rth. Andover, MA 01.845 Tl e,� swan . of this ee4ifi ate Mall riot be �onstrued as a guarantee that the system will function satisfactorily. ,r ,µ Michele.Grant Public Health Inspeeto. ..,...,� i i -- -------------- 120 Main St.,North Andover,Massachusetts 01845 Phone 978.688.9540 Fax 978.688.9542 Web www.northandoverma.gov