HomeMy WebLinkAbout2012-06-19 Planning Board Supplemental Materials
PLANNING DEPARTMENT
Community Development Division
1600 Osgood Street
North Andover, Massachusetts, 01845
SITE PLAN REVIEW DECISION - DRAFT
Any appeal shall be filed
within (20) days after the
date of filing this notice in
the office of the Town Clerk.
Date:
June 19, 2012
Date of Hearing:
March 20, 2012,April 3,
2012, May 1, 2012, June 5, 2012, June
19, 2012
Date of Decision:
June 19, 2012
Petition of: Jeffco, Inc.
P.O. Box 802
Andover, MA 01810
Premises Affected: Rear Lot, LLC
26 Main St.
Assessors Map 28 Lot 14
Referring to the above petition for a Site Plan Special Permit, from the requirements of the North Andover
Zoning Bylaw, Sections 8.3, 10.3, 10.31 and 18, and M.G.L. c.40A, Sec. 9.
So as to allow the construction of an 8-unit residential condominium dwelling unit, on a lot with access to
Main St. via an existing driveway which is located on two lots with frontage on Main St., with parking
spaces, associated landscaping, stormwater management and installation of utilities. The project also
includes the demolition of existing out-buildings, in the Industrial S (I-S) and Downtown Overlay Zoning
District.
nd
APPROVE
After a public hearing given on the above date, and upon a motion by X and 2 by X to the Site
X– 0 in favor
Plan Special Permit, as amended, and based upon the following conditions. The vote was of
the application.
__________
On behalf of the North Andover Planning Board
John Simons, Chairman
Richard Rowen
Timothy Seibert
Michael Colantoni
Dave Kellogg
1
26 Main St.
Map 28, Parcel 14
Site Plan Special Permit - Multi-Family Dwelling Unit
The Planning Board herein APPROVES a Site Plan Review Special Permit to allow the construction of an 8-
unit residential condominium dwelling unit, on a lot with access to Main St. via an existing driveway which
is located on two lots with frontage on Main St., with parking spaces, associated landscaping, stormwater
management and installation of utilities. The project also includes the demolition of existing out-buildings, in
the Industrial S (I-S) and Downtown Overlay Zoning District. The project is located at 26 Main St., North
Andover, Massachusetts, 01845, Assessors Map 28, Parcel 14, within the Industrial S (I-S) and Downtown
Overlay Zoning District. The parcel totals approximately 24,776 sq. ft. with zero frontage on Main Street and
access via an existing driveway located at 22-24 Main St and 28-30 Main St. This Special Permit was
Jeffco, Inc., PO Box 802, Andover MA, 01810.
requested by The application was filed with the Planning
Board on or about February 7, 2012. The public hearing on the above referenced application was opened on
March 20, 2012, with additional hearings on April 3, May 1, and June 5, 2012, and closed by the North
Andover Planning Board on June 19, 2012. The applicant submitted a complete application, which was
noticed and reviewed in accordance with Section 8.3, 10.3, 10.31 and 18 of the Town of North Andover
Zoning Bylaw and MGL C.40A, Sec. 9.
The Planning Board makes the following findings as required by the North Andover Zoning Bylaws
Sections 8.3, 10.3, 10.31 and 18.
FINDINGS OF FACT:
1) The specific site is an appropriate location for the project as it is the construction of a multi-
family dwelling unit within the Downtown Overlay District, which encourages dense residential
development within the “downtown” North Andover area. The project includes access to new
dwelling units over an existing driveway located on two lots with frontage on Main St: 22-24
Main St. and 28-30 Main St. Access to Main St is over a driveway on the north side of 22-24
Main St. Parking will be provided within the units as well as in front of each unit, with
additional visitor parking. A stormwater management system and extensive landscaping are
included in the project.
2) The owners of the parcel applied for and received the following zoning variances from the town
of North Andover Zoning Board of Appeals on 2/13/09 for construction of a commercial storage
building: Variance for relief of lot area (50,000 sq. ft. required); Variance for frontage (150 ft.
required); Variance for left side setback (20 ft. required);Variance for Floor Area Ratio (.50:1
required).The owner also received a modification of that ZBA Decision on 2/14/12 to allow a
change of use to Residential from Industrial use.
3) The project provides for adequate facilities for vehicular access by utilizing an existing driveway
located on two parcels with frontage on Main St. The applicant submitted a traffic report,
authored by Dermot Kelly, which estimates that the 8-unit condominium would generate 46
vehicle trips per day, 4 vph during weekday morning peak hours and 4 vpd during weekday
evening peak hours.
4) The Fire Department has determined that the development provides adequate access for fire and
safety vehicles. The entryway provides 15 ft. of unobstructed travel way to access the structure
2
26 Main St.
Map 28, Parcel 14
Site Plan Special Permit - Multi-Family Dwelling Unit
and also contains a total of 18 feet in front of the structure. These areas will be marked as “Fire
Lanes” and will be free of obstruction and maintained as such in perpetuity.
5) Based on input received from both the Planning Board and the Planning Board’s consultant, the
applicant has provided sufficient stormwater management facilities to mitigate flow and to
provide treatment for stormwater. The project will result in a decrease of impervious cover due
to the removal of the existing pavement and two out-buildings on the site. The stormwater
management system will include a 500 gallon drywell to treat roof runoff. Stormwater runoff
from the paved driveway area will discharge to a deep sump, hooded catchbasin and a
Stormceptor unit.
6) Finally the Planning Board finds that this project generally complies with the Town of North
Andover Zoning Bylaw requirements as listed in Sections 8.3.5, and 18, but requires conditions
in order to be fully in compliance. The Planning Board hereby grants an approval to the
applicant providedthe following conditions are met:
PERMIT DEFINITIONS and WAIVERS
1) The “Locus” or “Site” refers to the 24,776 sq. ft. parcel of land with zero frontage as shown on
Assessors Map 28, Parcel 14, and also known as 26 Main Street , North Andover,
Massachusetts.
2)
The “Plans” refer to the plans prepared by Andover Consultants Inc., 1 East River Place,
Methuen, MA 01844, entitled “Site Plan ”Pondview” 26 Main Street North Andover, Mass.”,
dated January 19, 2012, as most recently revised on May 10, 2012, and June 7, 2012
consisting of sheets 1 through 4
3)The “Project” refers to the construction of an 8-unit residential condominium dwelling
unit, on a lot with access to Main St. via an existing driveway which is located on two
lots with frontage on Main St., with parking spaces, associated landscaping, stormwater
management and installation of utilities. The project also includes the demolition of
existing out-buildings, in the Industrial S (I-S) and Downtown Overlay Zoning District.
4) The “Applicant” refers to Jeffco, Inc., PO Box 802, Andover, Ma 01810, the applicant for the
Special Permit, its successors and assigns.
5) The “Project Owner” refers to the person or entity holding the fee interest to the title to the Locus
from time to time, which can include but is not limited to the applicant, developer, and owner.
SPECIAL CONDITIONS
PRIORTO ENDORSEMENT OF PLANS
1)
A) The driveway located on 22-24 Main St. (Map 28, Parcel 12) and 28-30 Main St. (Map 28, Parcel
13) and the parking area in the front of the building, as well as all stormwater structures, will be
maintained by a Homeowner’s Association, with the terms of ownership and maintenance to be
documented in the Bylaws for the HOA. Maintenance of the driveway and parking area will
include installation and maintenance in perpetuity of all “No Parking” signs and “Fire Lane”
pavement markings.
B) A restriction will be placed on the deed for each unit with reference to ownership and
maintenance of driveways, parking areas and stormwater structures by the Homeowner’s
Association.
3
26 Main St.
Map 28, Parcel 14
Site Plan Special Permit - Multi-Family Dwelling Unit
C) Draft easement documents and Homeowner’s Association Agreements must be submitted for
review by Town Counsel.
D) No outside storage or dumpsters are allowed. This condition will also be documented in the
Homeowner’s Association bylaws.
E) The developer shall provide the Planning Board with copies of permits, plans and decisions
received from all North Andover Land Use Boards.
PRIOR TO THE START OF SITE WORK OR CONSTRUCTION
2)
A) Three (3) copies of the signed, recorded decision and the recorded plans must be delivered to the
Planning Department.
B) The applicant shall designate an independent Construction Monitor who shall be chosen in
consultation with the Planning Department staff. The Construction Monitor shall submit weekly
reports during the entire duration of the project and must be available upon four (4) hours notice
to inspect the site with the Planning Board staff.
C) A detailed construction schedule shall be submitted to the Planning Staff for the purpose of
tracking the construction and informing the public of anticipated activities on the site.
fifteen thousand dollars$15,000.00)
D) A bond in the amount of ( shall be posted for the purpose of
insuring that the site is constructed in accordance with the approved plan and that a final as-built
plan is provided, showing the location of all on-site structures. This bond shall be in the form of
a check made out to the Town of North Andover. This check will then be deposited into an
interest bearing bond account.
E) All stormwater management best practices shall be maintained as specified in the Stormwater
Operations and Maintenance Plan that was submitted with the application.
F) All applicable erosion control measures must be in place and reviewed and approved by the Planning
all existing and
Department. These measures must include erosion control to protect proposed
catch basins and oil traps on the site or on the streets adjacent to the project.
G) A pre-construction meeting must be held with the developer, their construction employees, Planning
Department and other applicable departments, to discuss scheduling of inspections to be conducted
on the project and the construction schedule.
3) DURING CONSTRUCTION
A) Dust mitigation must be performed weekly, or more frequently as directed by the Town Planner,
throughout the construction process.
B) Any stockpiling of materials (dirt, wood, construction material, etc.) must be shown on a plan and
reviewed and approved by the Planning Staff. Any approved piles must remain covered at all times
and fenced off to minimize any dust problems that may occur with adjacent properties.
C) It shall be the responsibility of the developer to assure that no erosion from the construction site shall
4
26 Main St.
Map 28, Parcel 14
Site Plan Special Permit - Multi-Family Dwelling Unit
occur which will cause deposition of soil or sediment upon adjacent properties or public ways,
except as normally ancillary to off-site construction. Off-site erosion will be a basis for the Planning
Board making a finding that the project is not in compliance with the plan; provided, however, that
the Planning Board shall give the developer written notice of any such finding and ten days to cure
said condition.
4) PRIOR TO A CERTIFICATE OF OCCUPANCY
A) The applicant must submit a letter from the architect and engineer of the project stating that the
building, landscaping, lighting and site layout substantially comply with the plans referenced at the
end of this decision as endorsed by the Planning Board. Alternatively, the applicant and/or property
owner may provide a bond, determined by the Planning Board, to cover the full amount of the
landscaping materials and installation if weather conditions do not permit the completion of the
landscaping prior to the use of the building.
B) All stormwater structures shall be cleaned, in accordance with the approved Stormwater
Operation & Maintenance Plan.
5) PRIOR TO THE FINAL RELEASE OF ALL SECURITY AND ESCROWED FUNDS
A) The Planning Staff shall review the site. Any screening as may be reasonably required by the
Planning Staff will be added at the Project Owner’s expense.
B) A final as-built plan showing final topography, the location of all on- site utilities, structures, curb
cuts, parking spaces and drainage facilities, including invert elevations of all stormwater
structures, must be submitted to the Planning Department. The as-built must be provided in paper
form as well as in SDF (Standard Digital File) format. The as-built shall also provide a
calculation showing the increase or decrease in impervious area.
C) A recorded copy of all recorded deeds and Homeowner’s Association documents must be filed with
the Planning Office.
D) The Planning Board must by a majority vote make a finding that the site is in conformance with the
approved plan.
6) GENERAL CONDITIONS
A) The contractor shall contact Dig Safe at least 72 hours prior to commencing any excavation.
B) Gas, Telephone, Cable and Electric utilities shall be installed underground as specified by the
respective utility companies.
C) The hours for construction shall be limited to between 7:00 a.m. and 5:00 p.m. Monday through
Friday and between 8:00 a.m. and 5:00 p.m. on Saturday.
D) No open burning shall be done except as is permitted during burning season under the Fire
Department regulations.
5
26 Main St.
Map 28, Parcel 14
Site Plan Special Permit - Multi-Family Dwelling Unit
E) If a dumpster is required once the building is occupied, the owner shall apply to the Board of
Health for the appropriate permit. The location of the dumpster must be approved by the
Planning Office.
F) The provisions of this conditional approval shall apply to and be binding upon the applicant, its
employees and all successors and assigns in interest or control.
G) Any action by a Town Board, Commission, or Department, which requires changes in the plan or
design of the building, as presented to the Planning Board, may be subject to modification by the
Planning Board.
H) Any revisions shall be submitted to the Town Planner for review. If these revisions are deemed
substantial, the developer must submit revised plans to the Planning Board for approval.
after June 19, 2014
I) This Special Permit approval shall be deemed to have lapsed (two years from
the date permit granted), exclusive of the time required to pursue or await determination of any
appeals, unless substantial use or construction has commenced within said two-year period or for
good cause. For purposes of this development, the developer shall be deemed to have undertaken
substantial use or construction if the developer has begun any site grading or tree clearing.
J) The following information shall be deemed part of the decision:
Plan titled
: Site Plan “Pondview” 26 Main Street, North Andover, Ma 01845
Prepared for
: Jeffco, Inc.
PO Box 802
Andover Ma 01810
Prepared by
: Andover Consultants, Inc.
1 East River Place
Methuen, MA 01844.
Scale
: 1” = 20’
Date
: Dated January 19, 2012, last revised on May 10, 2012, sheets 2 through 4 and
Sheet 1 last revised on June 7, 2012
Sheets
: 1 through 4
Conceptual
Landscape Plan
: Main Street North Andover, Massachusetts
Prepared by
: Huntress Associates, Inc.
17 Tewksbury Street
Andover, MA 01810
Date
: June 3, 2012
Sheets
: 1
Stormwater Report
: “Pondview” 26 Main Street
Prepared By
: Andover Consutants, Inc.
1 East River Place
Methuen, Ma 01844
Dated
: January 19, 2012, last revised May 10, 2012
6
26 Main St.
Map 28, Parcel 14
Site Plan Special Permit - Multi-Family Dwelling Unit
Operations and Maintenance Plan
26 Main Street
North Andover, Ma 01845 Revised May 10, 2012
Traffic Report:
26 Main Street
Ref
: 824
Prepared by
: Dermott J. Kelly Associates Inc., PE, PTOE
Dated
: February 6, 2012
Deed:
Quit Claim Deed, recorded at the Northern Essex registry of Deeds, Book 9738,
Sutton Redevelopment, LLCBeak Away Realty
Page 94, Grantor - , Grantee -
Trust
Date:
August 30, 2005
Proposed Architectural Plans
:
Prepared by
: Paul Davies & Associates, Architects, Inc.
Date
: January 6, 2012
Sheets
: A1-A5, S-1-S-2
cc: Town Departments
Applicant
Engineer
Abutters
Assessor
7