Loading...
HomeMy WebLinkAbout- Correspondence - 1429 OSGOOD STREET 7/26/2018 o i North Andover Health Department Community and Economic Development Division July 26, 2018 Wayne Keefner, P.E. Allen &Major Associates, Inc. 100 Commerce Way Woburn, MA 01801-8501 Ile: 1.429 Osgood Street (Map 34, Lot 20) Dear Mr. Keefner: The proposed wastewater system design flan for the above site dated July 10, 2018 and received on. July 10, 2018 has been reviewed. Unfortunately,the plan cannot be approved until the following items are corrected. The specific section in 'Title 5: 31.0 CMR 15,000, or North Andover regulation that is not met by this design follows each item where applicable. General 1. The location and log of all test pits and percolation tests were not depicted on the design plan (310 CMR 15.220(4)(h-i)). 2. A benchmark is required within 50 to 75 feet of the system components is required (310 CMR 15.220(4)(q)). 3. A locus map was not depicted on the design plan (310 CMR 15.220(4)(t)). 4. The map and lot were not depicted on the design plan (310 CMR 15.220(4)(u)). System components -General 5. A note should be added to the design plan to indicate that the septic tank,pump chamber and distribution box shall be made watertight in accordance with 310 CMR 15,221(1), 6. A 6" stone base is required beneath the septic tank,pump chamber and distribution box (310 CMR 15.221(2)). 7. Buoyancy calculations were not submitted for the septic tank and pump chamber(310 CMR 15.221(8)). 8. Based on the ESHWT it appears the inlet and outlet inverts of the septic tank and pump chamber will not meet the requirement of being 12" above the ESHWT in accordance with 310 CMR 15.227(5)), Therefore,.a Local Upgrade Approval (LUA) request is Pagel of 3 North Andover Health Department, Town Hall, 120 Main Street, North Andover, MA 01845 Phone: 978.688.9540 Fax: 978,688, 9542 required. The LUA form 9A Should be submitted with the revised design plan and noted on the design plan. Septic tank 9. Since the building sewer line is proposed to cross the water service line the requirements from note#18 on sheet C-101 will apply and should be noted clearly in the site plan view and profile view, 10. On sheet C-102, the septic tank detail should depict the required depths of the inlet and outlet tees (3 10 CMR 15.227(6)). Pump chamber 11. On sheet C-102, the manufacturer and model number were not depicted for the pump chamber(NA, 3.2). 12. Indicate the proposed vehicle loading of the pump chamber (1-1-10 or H-20) (3 10 CMR 15.231(5)). 13. The design plan shall indicate that the pumps and alarm shall be on separate circuits (3 10 CMR 15,231(9)), 14. An effluent filter is required prior to the pump chamber (31.0 CMR 15.23 1(10)). The DEP approved brand, model number and required annual maintenance for the effluent filter should be noted on the design plan as well. 15. Pump specifications were not provided (3 10 CMR 15.220(4)(r)), 16. Please confirm that mercury float switches are allowed to be used in the pump chamber and the junction box is allowed to be installed inside the pump chamber. Distribution box 17. An inlet tee is required in the distribution box (3 10 CMR 15.232(3)(a)). 1,8. On sheet C-102, the profile appears to depict approximately 3" of cover material above the distribution box. It is recommended that 9" of cover material be provided. Soil absorption system 19. A finished grade slope of 0.02 feet per foot is required above the soil absorption system (310 CMR 15.240(10)). Proposed spot grade elevations should be shown to depict the minimum cover material and slope. 20. An inspection port is required in the soil absorption system (310 CMR 15.240(13)). 21. On sheet C-10 1, it appears the removal and sand fill for the leach trenches extends westerly approximately 20 additional feet beyond the required overdig. Please explain the reason for this additional sand overdig. 22. On sheet C-101, crushed stone appears to be proposed to the north of the leach trenches between the proposed concrete retaining wall and the existing retaining wall. If this is correct it should be labeled accordingly and shown in the profile cross section view. 23. A concrete retaining wall detail should be depicted on the design plan. 24. On sheet C-101, the storm water basin to the west of the leach trenches should be labeled accordingly. Although not a reason for disapproval, you may wish to consider the following: 25. A reserve area is not required for a septic system replacement with no additional flow. The proposed leach trenches could be closer together than proposed in order to reduce the amount of sand fill and concrete retaining wall needed. Page 2 of 3 North Andover Health Department, Town Hall, 120 Main Street, North Andover,MA 01845 Phone: 978.688.9540 Fax: 978.688. 9542 26. A leach field design could potentially reduce the height of the proposed concrete retaining wall compared to the leach trench design, Please feel free to contact the office or Mill River Consulting at 978-282-0014 with any questions you may have. We look forward to working with you to obtain a wastewater treatment and dispersal system which will be in compliance with all regulations and assure protection of public health and the environment of North Andover. Sincerely, /I el��l?4 B anJ, aGrasse, CEHT Director of Public Health cc: Oliver Enterprises, Inc. fil e Page 3 of 3 North Andover Health Department, Town Hall, 1.20 Main Street, North Andover, MA 01.845 Phone: 978.688.9540 Fax: 978.688. 9542