Loading...
HomeMy WebLinkAbout- As-Built Plan / Installation Certificate Form - 185 MILL ROAD 11/6/2018 7ONIN9_ZEQ2YARQtL S17.-5g'401,,N SEPTIC AS-BUILT ZONING DISTRICT. R2 #185 MILL ROAD NORTH ANDOVER, MASS. PREPARED BY: SULLIVAN ENGINEERING GROUP, LLC All IC P.O. BOX 2004 WOBURN, MA 01888 Al (781) 854-8644 DATE. 1011118 SCALE. 1"=30' I CERTIFY THE LOCATIONS, ELEVATIONS, TIES, COVER MATERIAL; EXPOSED COMPONENT LOT 2C COVERS, ETC., SI IOWN ON THIS AS-BUILT SUBSTANTIALLY AGREE WITH THE APPROVED 43,560 S.F. PLAN AND HAVE DETERMWED THAT THE BREAK OUT ELEVATIONS HAVE BEEN MET. LOT 18 '01 All 01 10 30 _4C (6'1�� AW yp 01 5C All J.01-IN D. SULLIVAN III, RE 2A RVc 3A r NOTE: ALL SEPTIC PIPE IS 4" SCH. 40 PVC 4A z TOP OF FOUNDATION ELEV=-233.75' ELF m.a 3' WDE X 75' LONG LEACHING TRENCH VENT PIPE e 1,500 GALLON CONIC. 0 SEPTIC SYSTEM.STEM TIES SEPTIC TANK BUILDING CORNER A ET C SEWER AT FOUNDATION - 4.5' - SEPTIC COVER 22.1' 130 37.1' SEPTIC OUTLEI COVER130 44.w- ffCONCRETE=0-BOX CENTER OF D-BOX_ 0 D B X H-20 RATED-- BEG. LEACH TRENCH 1 33.0' 39.8' 74.1' 'Ro END LEACH TRENCH 1 2 49.7' 73' - DEG. LEACH TRENCH 2 43.5' 1 4&" 00- END LEACH TRENCH 2 - 1 56.7' 39.3' 1VENT PIPE SCHEDULE OF ELEVADONS DESIGN AS-BUILT NAIL IN UTILITY POLE 236 85' 231,26' SEWER INVERT OUT FOUNDATION - ELEV=233.00' SEWER INVERT INTO SEPTIC TANK 230.65' 213 0.9 0' SEWER INVERT OUT SEPTIC TANK 230,40' 23065' SEWER INVERT INTO D--BOX 230.10' 230.15' EWER INVERT OUT OF D-BOX 229.93' 229.98' .............. — EWER INVERT BEGIN LEACHING TRENCH 229.88' 229.96' SEWER INVERT END LEACHING TRENCH 229.50' 229,56' BOTTOM OF LEACHING FIELD 228.50' 228.56' MAXIMUM SEASONAL GROUNDWATER 224.50' RECEIVIRD 1(TVJOF6VMHANDOVER 14EALRIDEPARHOEM'