Loading...
HomeMy WebLinkAbout- Consultant Review - 185 MILL ROAD 11/6/2018 « i North Andover Health Department Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 185 Mill Road MAP: 107.A LOT: 28 INSTALLER: Tim Quinlan DESIGNER: Jack Sullivan — Sullivan Engineering PLAN DATE: 6-6-17, rev 1/8/2018, 1124/2018, 2/1/2018 BOH APPROVAL DATE ON PLAN: 6/18/18 INSPECTIONS TANK INSPECTION: 9/17/2018**see email from engineer DATE OF BED BOTTOM INSPECTION:9/17/2018**see email from engineer DATE OF FINAL CONSTRUCTION INSPECTION: 10/1/18 DATE OF FINAL GRADE INSPECTION:11/2/2018 SITE CONDITIONS ❑ Contractor reports any changes to design plan ❑ Existing septic tank properly abandoned ® Internal plumbing all to one building sewer ® Topography not appreciably altered Comments: SEPTIC TANK Building sewer in continuous grade, on compacted firm base ❑ Cleanouts per plan ❑ Bottom of tank hole has 6" stone base ❑ Weep hole plugged 1500 gallon tank has been installed H-10 loading Monolithic tank construction I Watertightness of tank has been achieved by visual testing Inlet tee installed, centered under access pork 1 ® Outlet tee installed, centered under access pork (gas baffle) ❑ inch cover to within 6" of finish grade installed over one access port ® Hydraulic cement around inlet & outlet t i Comments: DISTRIBUTION-BOX ® Installed on stable stone base ® H-20 D-Box ❑ Inlet tee (if pumped or >0.08°/foot) ® Hydraulic cement around inlet & outlets ® Observed even distribution ® Speed levelers provided (not required) ® Schedule 40 PVC Pipe Comments: SOIL ABSORPTION SYSTEM (General) ❑ Bottom of SAS excavated down to C soil layer, as provided on plan ® Size of SAS excavated as per plan ® Title 5 sand installed, if specified on plan ❑ 40 Mil HDPE barrier installed ® Laterals installed and ends connected to header (and vented if impervious material above) ® Elevations of laterals and chambers installed as on approved plan ❑ Retaining wall (boulder/ concrete /timber/ block) ❑ Final cover as per plan Comments; FINAL GRADE ❑ Loamed ® Seeded j ® Cover per plan Comments: DOCUMENTS NEEDED Certification of Installation Form submitted By engineer and signed and dated by Engineer and installer As-Built Plan BM = 233.75 H R = 4.50 HI = 238.25 SYSTEM ELEVATIONS ROD AS-BLT INVERT DESIGN INVERT ELEVATION ELEV ELEV Benchmark Building Sewer OUT 6.73 231.19 230.85 Septic Tank IN 7.02 230.90 --------- 230.65 Septic Tank OUT 7.29 230.96 230.40 Distribution Box IN 7.81 230.11 230,10 Distribution Box OUT 7.97 229.95 229.93 Lateral 1 BEG. 7.97 229.95 229.88 Lateral 1 END 8.36 229.56 229.50 ---------- -------------- Lateral 2 BEG. 7.96 229.96 229.88 Lateral 2 END 8.37 229.55 229.50 SKETCH PLAN Lateral I closest to dwelling Lateral 2 closest to street 9/24/2018 Town of North Andover Mail-Fwd:185 Mill Road,NA-Bottom of bed No N" oVER Toni Walfenden <twolfenden@northandoverma.gov> Massachus t t _.._...._ ..... .ww_ ._...__._. _.... 1 Fwd: 185 Mill Road, NA - Bottom of bed 1 message Michele Grant <mgrant@northandoverma.gov> Mon, Sep 24, 2018 at 9:49 AM To:Toni Walfenden <twolfenden@northandoverma.gov> Michele E. Grant Public Health Inspector Town of North Andover 120 Main Street North Andover, MA 01845 Phone 978.688.9540 Fax 978.688.9542 Email mgrant@notiliandoverrtia.gov Web www.NorthAndoverma.gov ---------- Forwarded message --------- From: Jack Sullivan <jacksuI153@comcast.net> Date: Mon, Sep 24, 2018 at 9:22 AM Subject: re: 185 Mill Road, NA- Bottom of bed To: <Mgraiit@northandovenna.gov>, Brian LaGrasse <blagrasse@noilhandoverrna.gov> Brian & Michele, On 9/17 and 9/20 1 conducted a bottom of septic bed inspection at the above property and found the depth of excavation consistent with the approved plan. The inspections were done on 2 different days since the field was excavated/filled with clean sand in stages due to the length of the field (75 feet) I will complete and sign the installation card with these dates upon submission of the final as-built plan unless you would like it done sooner. Thank you. https://mail.google.com/mail/u/O/?Lai=2&ik=a0c6f4e4cf&jsver=QCPH ikMeXbw.en.&cbl=grnail_fe_180917.08_p5&view=pt&search=inbox&th=1660bd78... 1/2 i 9/24/2618 Town of North Andover Mail-Fwd: 185 Mill toad, NA-Bottorn of bed Sullivan Engineering Group, LLC Jack Sullivan P.O. Box 2004 Woburn, MA 01888 781-854-8644 1 1 i https://mail.goog le.com/rtyai l/u/0/?ui=2&ik=a0c6f4e4cf&jsver=QCPHikMeXbw.en.&cbl=gmail_fe_180917.08_p5&view=pt&Search=inbox&th=1660bd78... 2/2