Loading...
HomeMy WebLinkAbout- Correspondence - 2198 TURNPIKE STREET 9/6/2018 North Andover Health Department Community and Economic Development Division Jude 1.9, 2018 Jorge Solano 2198 Turnpike Street North.Andover, MA 01845 Re: Subsurface Sewage Disposal System Plan for 2198 Turnpike Street (Map 1080 Lot 6) To Whom It May Concern: The proposed wastewater system design plan for the above site dated June 20, 2017 with a final revision date of May 25, 2018 and received on May 29, 2018 has been approved. The design has been approved for use in the construction of a repaired on-site septic system for a three (3) bedroom, seven (7) room maximum, residential dwelling, utilizing a 1500 gallon septic tank and 4 Infiltrator(Quick4 Standard Chamber)leaching trenches. This design plan approval is valid until June 19, 2021. During this time, a licensed septic system installer must obtain a permit and complete this work, and a Certificate of Compliance be endorsed by the installer, designer and the Town of North Andover. This approval is also subject to the:following conditions: I. If site conditions are found in the field to be different from those indicated on the design plan and/or soil evaluation, the originally issued Disposal System.Construction Permit is void, installation shall stop, and the applicant shall reapply for a new Disposal Systems Construction.Permit(3 10 CMR 1.5.020(1)). 2. It is the responsibility of the applicant and/or the applicant's septic system designer, septic system installer or other representative to ensure that all other state and municipal requirements are met. These may include review by the Conservation Commission, Zoning Board,Planning Board,Building Inspector, Plumbing Inspector Page l of 2 North Andover Health Department Town Hall, 120 Main Street North Andover,MA 01845 Phone: 978.688.9540 Fax: 978.688. 9542 2198 Turnpike Street June 19, 2018 and/or Electrical Inspector. The issuance of a Disposal System Construction Permit shall not construe and/or imply compliance with any of the aforementioned requirements. Please feel free to contact the office with any questions you may have. We look forward to working with you to obtain a wastewater treatment and dispersal system which will be in compliance with all regulations and assure protection of public health and the environment of North Andover. 1.31(an Y"LaGrasse,'CERT Director of Public Health Encl. Installers list cc: Engineer File Page 2 of 2 North Andover Health Department Town Hall, 120 Main Street North Andover, MA 01845 Phone: 978.688.9540 Fax: 97 .688. 9542