Loading...
HomeMy WebLinkAbout- Correspondence - 2198 TURNPIKE STREET 9/6/2018 (3) JM ASSOCIATES Land Planning-Civil Eiigineering-Surveying 325 Main St. North Reading, Ma. 01864 Tel. 978-664-6668 Fax 978-664-8155 yLinylij ma s s o c L-a t Qsg o n). May 25, 2018 Brian LaGrasse Director North Andover Health Dept. 120 Main St. D North Andover, Ma 0 184 5 0VP Re: Local Variance Request 2198 Turnpike St. Septic System Dear Mr. LaGrasse On behalf of Mr. Jorge Solano I hereby request a variance from the North Andover Board of Health in regard to NA BOH Table I Setback Distances. Table 1 requires a setback distance of 100 feet from a soil absorbtion system to a wetland resource area. Given the tight configuration of the parcel and the constraints of the existing conditions I believe the location of the soil absorbtion system is in the most logical area. It is my opinion that a level of environmental protection equivalent to that provided under NA BOH Table I can be achieved without strict application of this provision Thank you for your attention to this matter. Very Truly Yours, �A OF ior1N 17 94 MCQUIL IN Jr, Cj 0CIVIL John McQuilkin PE No.31 Principal Engineer '9' -IS ' JM Associates e6'810NAV_ Cc: Jorge Solano