North Andover Wealth Department
Community and Economic Development Division
October 10, 2018
Michael Donovan Cornelius Donovan
12 Johnson Street 12 Trolley Car lane
North Andover, MA 01845 Londonderry,NH 03053
Thomas Donovan
5000 Wheatridge Drive
Fuquay-Varina,NC 27526
Re: Subsurface Sewage Disposal System Plan for 500 Boxford Street—Lot 1.
(Map 105C, Lot 42)
To Whom It May Concern:
The proposed wastewater system design plan for the above site dated September 26, 2018 and
received on October 5, 2018 has been approved with minor revisions from the original approval
from October 7, 2016. The location of the leaching trenches have been slightly shifted to the
west by approximately 4' on the southern end and 16' on the northern end of the trenches. The
design and proposed plans are consistent with the original approvals however, two additional
deep holes and a perc test will need to be verified onsite while excavating the bottom of bed to
meet Title 5 soil testing requirements within the disposal area.
The design has been approved for use in the construction of a new on-site septic system for a 4-
bedroom (maximum of 9 total rooms) home utilizing a gravity leach field system. This design
plan approval is valid until October 10, 2021.
During this time, a licensed septic system installer must obtain a permit and complete this work,
and a Certificate of Compliance be endorsed by the installer, designer and the Town of North
Andover.
Page 1 of 3
North Andover 1--lealth Department
120 Main. Street
North Andover, MA 01845
Phone: 978.688.9540 Fax: 978.688.8476
500 Boxft)rd Street- Lot I October 10, 2018
This approval is also subject to the following conditions:
I Prior to the issuance of the Disposal Works Construction Permit, the applicant must
submit a foundation as-built at the same scale as the approved plan
2. Prior to the issuance of the Disposal Works Construction Permit, the applicant must
submit the floor plans of the proposed dwelling showing no greater than 4 bedrooms
or a total of 9 rooms.
3. If site conditions are found in the field to be different from those indicated on the
design plan and/or soil evaluation, the originally issued Disposal Systern Construction
Permit is void, installation shall stop, and the applicant shall reapply for a new
Disposal Systems Construction Permit (3 10 CMR 15.020(l)).
4. It is the responsibility of the applicant and/or the applicant's septic system designer,
septic system installer or other representative to ensure that all other state and
municipal requirements are met. These may include review by the Conservation
Commission, Zoning Board, Planning Board, Building Inspector, Plumbing Inspector
and/or Electrical Inspector. The issuance of a Disposal System Construction Permit
shall not construe and/or imply compliance with any of the aforementioned
requirements.
Please feel free to contact the office with any questions you may have. We look forward to
working with you to obtain a wastewater treatment and dispersal system which will be in
compliance with all regulations and assure protection of public health and the environment of
North Andover.
Sinceroy,
drian)/LaGrasse, Cl(d-11
Director of Public Health
Encl. Installers list
cc: William McCloud, Andover Consultants
File
..............