HomeMy WebLinkAbout- Consultant Review - 350 SHARPNERS POND ROAD 11/13/2018
North Andover Health Department
Community and Economic Development Division
ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES
LOCATION INFORMATION
ADDRESS: 350 Sharpners Pond Road MAP: 90.B LOT: 51
INSTALLER: John DiVincenzo - Stewarts
DESIGNER:
PLAN DATE:
BOH APPROVAL DATE ON PLAN:
D-Box 11/7/2018 – M.Grant
INSPECTIONS
TANK INSPECTION:
DATE OF BED BOTTOM INSPECTION:
DATE OF FINAL CONSTRUCTION INSPECTION:
DATE OF FINAL GRADE INSPECTION:
Comments:
DISTRIBUTION-BOX
Installed on stable stone base
H-20 D-Box
Inlet tee (if pumped or >0.08’/foot)
Hydraulic cement around inlet & outlets
Observed even distribution
Speed levelers provided (not required)
Schedule 40 PVC Pipe
Comments: