Loading...
HomeMy WebLinkAbout2014-08-05 Planning Board Minutes PLANNING BOARD •-41/ 1 Meeting Minutes August 5, 2014 Town Hall, 120 Main Street 7:00 PM PACI1 1 \COI 1 Present: M. Colantoni, L. Rudnicki, L. McSherry, D. Kellogg, P. Boynton i 2 Absent: J. Simons 3 Staff Present: C. Bellavance, J. Enright 4 5 Meeting began at 7:00 pm. 6 7 BOND RELEASE 8 Clear Wireless LLC: Requesting two performance G bond releases. One bond is for 203 9 Turnpike Street and the other is for 300 Chestnut Street. Each bond is in the amount of$5,000. 10 C. Bellavance: Existing equipment was replaced on the wireless towers located at 300 Chestnut 11 Street and 203 Turnpike Street. The Building Inspector has verified the work matches the as- 12 built plans. The criteria for bond release have been met. 13 MOTION 14 A motion was made by D. Kellogg to release the Clear Wireless LLC bond funds plus any 15 accumulated interest for 203 Turnpike Street and 300 Chestnut Street. The motion was seconded 16 by L. McSherry. The vote was unanimous, 4-0 in favor. 17 18 PUBLIC HEARINGS 19 NEW PUBLIC HEARING, Merrimack College, 315 Turnpike Street: Application for Site Plan 20 Review. Applicant proposes four 2-3 story new residential buildings and one 3 story student 21 common building on an approximately 4.5 acre area along Flaherty Road, Rock Ridge Road, and 22 the Sakowich Campus Center within the R-3 zoning district. Two of the proposed residential 23 buildings are located in North Andover and two residential buildings and the student common 24 building are located in Andover. 25 C. Bellavance: A Site Plan Review Special Permit application has been received. Also received 26 was a letter from Attorney Robert Lavoie representing Merrimack College requesting that the 27 Dover Amendment be applied to their application. This letter has been forwarded to Town 28 Counsel, Tom Urbelis. We have not heard back from T. Urbelis regarding the letter. 29 MOTION 30 A motion was made by L. Rudnicki to open the public hearing for 315 Turnpike Street without 31 taking any evidence and continuing until the next public hearing when Town Counsel can weigh 32 in on the subject. The motion was seconded by L. McSherry. The vote was unanimous,4-0 in 33 favor. 34 35 CONTINUED PUBLIC HEARING, Town of North Andover, Corner Chickerin$Road and 36 Prescott Street: Applicant proposes construction of a 14,500 sq. ft., two-story Fire Station with 37 26 parking spaces, stormwater management, landscaping, lighting and utilities in the Residential 38 2 (R-2) zoning district. 39 C. Bellavance: The applicant will go before the Conservation Commission for a Request for 40 Determination of Applicability (RDA) on August 13, 2014. The Commission wants to review 41 plans to make sure the drainage swale is not a wetland resource. L. Eggleston, stormwater peer 42 reviewer, has worked with the Town's engineer and reached agreement on the best method for 1 PLANNING BOARD Meeting Minutes August 5, 2014 Town Hall, 120 Main Street 7:00 PM 43 stormwater management design and the changes have been reflected in the most recent set of 44 plans. 45 MOTION 46 A motion was made by L. Rudnicki to close the public hearing for the Lot at the Corner of 47 Chickering Road and Prescott Street for the new fire station. The motion was seconded by L. 48 McSherry. The vote was unanimous, 4-0 in favor. 49 A draft Notice of Decision was reviewed. 50 MOTION 51 A motion was made by L. Rudnicki to approve the Site Plan Review for the Lot at the Corner of 52 Chickering Road and Prescott Street, Assessor's Map 100 Lot 5 for the fire station as amended. 53 The motion was seconded by D. Kellogg. The vote was unanimous, 4-0 in favor. 54 55 CONTINUED PUBLIC HEARING, Dimitrios Saragas, 107 Campion Road: Applicant seeks to 56 construct a single family dwelling, driveway, site utilities, and lot grading within an isolated 57 wetland and its 100 foot buffer in the Non-Disturbance Buffer Zone of the Watershed Protection 58 District. 59 C. Bellavance: All of L. Eggleston's comments have been addressed. A Decision has been 60 drafted. 61 MOTION 62 A motion was made by L. McSherry to close the public hearing for 107 Campion Road. The 63 motion was seconded by D. Kellogg. The vote was unanimous, 4-0 in favor. 64 A draft Notice of Decision was reviewed. 65 MOTION 66 A motion was made by D. Kellogg to approve the Watershed Special Permit for 107 Campion 67 Road as amended. The motion was seconded by L. McSherry. The vote was unanimous, 4-0 in 68 favor. 69 70 MEETING MINUTES 71 Approval of July 15, 2014 meeting minutes. 72 MOTION 73 A motion was made by L. Rudnicki to approve the July 15, 2014 meeting minutes as amended. 74 The motion was seconded by L. McSherry. The vote was unanimous, 4-0 in favor. 75 76 ADJOUNMENT 77 MOTION 78 A motion was made by P. Boynton to adjourn the meeting. The motion was seconded by D. 79 Kellogg. The vote was unanimous, 5-0 in favor. 80 81 The meeting adjourned at 7:25 pm. 82 83 MEETING MATERIALS: Agenda, Merrimack College: Site Plan Review application, Site 84 Plans North Campus Development dated 7/7/14 rev. to 7/10/14, D. McCarron email dated 2 4 a PLANNING BOARD Meeting Minutes August 5, 2014 Town Hall, 120 Main Street 7:00 PM 85 8/5/14, Jennifer Ross email dated 8/2/14, Letter dated 7/29/14 from Robert Lavoie, Esq. Johnson 86 & Borenstein, LLC re: Dover Amendment Analysis for North Campus Development submitted 87 by Merrimack College; 107 Campion Road: Draft Notice of Decision dated 8/8/14, Letter dated 88 7/15/2014 from L. Eggleston re: Watershed Special Permit 107 Campion Road, Site Plan 107 89 Campion Road rev. to July 9, 2014, Landscape Plan 107 Campion Road dated 7/30/14; Town of 90 North Andover: Draft Notice of Decision dated 8/5/14, Central Fire Station plans (sheets C1.0- 91 C7.0 rev to 8/5/14)), Central Fire Station site plans (sheets SP1.1, L1.1, L1.1, A2.1, A2.2, A2.3, 92 A3.1, LC.1, C1.0-C7.0 rev to 7/15/14), Letter dated 7/24/14 from Ray Santilli re: Site Plan 93 Review-New Central Fire Station, Email dated 8/5/14 from Paul G. Costello, P.E., Polaris, re: 94 New Central Fire Station rev. sheets C-4, C-5, and C-6, Email dated 8/5/14 from Brett Donham, 95 Donham and Sweeney Architects re: New Central Fire Station; Draft meeting minutes 96 07/15/2014. 3