HomeMy WebLinkAbout20170905 Monitoring Reports - Stormwater Report - 500 GREAT POND ROAD 10/10/2017 North Andover Planning Board
INDEPENDENT CONSTRUCTION/STORMWATER MONITOR
Letter of Agreement
Project Address Date
500 Great Pond Road 10/04/2017 —1
Independent Monitor Name Monitoring Type(s)
John M. Morin (The Morin-Cameron Grp,lnc) ® Construction
❑ Stormwater
Monitor Contact Phone Monitor E-mail
9 7 8'• 1?7- $5 8 ohnamorincameron.com
This Letter of Agreement is between the the above named Independent Monitor and the North Andover Planning
Board for monitoring services to be provided at the above mentioned Project Address and in accordance with
the conditions and restrictions stated by the Planning Board in Ws Decision dated 1151 `? a
copy of that Decision has been provided to the Independent Monitor. (initials of Independent
Monitor) By initialing, the Independent Monitor acknowledges receipt o e Decision and an understanding of
the conditions/restrictions set by the North Andover Planning Board.
The Independent Monitor also acknowledges and agrees that he/she is providing monitoring services for the
benefit of the Town of North Andover and is not the project owner or applicant, and does not have a financial or
personal interest in the project. Further,the Independent Monitor understands that she/he may not act as the
project owner's agent, representative, partner,employee or joint-venturer on this project.
The Independent Monitor agrees to immediately report to the North Andover Planning Board,via the Town
Planner, any violations of the terms of the Decision listed above,as soon as observed or otherwise become
known to the Independent Monitor.This report is in addition to regularly scheduled monitoring reports.
The Independent Monitor understands that the failure to perform under this Letter of Agreement,to the
reasonable satisfaction of the North Andover Planning Board,will be grounds for said Independent Monitor to be
excluded in this role for any future projects which are within the jurisdiction of the North Andover Planning Board.
Independent Monitor[Signature] Date
I-Vt 1 1 +014-11-7�
By signing this Letter of Agreement, I indicate that I have read and understand the terms included herein.
To n P anner[Sig ur Date
r. I — _
o jl
The.
Morin-Cameron
Engineers•Surveyors
Environmental Consultants•Land Use Planners
66 Elm Street
Danvers,MA 01923
www.morincameron.com
978-777-8686
FAX 978-77"488
Erosion Control Site Inspection Report
General Information
Project Name: North Andover Country Club-Clubhouse Patio and Fire Pit(500 Great Pond Road)
Watershed District Special September 5,2017 Location: North Andover,MA
Permit Issuance Date:
Date of Inspection: October 10,2017 Start/End Time: 10:30 AM-10:40 AM
Inspector's Name(s): Will Schkuta
Inspector's Title(s): Environmental Inspector
The Morin-Cameron Group,Inc.
Inspector's Contact 66 Elm Street
Information Danvers, MA 01923
978-777-8586
Describe present phase Patio/Fire Pit construction
of construction
Type of Inspection:
® Regular ❑Pre-storm event ❑ During storm event ❑ Post-storm event
Weather Information
Has it rained since the last inspection?
❑Yes ❑No
N/A(First Inspection)
Weather at time of this inspection? 73%Clear
Do you suspect that discharges may have occurred since the last inspection?
❑Yes ❑No
N/A
Are there any discharges at the time of inspection?
❑Yes ® No
Site-s ecific BMPs
BMP Installed Date for corrective
BMP Description and Operating Corrective Action Needed action/responsible
Properly? person
Hay waddle 131 Yes 0 No N/A N/A
Overall Site Issues
Corrective Action Date for corrective
BMP/Activity Implemented? Maintained? Needed action/responsible
person
Are all slopes and disturbed
areas not actively being ®Yes❑ No ®Yes❑ No N/A N/A
worked properly stabilized?
Are natural resource areas
(e.g.,streams,wetlands,
mature trees,etc.)protected ®Yes❑ No ®Yes❑ No N/A N/A
with barriers or similar
BMPs?
Are perimeter controls and
sediment barriers
adequately installed(keyed ®Yes❑ No ®Yes❑ No N/A N/A
into substrate)and
maintained?
Is there evidence of
sediment being tracked into ❑Yes® No ®Yes❑ No N/A N/A
the street?
Is trash/litter from work
areas collected and placed ®Yes❑ No ®Yes❑ No N/A N/A
in covered dumpsters?
Are vehicle and equipment
fueling,cleaning,and
maintenance areas free of ®Yes❑ No ®Yes❑ No N/A N/A
spills,leaks,or any other
deleterious material?
Additional Comments
Certification statement:
The undersigned has inspected the site and has informed the site contractor of responsibilities for repairing and maintaining
the erosion control system.
Print name: ,"; �-
Signature
Date:October 10,2017
�"` '` d' �p i � �' � b ��(�" � �t, ��",,
q,� 4fku.�.[p, �y� L i �S`�` 4� � L x
y � � � ��
"^� s^!�i.�� W� / � �
� � �� 9�'�` `� � .'
�t�c� `wfi '� '
k�a 1`� � '
t
e' ar t } Mr, s
6�. � .�! � ,�" t
�n.j ° � �?
tg�
�� �� fr�'.
�.i 1
�� .i �! 5
� � �
�� �, ��
r
i�t�y� f �3 � s� vi �"
a � �� p
M���� � h�� ���
�����
�,' e r
S€Qxt� rtixt �z'� i`tt �Q�is i x i �� r � � � ���, ���
`���������t �t��'`i��:,F,�,:?,��'�tYi���h� I I, II is
'�� �i �i t��; �
� a� ��
��� � s���s��t
,'t g��{�' ���`'�i'
f a �ta` �.�� .
� k � } r '�
.'<
��
}��s���
t
��
�;
i ���1`�f;tk� h
SI
}�����jr��t.-
�f���zt r`�, ��
�,.<
'� o }�
t..c.. �!
s
y.
RS
;1
:h
RY
Mz
ySg t� `Fa 3.
Y M
gk fiSs ^�
The
Engineers•Surveyors
Environmental Consultants•Land Use Planners
66 Elm Street
Danvers,MA 01923
www.morincameron.com
978-777-8586
FAX 978-774-3488
Erosion Control Site Inspection Report
General Information
Project Name: North Andover Country Club—Clubhouse Patio and Fire Pit(500 Great Pond Road)
Watershed District Special September 5,2017 Location: North Andover,MA
Permit Issuance Date:
Date of Inspection: October 16,2017 Start/End Time: 9:00 AM—9:10 AM
Inspector's Name(s): Will Schkuta
Inspector's Title(s): Environmental Inspector
The Morin-Cameron Group, Inc.
Inspector's Contact 66 Elm Street
Information Danvers, MA 01923
978-777-8586
Describe present phase
of construction Patio/Fire Pit construction
Type of Inspection:
R Regular ❑Pre-storm event ❑ During storm event ❑ Post-storm event
Weather Information
Has it rained since the last inspection?
❑Yes R No
Precipitation Amount Measured at Lawrence Airport between October 10—October 15 =0.0 inches
Weather at time of this inspection? 60°,Mostly Cloudy
Do you suspect that discharges may have occurred since the last inspection?
❑Yes R No
Are there any discharges at the time of inspection?
❑Yes R No
Site-s ecific BMPs
BMP Installed Date for corrective
BMP Description and Operating Corrective Action Needed action/responsible
Property? person
Hay waddle R Yes❑ No install remaining portion of hay 10-16-17,1eff Isbell
waddle
Overall Site Issues
Corrective Action Date for corrective
BMP/Activity Implemented? Maintained? Needed action/responsible
person
Are all slopes and disturbed
areas not actively being M Yes❑ No M Yes❑ No N/A N/A
worked properly stabilized?
Are natural resource areas
(e.g.,streams,wetlands,
mature trees,etc.)protected M Yes❑ No M Yes❑ No N/A N/A
with barriers or similar
BMPs?
Are perimeter controls and
sediment barriers
adequately installed(keyed M Yes❑ No M Yes❑ No N/A N/A
into substrate)and
maintained?
Is there evidence of
sediment being tracked into ❑Yes M No M Yes❑ No N/A N/A
the street?
Is trash/litter from work
areas collected and placed M Yes❑ No M Yes❑ No N/A N/A
in covered dumpsters?
Are vehicle and equipment
fueling,cleaning,and
maintenance areas free of M Yes❑ No M Yes❑ No N/A N/A
spills,leaks,or any other
deleterious material?
Additional Comments
• The remaining portion of hay waddle(pool side)wilt be installed now that the chain-link fence has been removed.
Certification statement:
The undersigned has inspected the site and has informed the site contractor of responsibilities for repairing and maintaining
the erosion control system.
Print name.�' � ' '
Signature. 11t�`ot
Date:October 16,2017
(t5
{t 1
r t"t1`tt4,4 r �
S CL�:
k
i
�t ids G� (t YY i S t F
E
etet
d(
l �s
,• �� Sa trS S� � t '.
s
1J1 �
i
i
,
w
a
1 �
hN I'l A7 I I,
1�
t�
i 4
l �
O
tt� N
r 2 € )(
r
y
va'
zr 3
t
V
The.
Morin-Cameron
Engineers.Surveyors
Environmental Consultants a Land Use Planners
66 Elm Street
Danvers,MA 01923
www.morincameron.com
978-777-8686
FAX 978-7743488
Erosion Control Site Inspection Report
General Information
Project Name: North Andover Country Club—Clubhouse Patio and Fire Pit(500 Great Pond Road)
Watershed District Special September 5,2017 Location: North Andover, MA
Permit Issuance Date:
Date of Inspection: October 26,2017 Start/End Time: 9:30 AM—9:45 AM
Inspector's Name(s): Will Schkuta
Inspector's Title(s): Environmental Inspector
The Morin-Cameron Group, Inc.
Inspector's Contact 66 Elm Street
Information Danvers,MA 01923
978-777-8586
Describe present phase Patio/Fire Pit construction,Wall construction
of construction
Type of Inspection:
® Regular ❑Pre-storm event ® During storm event ❑ Post-storm event
Weather Information
Has it rained since the last inspection?
®Yes ❑ No
Precipitation Amount Measured at Lawrence Airport between October 16—October 26 = 1.42 inches
Weather at time of this inspection? 62%Light Rain
Do you suspect that discharges may have occurred since the last inspection?
❑Yes ® No
Are there any discharges at the time of inspection?
❑Yes ® No
Site-s ectfic BMPs
BMP Instalted Date for corrective
BMP Description and Operating Corrective Action Needed action/responsible
Properly? person
Hay waddle 0 Yes 0 No N/A NIA
Overall Site Issues
Corrective Action Date for corrective
BMP/Activity Implemented? Maintained? Needed action/responsible
person
Are all slopes and disturbed
areas not actively being ®Yes❑ No M Yes❑ No N/A N/A
worked property stabilized?
Are natural resource areas
(e.g.,streams,wetlands,
mature trees,etc.)protected ®Yes❑ No ®Yes❑ No N/A N/A
with barriers or similar
BMPs?
Are perimeter controls and
sediment barriers
adequately installed(keyed ®Yes❑ No ®Yes❑ No N/A N/A
into substrate)and
maintained?
Is there evidence of
sediment being tracked into ❑Yes® No ®Yes❑ No N/A N/A
the street?
Is trash/titter from work
areas collected and placed ®Yes❑ No ®Yes❑ No N/A N/A
in covered dumpsters?
Are vehicle and equipment
fueling,cleaning,and
maintenance areas free of M Yes❑ No ®Yes❑ No N/A N/A
spills,leaks,or any other
deleterious material?
Additional Comments
• The remaining portion of hay waddle(pool side)was installed.
Certification statement:
The undersigned has inspected the site and has informed the site contractor of responsibilities for repairing and maintaining
the erosion control system.
Print name: a
,r
Signature
Date:October 26,2017
s.
yy �
till
logonomilif
RIM T'
fill Jfii
� , 111 1lIJ
4
b
:r
h
r
y.
The,
Morin-Cameron
Engineers•Surveyors
Environmental Consultants•Land Use Planners
66 Elm Street
Danvers,MA 01923
www.morincameron.com
978-777-8586
FAX 978-774-3488
Erosion Control Site Inspection Report
General Information
Project Name: North Andover Country Club—Clubhouse Patio and Fire Pit(500 Great Pond Road)
Watershed District Special September 5,2017 Location: North Andover, MA
Permit Issuance Date:
Date of Inspection: October 30,2017 Start/End Time: 2:35 PM—2:45 PM
Inspector's Name(s): Will Schkuta
Inspector's Title(s): Environmental Inspector
The Morin-Cameron Group,Inc.
Inspector's Contact 66 Elm Street
Information Danvers,MA 01923
978-777-8586
Describe present phase Patio/Fire Pit construction,Wall construction
of construction
Type of Inspection:
® Regular ❑Pre-storm event ❑ During storm event ® Post-storm event
Weather Information
Has it rained since the last inspection?
®Yes ❑ No
Precipitation Amount Measured at Lawrence Airport between October 26—October 30= 1.78 inches
Weather at time of this inspection? 57%Partly Cloudy
Do you suspect that discharges may have occurred since the last inspection?
❑Yes ® No
Are there any discharges at the time of inspection?
❑Yes 0 No
Site-s ecific BMPs
BMP Installed Date for corrective
BMP Description and Operating Corrective Action Needed action/responsible
Properly? person
Hay waddle 0 Yes 0 No N/A N/A
Overall Site Issues
Corrective Action Date for corrective
BMP/Activity Implemented? Maintained? Needed action/responsible
person
Are all slopes and disturbed
areas not actively being ®Yes❑ No ®Yes❑ No N/A N/A
worked properly stabilized?
Are natural resource areas
(e.g.,streams,wetlands,
mature trees,etc.)protected ®Yes❑ No ®Yes❑ No N/A N/A
with barriers or similar
BMPs?
Are perimeter controls and
sediment barriers
adequately installed(keyed ®Yes❑ No ®Yes❑ No N/A N/A
into substrate)and
maintained?
Is there evidence of
sediment being tracked into ❑Yes ® No ®Yes❑ No N/A N/A
the street?
Is trash/litter from work
areas collected and placed ®Yes❑ No ®Yes❑ No N/A N/A
in covered dumpsters?
Are vehicle and equipment
fueling,cleaning,and
maintenance areas free of ®Yes❑ No ®Yes❑ No N/A N/A
spills, leaks,or any other
deleterious material?
Additional Comments
Certification statement:
The undersigned has inspected the site and has informed the site contractor of responsibilities for repairing and maintaining
the erosion control system.
Print name
4
Signature '
,
Date:October 30,2017
�` � `< t�,� k ' �,
� � '�'��
4��i �k t'� � �x;,�
('�� '.'�,�� � a, t �Via, ��., �;
a�,,� � k` � � .4 t`,�� i�Ya e 's
�� r. ,� �$�w� r
�, �� �
.� ��,� � �
���' � r,i r r� 'w� I'4�1 ����
� ��,�,a �
�4�{b
K.
���.
r
..
�`�r�ti�,�°f�.
��, ,;
�,k.
">
�,
..,�
f�i
t �� �� m
t=
i
� �tI
6{t� � „
�}�al. � .i�. tg
0.N � t f t� bt'� k
� �4 6 �:
�'` ��r'F ,�,
i�' Y "�+
i �� '
���
( t i t�f �4�
�^�, � ,kS 1�'r yP ��
t�t St �t k � � _
� �n r tit ��
57
�������� �t$ �1yt�t� �
p S� � r�4� E ��t��
��ii S•
�;hN
�� at ..
J 1 A R f
� W t
`� a '�=.- ��c �1a�-�..•,a, #c t„ r. �'" f s��x`'h�� �9? ',.� � :t' `�" ....F�\ >:� t �..#v". i.�`,)) n 1 x-�,l.X fi�
..am �� <�,':4 A§t At'S^. 1 5 ¢ ti R �>�''� , ..h Y��` '�` � d�✓�"'� �,i� \�ik"��p°� v?-�F �h�-�;��� S" ^���r 0
,
r
e;wma�
3! 4'= .y:�,�.r n�:y�>!m•G4}l��" .e �',...,:,, �5 �� �� ,�aC '�r �, '�',,� l ° ,� {\r� t, a , 'Y.�#t4F �f,4ir.. '� ,�
p � 4 e',°�' r ,�,,,•'+-'�� r1�}s *s t ''C;�Y`,.i,, ,u�`,�` ��^;• � � l� � �r.� �#� �,,�„.�;+��,"�" rb7�,-`p X � r
f`w9 +«�',"� tiii t „� "`„'y` P ,3. ,�Y t `C? {�? '� #• 14,
�a." "`'�r1✓' {
IV
Yt trt
E ��
14
IF,
,,a,�-
�4$! C
,h. <• .';, t <S= k� .k @U p x F ci I
�
a=.:,6��r�r
vj�t� t 4 E(
`Y vi
Fi4'f r 2 µ�3' ��� "tk�'�;6�`�,��.t s yr a L ' y-�„ t ��_. � � �`,� � �� to t4�k Wed t���e :.�# �`*--✓ � M� �t a
t ..hick ! ! � x3 "-:�t °F J�� ^ %k FhT k
y d
tY i t C Z:�
t
R,
All
1 t
N�h
,
i fie.
Morin-Cameron
Engineers a Surveyors
Environmental Consultants a Land Use Planners
66 Elm Street
Danvers,MA 01923
www.morincameron.com
978-777.8586
FAX 978-774-3488
Erosion Control Site Inspection Report
Gene al Information
Project Name: North Andover ountry Club-Clubhouse Patio and Fire Pit(500 Great Pond Road)
Watershed District special SVp em,er 5,2017 Location: North Andover, MA
Permit Issuance Date:
Date of Inspection: November 6,2017 Start/End Time: 8:25 AM-8:35 AM
Inspector's Name(s): Will Schkuta
Inspector's Title(s): Environmental Inspector
The Morin-Cameron Group,Inc.
Inspector's Contact 66 Elm Street
Information Danvers,MA 01923
978-777-8586
Describe present phase Patio/Fire Pit construction
of construction
Type of Inspection:
® Regular ❑Pre-storm event ❑ During storm event ❑ Post-storm event
Weather Information
Has it rained since the Last inspection?
❑Yes ® No
Precipitation Amount Measured at Lawrence Airport between October 31 -November 5 =0.0 inches
Weather at time of this inspection? 67%Overcast
Do you suspect that discharges may have occurred since the last inspection?
❑Yes ® No
Are there any discharges at the time of inspection?
❑Yes ® No
Site-specific BMPs
BMP Installed Date for corrective
BMP Description and Operating Corrective Action Needed action/responsible
Property? person
Hay waddle 0 Yes 0 No N/A N/A
Overall Site Issues
Corrective Action Date for corrective
BMP/Activity Implemented? Maintained? Needed action/responsible
person
Are all slopes and disturbed
areas not actively being N Yes❑ No N Yes❑ No N/A N/A
worked properly stabilized?
Are natural resource areas
(e.g.,streams,wetlands,
mature trees,etc.)protected N Yes❑ No N Yes❑ No N/A N/A
with barriers or similar
BMPs?
Are perimeter controls and
sediment barriers
adequately installed (keyed N Yes❑ No N Yes❑ No N/A N/A
into substrate)and
maintained?
Is there evidence of
sediment being tracked into ❑Yes N No N Yes❑ No N/A N/A
the street?
Is trash/litter from work
areas collected and placed N Yes❑ No N Yes❑ No N/A N/A
in covered dumpsters?
Are vehicle and equipment
fueling,cleaning,and
maintenance areas free of N Yes❑ No N Yes❑ No N/A N/A
spills, leaks,or any other
deleterious material?
Additional Comments
Certification statement:
The undersigned has inspected the site and has informed the site contractor of responsibilities for repairing and maintaining
the erosion control system.
Print name:kt °,:-L- r�
Signature
r
Date:November 6,2017
. x
r�
t
w
t
nx
�aizr
F
WAIVA
a
f�
e
D9
t
� 0
s t" mj
MONO III
I
1 t{{ 3 (g
d S "A
k r
& is '° ' r �•�� �� �l ° ac v�
yy��S i� t �' r•3 'O.1
l i y F # yA t�V lP s t r
n
.�'��. Eat �• ���^`� a - i '� ,""Ns, S �e ;l�� s � 7 A �
RMI
(
� f-y� pl .✓°6t� „!+7 u,'.��46, sy fig? s '�a k �> ys a � t� �y �# s��r��t 4�',�
tj
��� w♦` � � it r 4�a��a b� os � e vv�r.�k4 ! � J
�Pill
it
x
�d1F: 415
a 4
Sa
Hi�1F T
i `
�" !! i � tr
r
l!' M r !. H j , I +,
}!,! � .. } r.�:•:. .r��� '•�!{�F it���
+,l,,�J ,��a �`;x!
I f 4
�t.s`,rt is(r!� ,,�'��l
`f(
.`,�d l.,<.i- 1 ll`li ! �y;c°. �i rj j�.1 I��i � ..ip � �7 ."a "�l�x..�i•`,�,� ', r,"�. ,t?. �, ia3 ,4 .Y�:;l�� ��'' LW
Vag
.to l,J'r fps �.�_�{ !1•���� � I i il�,.I���! i rg�'4, 4 a. '�.. a c.r �^�. .Y"A. a.
,, �"��,`:1 l "•���� � 1��4 ��!s;'r��.(',i i ! ���t 1 ` v.'� i,�i�• ? �� a `t'!s." a 4.�t� � �'�w� t�t k ,�;r .,
rMEN IMMEMOMMEN 0,
The
Morin-Cameron
Engineers a Surveyors
Environmental Consultants•Land Use Planners
66 Elm Street
Danvers,MA 01923
www.morincameron.com
978-777-8586
FAX 978-774-3488
Erosion Control Site Inspection Report
eneratln ormation
Project Name: North Andover Country Club—Clubhouse-Patio and Fire Pit(500 Great Pond Road)
Watershed District Spec' l er 5,2017 Location: North Andover, MA
Permit Issuance Date:
Date of Inspection: November 13,2017 Start/End Time: 8:45 AM—8:55 AM
Inspector's Name(s): Will Schkuta
Inspector's Title(s): Environmental Inspector
The Morin-Cameron Group,Inc.
Inspector's Contact 66 Elm Street
Information Danvers,MA 01923
978-777-8586
Describe present phase patio/Fire Pit construction
of construction
Type of Inspection:
® Regular ❑Pre-storm event ❑ During storm event ❑ Post-storm event
Weather Information
Has it rained since the last inspection?
®Yes ❑ No
Precipitation Amount Measured at Lawrence Airport between November 6—November 12=0.06 inches
Weather at time of this inspection? 37%Overcast
Do you suspect that discharges may have occurred since the Last inspection?
❑Yes ® No
Are there any discharges at the time of inspection?
❑Yes ® No
Site-specific BMPs
BMP Installed Date for corrective
BMP Description and Operating Corrective Action Needed action/responsible
Properly? person
Hay waddle 9 Yes 0 No N/A N/A
Overall Site Issues
Corrective Action date for corrective
BMP/Activity Implemented? Maintained? Needed action/responsible
person
Are all slopes and disturbed
areas not actively being ®Yes❑ No ®Yes❑ No N/A N/A
worked property stabilized?
Are natural resource areas
(e.g.,streams,wetlands,
mature trees,etc.)protected ®Yes❑ No ®Yes❑ No N/A N/A
with barriers or similar
B NI Ps?
Are perimeter controls and
sediment barriers
adequately installed(keyed ®Yes❑ No ®Yes❑ No N/A N/A
into substrate)and
maintained?
Is there evidence of
sediment being tracked into ❑Yes® No ®Yes❑ No N/A N/A
the street?
Is trash/titter from work
areas collected and placed ®Yes❑ No ®Yes❑ No N/A N/A
in covered dumpsters?
Are vehicle and equipment
fueling,cleaning,and
maintenance areas free of ®Yes❑ No ®Yes❑ No N/A N/A
spills,leaks,or any other
deleterious material?
Additional Comments
Certification statement
The undersigned has inspected the site and has informed the site contractor of responsibilities for repairing and maintaining
the erosion control system.
Print name:
Signature
Date:November 13,2017 ,%r
Vk '
F rf �ts��t��tit�s fyl �
`d
1 ;� aatl�lLLlf''+�Il
f{i� i�� �Yiillull� y
n167f!
{N
r
s; S
t sY it
j
t
-4
1A
X
..........
'T
KV-1
wit 1;.1-
,11,vj
,,gg"'.
O-Z
g g
A W,
9.0
IN
J4,
V/
The.
Morin-Cameron
Engineers•Surveyors
Environmental Consultants•Land Use Planners
66 Elm Street
Danvers,MA 01923
www.morincameron.com
978-777-8586
FAX 976-774-3488
Erosion Control Site Inspection Report
General Information
Project Name: North Andover Country Club—Clubhouse Patio and fire Pit(500 Great Pond Road)
Watershed District Special September 5,2017 Location: North Andover, MA
Permit Issuance Date:
Date of Inspection: November 20,2017 Start/End Time: 10:45 AM—10:55 AM
Inspector's Name(s): Will Schkuta
Inspector's Title(s): Environmental Inspector
The Morin-Cameron Group, Inc.
Inspector's Contact 66 Elm Street
Information Danvers, MA 01923
978-777-8586
Describe present phase
of construction Patio/Fire Pit construction
Type of Inspection:
0 Regular ❑Pre-storm event ❑ During storm event ❑ Post-storm event
Weather Information
Has it rained since the last inspection?
®Yes ❑ No
Precipitation Amount Measured at Lawrence Airport between November 13—November 19=0.78 inches
Weather at time of this inspection? 41°,Clear
Do you suspect that discharges may have occurred since the last inspection?
❑Yes I@ No
Are there any discharges at the time of inspection?
❑Yes ® No
Site-s ecific BMPs
BMP installed Date for corrective
BMP Description and Operating Corrective Action Needed action/responsible
Properly? person
Hay waddle 0 Yes 0 No N/A N/A
Overatt Site Issues
Corrective Action Date for corrective
SMP/Activity Imptemented? Maintained? Needed action/responsible
person
Are all slopes and disturbed
areas not actively being 0 Yes❑ No ®Yes 0 No N/A N/A
worked properly stabilized?
Are natural resource areas
(e.g.,streams,wetlands,
mature trees,etc.)protected ®Yes 0 No 0 Yes 0 No N/A N/A
with barriers or similar
BMPs?
Are perimeter controls and
sediment barriers
adequately installed(keyed ®Yes❑ No ®Yes❑ No N/A N/A
into substrate)and
maintained?
Is there evidence of
sediment being tracked into ❑Yes M No 0 Yes 0 No NIA N/A
the street?
Is trash/litter from work
areas collected and placed 0 Yes 0 No 0 Yes 0 No N/A N/A
in covered dumpsters?
Are vehicle and equipment
fueling,cleaning,and
maintenance areas free of ®Yes❑ No 0 Yes 0 No N/A N/A
spills,leaks,or any other
deleterious material?
Additional Comments
Certification statement:
The undersigned has inspected the site and has informed the site contractor of responsibilities for repairing and maintaining
the erosion control system.
Print name ?g �z
Signature
Date: November 20,2017
I%� .R3`� } 1+( d+ +y� s
" ' m � �^rn,�.°.. t��, t py,��3��k `t y !➢�.":t�l i' 1 j� f I f) '( "n �;�. a;`- ,t �, s {� �' ft� � s r',;r.:�.
NO
,�. � y ..,,..,t.r�+ t2 �� ��stg� �� '�a.:.".i yf�'�.� V`�`��,,��ia� -... '•;w'e.. ,�� � � '� " �:t ��s�� � a "'.
2t�^ t��"� � N�x a�i��sh 1 �� � 2���?j a{'� +••ws, —m- �r,� � �' 'nb� � �r'q'a
r��a -r !'+a�ty�'t� � �2rt,�b t. i•�r +z+ac � 2' 4' +;4 � "'",a`'g a• '�c^���:{ f7 e�.
t�
9V * t
,,t§sfi fi t �:. Y{kzafittt t• ,,. � " n, r ���`, S"mMir
Rim
S
�nijimt l t'si'i i `Y s 'wrzih°.. ,�F� „1+� x�' '.�' ♦y,.�'e �` "y.:4r. �`t 1��i
rr ,
r
{
t -
r
d a
y `
}
n1w °
won
���.�
jc
s �
t
P i 4
1
4 ✓Sp ply �;e � �
F
a
y
k.
y'f V
The
Morin-Cameron
Engineers o Surveyors
Environmental Consultants o Land Use Planners
66 Elm Street
Danvers,MA 01923
www.morincameron.com
978-777-8586
FAX 978-774-3488
Erosion Control Site Inspection Deport
General Information
Project Name: North Andover Country Club—Clubhouse Patio and Fire Pit(500 Great Pond Road)
Watershed District Special September 5,2017 Location: North Andover, MA
Permit Issuance Date:
Date of Inspection: November 27,2017 Start/End Time: 10:45 AM—10:55 AM
Inspector's Name(s): Will Schkuta
Inspector's Titte(s): Environmental Inspector
The Morin-Cameron Group,Inc.
Inspector's Contact 66 Elm Street
Information Danvers,MA 01923
978-777-8586
Describe present phase Patio/Fire Pit construction
of construction
Type of Inspection:
® Regular O Pre-storm event ❑ During storm event ❑ Post-storm event
Weather information
Has it rained since the Last inspection?
®Yes ❑ No
Precipitation Amount Measured at Lawrence Airport between November 20—November 26 =0.70 inches
Weather at time of this inspection? 43`,Overcast
Do you suspect that discharges may have occurred since the last inspection?
❑Yes ® No
Are there any discharges at the time of inspection?
❑Yes ® No
Site-specific BMPs
BMP Installed Date for corrective
BMP Description and Operating Corrective Action Needed action/responsible
Properly? person
Hay waddle ®Yes 0 No N/A N/A
Overall Site Issues
Corrective Action pate for corrective
BMP/Activity Implemented? Maintained? Needed action/responsible
person
Are all slopes and disturbed
areas not actively being ®Yes❑ No M Yes❑ No N/A N/A
worked properly stabilized?
Are natural resource areas
(e.g.,streams,wetlands,
mature trees,etc.)protected ®Yes 0 No M Yes❑ No N/A N/A
with barriers or similar
BMPs?
Are perimeter controls and
sediment barriers
adequately installed(keyed ®Yes❑ No ®Yes ❑ No N/A N/A
Into substrate)and
maintained?
Is there evidence of
sediment being tracked into 0 Yes® No ®Yes❑ No N/A N/A
the street?
Is trash/litter from work
areas collected and placed M Yes❑ No ®Yes❑ No N/A N/A
in covered dumpsters?
Are vehicle and equipment
fueling,cleaning,and
maintenance areas free of ®Yes❑ No ®Yes 0 No N/A NIA
spills,leaks,or any other
deleterious material?
Additional Comments
Certification statement:
The undersigned has inspected the site and has informed the site contractor of responsibilities for repairing and maintaining
the erosion control system.
Print name:\--Z,lti-t- Sc NK �1"C
Signature:
Date:November 27,2017
R `
w? 9 7
t$I 3 \ \ $3 .ggy
s
t' -'61h.W .1Y� F .f a ��3
C p � ,,gy�pp �y
b'�t7A3�'s p`@-
�3...�iy,G �crvt-irk-�F��.^ tt4 ��e des
4
fe
a` T g �
s € fa � .
A
" --
� � v a
5
vivo
yn
AV
r
Room WK
42
oilAMLH
m
_ n
r t
¢40
INSp�nui ell
x MCA"
.r - a '' 1 ���
„ t r' ^"
�Y s;
-
AT
j
0 too
AN
ZYKA nil NOTE
A low.
ok
a
Tn 3 `aY j�q
NONE"
'.�.' ,m� sue' � ,�'�'�`�fi:. '; �� -�-• � � ,�' ,: '� -a:
r a�Ve
tt t 1� ajti« .12y }l '
� !�,g
9
F� MR � a
AWN
s
awe
i
! �",
Ff K z '
' s�`
�
'If S"
} Y�4$�, 3 � n h'w„�a.° A ` �N p ;:•�
wl a A f
mz
Y � u
3 i
i 4 '
s
. a _ A
The Morin-Cameron.
Engineers•Surveyors
Environmental Consultants•Land Use Planners
66 Elm Street
Danvers,MA 01923
www.morincameron.com
978-777-8586
FAX 978-774-3488
Erosion Control Site Inspection Report
Generat Information
Project Name: North Andover Country Club—Clubhouse Patio and Fire Pit(500 Great Pond Road)
Watershed District Special September 5,2017 Location: North Andover, MA
Permit Issuance Date:
Date of Inspection: December 11,2017 Start/End Time: 2:30 PM—2:35 PM
Inspector's Name(s): Daniel Powers
Inspector's Title(s): Environmental Inspector
The Morin-Cameron Group, Inc.
Inspector's Contact 66 Elm Street
Information Danvers, MA 01923
978-777-8586
Describe present phase
of construction Patio/Fire Pit construction
Type of Inspection:
® Regular ❑ Pre-storm event ❑ During storm event ❑ Post-storm event
Weather Information
Has it rained since the last inspection?
®Yes ❑ No
Precipitation Amount Measured at Lawrence Airport between December 5—December 11 = 0.82 inches
Weather at time of this inspection? 37°,Clear
Do you suspect that discharges may have occurred since the last inspection?
❑Yes ® No
Are there any discharges at the time of inspection?
❑Yes N No
Site-specific BMPs
BMP Installed Date for corrective
BMP Description and Operating Corrective Action Needed action/responsible
Properly? person
Hay waddte 0 Yes® No N/A(See comments) N/A
Overall Site Issues
Corrective Action Date for corrective
BMP/Activity Implemented? Maintained? Needed action/responsible
person
Are all slopes and disturbed
areas not actively being ®Yes ❑ No ®Yes❑ No N/A N/A
worked properly stabilized?
Are natural resource areas
(e.g.,streams,wetlands, N/A(See
mature trees,etc.)protected ❑Yes® No ®Yes ❑ No N/A
with barriers or similar comments)
BMPs?
Are perimeter controls and
sediment barriers
adequately installed (keyed ❑Yes ® No ®Yes❑ No N/A NIA
into substrate)and
maintained?
Is there evidence of
sediment being tracked into ❑Yes® No ®Yes❑ No N/A N/A
the street?
Is trash/litter from work
areas collected and placed ®Yes❑ No ®Yes❑ No N/A N/A
in covered dumpsters?
Are vehicle and equipment
fueling,cleaning,and
maintenance areas free of ®Yes❑ No ®Yes❑ No N/A N/A
spills,leaks,or any other
deleterious material?
Additional Comments
® All disturbed areas had been sodded and are now fully stabilized and the hay waddle has been removed (as of
12/4/2017 inspections).Area obscured by snow.
Certification statement:
The undersigned has inspected the site and has informed the site contractor of responsibilities for repairing and maintaining
the erosion control system.
Print name:Daniel Powers
Signature:
Date:December 11,2017
n..
r
w `
y
m_
3
y
The Morin-Cameron
Engineers•Surveyors
Environmental Consultants•Land Use Planners
66 Elm Street
Danvers,MA 01923
www.morincameron.com
978-777-8586
FAX 978-774-3488
Erosion Control Site Inspection Report
General Information
Project Name: North Andover Country Club-Clubhouse Patio and Fire Pit(500 Great Pond Road)
Watershed District Special September 5,2017 Location: North Andover, MA
Permit Issuance Date:
Date of Inspection: December 21,2017 Start/End Time: 12:40 PM-12:45 PM
Inspector's Name(s): Daniel Powers
Inspector's Title(s): Environmental Inspector
The Morin-Cameron Group,Inc.
Inspector's Contact 66 Elm Street
Information Danvers, MA 01923
978-777-8586
Describe present phase
of construction Patio/Fire Pit construction
Type of Inspection:
® Regular ❑ Pre-storm event ❑ During storm event ❑ Post-storm event
Weather Information
Has it rained since the last inspection?
®Yes ❑ No
Precipitation Amount Measured at Lawrence Airport between December 13-December 20 =0.00 inches
Weather at time of this inspection? 30°,Clear
Do you suspect that discharges may have occurred since the last inspection?
❑Yes ® No
Are there any discharges at the time of inspection?
❑Yes ® No
Site-specific BMPs
BMP Installed Date for corrective
BMP Description and Operating Corrective Action Needed action/responsible
Properly? person
Hay waddle 0 Yes 0 No N/A(See comments) N/A
Overall Site Issues
Corrective Action Date for corrective
BMP/Activity Implemented? Maintained? Needed action/responsible
person
Are all slopes and disturbed
areas not actively being ®Yes❑ No ®Yes ❑ No N/A N/A
worked properly stabilized?
Are natural resource areas
(e.g.,streams,wetlands, N/A(See
mature trees,etc.)protected ❑Yes® No ®Yes❑ No comments) N/A
with barriers or similar
B M Ps?
Are perimeter controls and
sediment barriers
adequately installed (keyed ❑Yes ® No ®Yes❑ No N/A N/A
into substrate)and
maintained?
Is there evidence of
sediment being tracked into ❑Yes® No ®Yes ❑ No N/A N/A
the street?
Is trash/litter from work
areas collected and placed ®Yes❑ No ®Yes❑ No N/A N/A
In covered dumpsters?
Are vehicle and equipment
fueling,cleaning,and
maintenance areas free of ®Yes❑ No ®Yes❑ No N/A N/A
spills,leaks,or any other
deleterious material?
Additional Comments
® All disturbed areas had been sodded and are now fully stabilized and the hay waddle has been removed (as of
12/4/2017 inspections).
Certification statement:
The undersigned has inspected the site and has informed the site contractor of responsibilities for repairing and maintaining
the erosion control system.
Print name:Daniel Powers
Signature: �.�
Date:December 21,2017
' �`r�tt��t � �� � � s Z s
�� {matt i � u� a �st{��.i e � r "�
���t}#�t�4���ts to �� a ���t�ris�tl�t�i ��� /P�' �1
t ��� e �t
s�fi�'t7 star ��' "••' t},.?�Nttllttii z t �i �q,,
� ��i{fit`sc;ta t +,t a. '�'7 �s�?"��ta� ,.i� `� Y�KR4 t sky ��, �,,.,
a 't� �;,'� �� � '�' �./ ,
s Est a�St ttc ��t �,�
��Q "i � t �`� ai t ��
at�� r ` u � , �„ � � t t= � r � � t
a tt ��q�. , �` ���r
;�h{ ltit ft Y z ;� � d�"� � '
� n
���� �C
tt ii.�
�S ttl� a � � � t' z t � {
} � 1 !u f I
,�}f �
�r��~g�#is�a i{t c � � � �� ��' t y�� 'r 7` ! m r l� I�,
�'„ ��z try t �' ". ;�;t��F{i tt
3 �'�titt t fit �'`�P�t �tr �. ���
tt�'>�� ' ( aE�� �a t s
� 9 �15�tZt11 � {v�Fj � ttti+P'��F }� � ,
�1��i��S,t ���# §''�
�c?� of '.. ���?�
t�� ����tt t,� �' �'t
s s ,���29t t. :a � a��
����t�t��f t� r � � �;�,' t � e
�� ���� l`
;`����S�r� tjt�`�� x ,
��1��tj f� �t�},tt1 t � �t�1 rr 1 �
t�t�t� t�v �" t n' } ,
�ll�� }
�st`tJ�'T�1tt�'��t t2 �� .i i � i
����t � t
�t �i��ijftt�ts�t�
3 t��,����� � � a,
� ����al��}�t{�t ���
t
��'z� t,`1����t
�� �tt�t �
��`� �f;t`t �'
�"ss���� �z�"tti��c� � �t
`t 2 �Si�3��}c� 17�t C����}4` s h
4 1 t ��(}UF � b-�
�t�„
j,
S<: