HomeMy WebLinkAboutApplication - 59 BONNY LANE 10/1/1999 I F
•
Town of North Andover Planning Board
u i z ;u 0% zuzmz 3, V._.
1222 t .,ttc Yet' t .2u;:c2.,u.........,.. ,J.«,c,,.2:;:.Z^'. Y2 k .5
<N,z,<m,:zmmwz a > ,
Please type or print clearly.
1. Petitioner. GavAn Taylor
Address: 59 Bonny Lane - North Andover, MA 01845
Telephone number: (9 78) 975-5660
2. Owners of the Land: Gavin Taylor
Address: 59 Bonny Lane - North Andover, MA 01845
Telephone number: (97R) 975-S660
Number of years of ownership:
If applicant is not the owner, please state interest in property:
3. Request for a Special Permit under Section 4. 136 of the North Andover Zoning
Bylaw to Construct a garage addition in the non-disturbance,
no discharge and general zones; existing topography to be
maintained, the garage addition will result in no increase
in impervious area (38 square feet reduction) .
4. Location of Property: Bonny Lane
Zoning District: R-1
Assessors: Map: 62 Lot #: 57
Registry of Deeds: Book#:: 4055 Page#:: 1
5. Existing Lot:
Lot Area(Sq.Ft.): 65,212 sq. f t Building Height: 29 .5
Street Frontage: 150.001, Side Setbacks: 18.4
Front Setback: 110 ' Rear Setback: 175
Floor Area Ratio: .04: 1 Lot Coverage: 3.8%
6. Proposed Lot (if applicable):
Lot Area(Sq.Ft.): Building Height:
Street Frontage: Side Setbacks:
Front Setback: Rear Setback:
Floor Area Ratio: Lot Coverage:
+/
-- 7. Required Lot(as required by Zoning Bylaw): -
Lot.Area(Sq.Ft.): 87, 120 s q. ft.Building Height: 35
Street Frontage: 175 ' Side Setbacks: 30 '
Front Setback: 30 ' Rear Setback: 30
Floor Area Ratio: N/A Lot Coverage: N/A
8. Existing Building (if applicable):
Ground Floor.(Sq. Ft.): 1820 #of Floors: 1
Total Sq. Ft.: 1820 Height: 29 ,55
Use: Residential Type of Construction: Wood Frame
9. Proposed Building:
Ground Floor(Sq. Ft.): 2 432 #of Floors: 1
Total Sq. Ft.: 2432 Height: 29 .5
Use: Garage Type of Construction: Wood Frame
10. Has there been a previous application for a Special Permit from the Planning Board on
these premises? unknown . If so, when and for what type of construction ?
11. Petitioner and Landowner signature(s): -
Every application for a Special Permit shall be made on this form which is the official form
of the Planning Board. Every application shall be filed with the Town Clerk's Office. It
shall be the responsibility of the petitioner to furnish all supporting documentation with
this application. The dated copy of this application received by the Town Clerk or
Planning Office does not absolve the applicant from this responsibility. The petitioner
shall be responsible for all expenses for filing and legal notification. Failure to comply
with application requirements, as cited herein and in the Planning Board Rules and
regulations may result in a dismissal by the Planning Board of this application as
incomplete.
Petitioner's Signature: !J L,
Print or type name here: Gav,n Taylor
Owner's Signature: 7`-- /I•
Gavin Taylor
Print or type name here:
AL 411.t. MERRIMACK ENGINEERING SERVICES, INC.
"1� �` PROFESSIONAL ENGINEERS • LAND SURVEYORS • PLANNERS
All fie , 66 PARK STREET•ANDOVER,MASSACHUSETTS 01810•TEL(978)475-3555,373-5721 •FAX(978)475-1448•E-MAIL:merreng @aol.com
October 4, 1999
Town of North Andover
Planning Board
27 Charles Street
North Andover, MA 01845
RE: #59 Bonny Lane
North Andover, MA
Members of the Board:
Regarding the application of Gavin Taylor for construction of a garage addition to his house at
#59 Bonny Lane, please note the following:
1. Implementation of this plan will result in a decrease of 38 square feet impervious
area, since the area in which the garage is to be built is currently paved. As such,
there should be no significant degradation of the quality or quantity of water in or
entering in Lake Cochichewick through implementation of this plan.
2. Given the location of the existing house on the lot, no reasonable alternative for the
structure exists, except to locate the addition within the non-disturbance zone.
3. Given the current impervious and proposed impervious conditions, no special
provisions for recharge of surface waters have been provided nor do we feel they
are, at this time, warranted. However, during construction, erosion control will be
provided.
Given the above, please do not hesitate to contact me should you have questions or comments.
Very truly yours,
MERRIMACK ENGINEERING SERVICES
Daniel Koravos, P.E.
Project Engineer
cd