Loading...
HomeMy WebLinkAbout- Consultant Review - 350 SHARPNERS POND ROAD 11/13/2018 North Andover Health Department Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 350 Sharpners Pond Road MAP: 90.B LOT: 51 INSTALLER: John DiVincenzo - Stewarts DESIGNER: PLAN DATE: BOH APPROVAL DATE ON PLAN: D-Box 11/7/2018 – M.Grant INSPECTIONS TANK INSPECTION: DATE OF BED BOTTOM INSPECTION: DATE OF FINAL CONSTRUCTION INSPECTION: DATE OF FINAL GRADE INSPECTION: Comments: DISTRIBUTION-BOX Installed on stable stone base H-20 D-Box Inlet tee (if pumped or >0.08’/foot) Hydraulic cement around inlet & outlets Observed even distribution Speed levelers provided (not required) Schedule 40 PVC Pipe Comments: