Loading...
HomeMy WebLinkAbout- Consultant Review - 50 FARNUM STREET 12/17/2018 North Andover Health Department Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 50 Farnum Street MAP: 107.A LOT: 87 INSTALLER: Peter Breen DESIGNER: Christiansen & Sergi PLAN DATE: October 1, 2018, revised November 6, 2018 BOH APPROVAL DATE ON PLAN: 11/20/2018 INSPECTIONS TANK INSPECTION: 12/7/18, 12/3/2018 see photos DATE OF BED BOTTOM INSPECTION: 11/29/2018 DATE OF FINAL CONSTRUCTION INSPECTION: 12/7/18 DATE OF FINAL GRADE INSPECTION: 12/11/2018 SITE CONDITIONS Contractor reports any changes to design plan Existing septic tank properly abandoned Internal plumbing all to one building sewer Topography not appreciably altered Comments: SEPTIC TANK Building sewer in continuous grade, on compacted firm base Cleanouts per plan Bottom of tank hole has 6” stone base Weep hole plugged 1500 gallon tank has been installed H-10 loading Monolithic tank construction Water tightness of tank has been achieved by visual testing Inlet tee installed, centered under access port Outlet tee installed, centered under access port (gas baffle/effluent filter) _____ inch cover to within 6” of finish grade installed over one access port Hydraulic cement around inlet & outlet Comments: Gas baffle only – no filter required with Presby, Tank crushing see photos DISTRIBUTION-BOX Installed on stable stone base H-20 D-Box Inlet tee (if pumped or >0.08’/foot) Hydraulic cement around inlet & outlets Observed even distribution Speed levelers provided (not required) Schedule 40 PVC Pipe Comments: SOIL ABSORPTION SYSTEM (General) Bottom of SAS excavated down to C soil layer, as provided on plan Size of SAS excavated as per plan Title 5 sand installed, if specified on plan 40 Mil HDPE barrier installed Laterals installed and ends connected to header (and vented if impervious material above) Elevations of laterals and chambers installed as on approved plan Retaining wall (boulder / concrete / timber/ block) Final cover as per plan Comments: 25x42 FINAL GRADE Loamed Seeded Cover per plan Comments: DOCUMENTS NEEDED Certification of Installation Form submitted By engineer and signed and dated by Engineer and installer As-Built Plan BM = _99.72_____ HR = ______ HI = _101.88____ SYSTEM ELEVATIONS ROD AS-BLT INVERT DESIGN INVERT ELEVATION ELEV ELEV Benchmark 2.16 Building Sewer OUT 1.83 99.7 99.58 Septic Tank IN 2.15 99.38 99.56 Septic Tank OUT 2.38 99.15 99.01 Pump Chamber IN Pump Chamber OUT Distribution Box IN 2.65 98.88 98.95 Distribution Box OUT 2.81 98.72 98.78 Lateral 1 TOP 3.0 98.53 98.58 Lateral 1 INVERT Lateral 2 TOP 3.0 98.53 Lateral 2 INVERT Lateral 3 TOP 3.0 98.53 Lateral 3 INVERT Lateral 4 TOP 3.0 98.53 Lateral 4 INVERT Lateral 5 TOP 3.0 98.53 Lateral 5 INVERT Lateral 6 TOP 3.0 98.53 Lateral 6 INVERT Lateral 7 TOP 3.0 98.53 Top of Chamber Bottom of Bed/Chamber