Loading...
HomeMy WebLinkAbout2013-05-07 Planning Board Supplemental Materials (59) Enright, Jean From: Phil Christiansen, PE <phil @csi-engr.com> Sent: Thursday, May 02, 2013 11:00 AM To: 'Lisa Eggleston' Cc: Tymon, Judy Attachments: siteplanrev.pdf, detailrev.pdf Categories: Red Category Lisa I thought it best to have all of my responses in one e-mail. I have also attached pdfs of changes in the plans Comments 1. No response needed 2. Soils testing has been moved to Monday May 6, 2013 3. 1 have removed porous pavement and added a stone treatment area along the drive. I have included water stops so the water will not rush down hill 4. 1 understand your concerns about limiting work as much as possible but the applicant has already reduced the impact from 37,000 s.f. to 21,000 s.f. That is a reduction of 43%. Also following the regulations the applicant should be allowed to build as allowed in the underlying zoning district. Section 4.136 3cii Uses allowed by Special Permit (3) Construction of a new or permanent structure only after a variance has been granted by the Zoning Board of Appeals. The permit has been granted for the house shown on the plan. Section 4.136 3c (i)Allowed Uses All of the Allowed Uses listed in Section 3 (a)(i) of this Watershed Protection District Bylaw are allowed in the Non-Disturbance Zone except as noted. Section 4.136 3 a i Allowed Uses (1)All permitted uses allowed in Section 4.121 "Permitted Uses Residence 1.2 and 3 District"of the Zoning Bylaw Section 4.121 Residence 1 District Nothing in the allowed activities in the section limits house size or clearing. The table of Dimensional Requirements at the end of the Zoning book does not include any limitations concerning house size or extent of clearing. Following the above review of the rules it seems to me our application and proposed site plans meets all of the zoning requirements specified. 5. A label for the limit of work has been added to the plan. I have reduced the area of clearing. I have narrowed the width of the entrance. I have added a note about six inches of top soil and native vegetation 6. 1 have added a note to restrict the use of copper 7. 1 have added notes regarding maintenance of stormwater systems 8. A construction schedule has been added 9. The size of the stone has been changed Regards, Phil Christiansen, P.E. CHRISTIANSEN & SERGI, INC. PROFESSIONAL ENGINEERS AND LAND SURVEYORS 160 Summer Street Haverhill, MA 01830 (978) 373-0310 1 (978) 372-3Q6Ofax plwmeonmmmwmm,smohumdtsawon*miryma,a�dmmncw has adennmwama�mos�*mmnmm and mummunmipmlmncwm and officials mw public wooin:Jm 1::::::o,mow mmnna�mnplwmeowrc,m: plcaswoonsiaw,mw*nwmnmwm before pnrmnomlm*mall z