ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES
LOCATION INFORMATION
ADDRESS: 185 Mill Road MAP: 107.A LOT: 28
INSTALLER: Tim Quinlan
DESIGNER: Jack Sullivan — Sullivan Engineering
PLAN DATE: 6-6-17, rev 1/8/2018, 1124/2018, 2/1/2018
BOH APPROVAL DATE ON PLAN: 6/18/18
INSPECTIONS
TANK INSPECTION: 9/17/2018**see email from engineer
DATE OF BED BOTTOM INSPECTION:9/17/2018**see email from engineer
DATE OF FINAL CONSTRUCTION INSPECTION: 10/1/18
DATE OF FINAL GRADE INSPECTION:11/2/2018
SITE CONDITIONS
❑ Contractor reports any changes to design plan
❑ Existing septic tank properly abandoned
® Internal plumbing all to one building sewer
® Topography not appreciably altered
Comments:
SEPTIC TANK
Building sewer in continuous grade, on
compacted firm base
❑ Cleanouts per plan
❑ Bottom of tank hole has 6" stone base
❑ Weep hole plugged
1500 gallon tank has been installed
H-10 loading
Monolithic tank construction I
Watertightness of tank has been achieved by
visual testing
Inlet tee installed, centered under access pork 1
® Outlet tee installed, centered under access pork
(gas baffle)
❑ inch cover to within 6" of finish grade
installed over one access port
® Hydraulic cement around inlet & outlet t
i
Comments:
DISTRIBUTION-BOX
® Installed on stable stone base
® H-20 D-Box
❑ Inlet tee (if pumped or >0.08°/foot)
® Hydraulic cement around inlet & outlets
® Observed even distribution
® Speed levelers provided (not required)
® Schedule 40 PVC Pipe
Comments:
SOIL ABSORPTION SYSTEM (General)
❑ Bottom of SAS excavated down to C soil layer,
as provided on plan
® Size of SAS excavated as per plan
® Title 5 sand installed, if specified on plan
❑ 40 Mil HDPE barrier installed
® Laterals installed and ends connected to
header (and vented if impervious material
above)
® Elevations of laterals and chambers installed as on
approved plan
❑ Retaining wall (boulder/ concrete /timber/ block)
❑ Final cover as per plan
Comments;
FINAL GRADE
❑ Loamed
® Seeded j
® Cover per plan
Comments:
DOCUMENTS NEEDED
Certification of Installation Form submitted
By engineer and signed and dated by
Engineer and installer
As-Built Plan
BM = 233.75
H R = 4.50
HI = 238.25
SYSTEM ELEVATIONS
ROD AS-BLT INVERT DESIGN INVERT
ELEVATION ELEV ELEV
Benchmark
Building Sewer OUT 6.73 231.19 230.85
Septic Tank IN 7.02 230.90 --------- 230.65
Septic Tank OUT 7.29 230.96 230.40
Distribution Box IN 7.81 230.11 230,10
Distribution Box OUT 7.97 229.95 229.93
Lateral 1 BEG. 7.97 229.95 229.88
Lateral 1 END 8.36 229.56 229.50
---------- --------------
Lateral 2 BEG. 7.96 229.96 229.88
Lateral 2 END 8.37 229.55 229.50
SKETCH PLAN
Lateral I closest to dwelling
Lateral 2 closest to street
9/24/2018 Town of North Andover Mail-Fwd:185 Mill Road,NA-Bottom of bed
No N" oVER Toni Walfenden <twolfenden@northandoverma.gov>
Massachus t
t
_.._...._ ..... .ww_ ._...__._. _....
1
Fwd: 185 Mill Road, NA - Bottom of bed
1 message
Michele Grant <mgrant@northandoverma.gov> Mon, Sep 24, 2018 at 9:49 AM
To:Toni Walfenden <twolfenden@northandoverma.gov>
Michele E. Grant
Public Health Inspector
Town of North Andover
120 Main Street
North Andover, MA 01845
Phone 978.688.9540
Fax 978.688.9542
Email mgrant@notiliandoverrtia.gov
Web www.NorthAndoverma.gov
---------- Forwarded message ---------
From: Jack Sullivan <jacksuI153@comcast.net>
Date: Mon, Sep 24, 2018 at 9:22 AM
Subject: re: 185 Mill Road, NA- Bottom of bed
To: <Mgraiit@northandovenna.gov>, Brian LaGrasse <blagrasse@noilhandoverrna.gov>
Brian & Michele,
On 9/17 and 9/20 1 conducted a bottom of septic bed inspection at the above property and found
the depth of excavation consistent with the approved plan. The inspections were done on 2
different days since the field was excavated/filled with clean sand in stages due to the length of the
field (75 feet)
I will complete and sign the installation card with these dates upon submission of the final as-built
plan unless you would like it done sooner.
Thank you.
https://mail.google.com/mail/u/O/?Lai=2&ik=a0c6f4e4cf&jsver=QCPH ikMeXbw.en.&cbl=grnail_fe_180917.08_p5&view=pt&search=inbox&th=1660bd78... 1/2
i
9/24/2618 Town of North Andover Mail-Fwd: 185 Mill toad, NA-Bottorn of bed
Sullivan Engineering Group, LLC
Jack Sullivan
P.O. Box 2004
Woburn, MA 01888
781-854-8644
1
1
i
https://mail.goog le.com/rtyai l/u/0/?ui=2&ik=a0c6f4e4cf&jsver=QCPHikMeXbw.en.&cbl=gmail_fe_180917.08_p5&view=pt&Search=inbox&th=1660bd78... 2/2