HomeMy WebLinkAbout- Plans - 1725 TURNPIKE STREET 7/2/2018 DRAWING INDEX a ❑ A.L. PRIME ENERGY
ORIG DATE LAST REV REV DATE �a CONSULTANT, INC.
18 LARK AVENUE
C-0.0 COVER 07102/18 NONE N/A SAUGUS MA 01906
C-1.0 PROPOSED SITE IMPROVEMENTS 07/02/18 NONE N/A --Energy (781)246-0201
C-1.1 PARTIAL PROPOSED SITE(ENLARGED) 07/02/18 NONE N/A PROJCONTACTS:ANTHONY A.COPANLESQ..978£88-0010X15
ANTHONY GUBA P.E.,MOBILE 512.745-0400
--- EXISTING CONDITIONS SURVEY 11/30/16 NONE NIA
A1.0 PROPOSED FLOOR PLAN 07/02/18 NONE N/A
A2.0 PROPOSED ELEVATIONS 07/02/18 NONE N/A
A3.0 CANOPY ELEVATIONS 07/02/18 NONE N/A MINOR SITE PLAN CHANGE
A.L. PRIME #108
1725 TURNPIKE RD (RTE 114)
N. AN DOVE R, MA 01845
ZBA SPECIAL PERMIT AND VARIANCE
O� S 3 Yy
G
DATE of FILING: d A.L.PRIME ENERGY
o CONSULTANT,INC.i 10LARKAVENUE
DATE OF PUBLIC HEARING: E„ gy SAUGUS MA 01906
N p81)24—W
DATE OF APPROVAL: Z aoacrnooaasa a Al PRIME SITE#108
u,
W N. ANDOVER, MA
APPROVED BY THE NORTH ANDOVER ZONING BOARD OF APPEALS: 0: 1725 TURNPIKE ST(RTE 114)
o
PROJECT
COVER SHEET
.a 108-018-01 N ANDOVER I.—T
AS NOTED
AG C-0.0
1N0"T` 2018-07-02
T"- NONE a NONE
GENERAL NOTES ZONING INFORMATION-MAP 107.E BLOCK 0056 LOT 0.0(PARCEL 2101107.B-0056.0000.0) x+n orlxnxLt
1. THE CONTRACTOR WILL BE RESPONSIBLE FOR PERMITS FROM THE LOCAL FIRE MARSHAL'S OFFICE AND TRADE OR BLDG ZONE:GENERAL BUSINESS SULItVAN ST
PERMITS FROM THE LOCAL BLDG DEPT AND ALL ASSOCIATED TESTING AND INSPECTION REQUIREMENTS. (NOT IN WATERSHED OR HISTORICAL OVERLAY DISTRICTS)
2. THE CONTRACTOR SHALL CONTACT DIG-SAFE PRIOR TO ANY CONSTRUCTION EXCAVATION(811 IN MA)
3. THE CONTRACTOR SHALL FIELD VERIFY THE FOLLOWING ITEMS PRIOR TO CONSTRUCTION: USES-SECTION 1.131:
3.1. LOCATION OF PROPERTY BOUNDARIES,EASEMENTS,AND RIGHT OF WAYS. 1.RETAIL 870RE-PERMITTED SITE -
3.2. LOCATIONS OF STRUCTURES,BUILDINGS,AND DRIVEWAYS 4.AUTOMOBILE FILLING STATION-PERMITTED(AS MODIFIED BY SECTION 8.2)
3.3. LOCATIONS,SIZES,DEPTHS OF EXSTG UG UTILITIES,PIPING,STRUCTURES,TANKS,ETC.
REQUIRED EXISTING PROPOSED ROSTD RELIEF
3.4. ALL EXSTG AND PROPOSED CRITICAL ELEVATIONS
LOTAREA 25,000 SF 23,561 SF NO CHANGE. EXSTG
4, WHERE CONFLICTS ARISE BETWEEN THE FIELD CONDITIONS VERIFIED AND PROPOSED CONSTRUCTION,OR IF THERE IS A MIN OH1Ai pVE
CONFLICT BETWEEN ANY REGULATIONS OR MUNICIPAL REQUIREMENTS AND THE PROPOSED PLANS,THE CONTRACTOR MAX.BLDG.HEIGHT 45 FT 20 FTt _20 FTt ------NONE
�'
SHALL NOTIFY THE OWNER'S REPRESENTATIVE PRIOR TO CONTINUANCE OF THE WORK, MIN.LOT FRONTAGE 125 FT(150 FT) 390.81 FT NO CHANGE NONE
5. PROPOSED WORK INCLUDES: FRONT YARD SETBACK 25 FT(100 FT) 14.6 FTt 10.0 FTi 8D FEET BURY ST
5.1. PROPERLY CLOSE AND REMOVE EXSTG SEPTIC SYSTEM
5.2. CONSTRUCT NEW 1,999 SF BUILDING FOR C-STORE RELOCATION SIDE YARD SETBACK 25 FT(40 FT) 76 FT3 3.0 FT 37 FEET
5.3. RELOCATE,UPGRADE,INSTALL NEW UTILITIES INCLUDING TIE TO MUNICIPAL SEWER AS NECESSARY REAR YARD SETBACK 35 FT(SOFT) 5 FT3 4 FTs 46 FEET
5.4. DEMO EXISTING C-STOREBUILDING NONE VICINITY MAP
5.5. INSTALL TWO FUEL DISPENSERS IN LOCATION OF EXISTING STORE FLOOR AREA RATIO(MAX) N/A - 8.5% "" GRAPHIC SCALE-Fi
5.6. EXTEND EXISTING CANOPY OVER NEW FUELING ISLANDS AND EXTEND FUELING PIPING TO NEW DISPENSERS LOT COVERAGE AREA(-A) 35% 3.3% 8.5% NONE REFERENCE-N.ANDOVER GIS
5.7, EXTEND FIRE SUPPRESSION SYSTEM TO INCLUDE NEW FUELING ISLANDS MIN OPEN SPACE(%) N/A NONE
5.8. TIE LOCAL FIRE ALARM PANEL TO RADIO BOX PER N.ANDOVER FD SPEC AND REQMNTS MAX DRIVEWAY WIDTH 30 FT 139.5 FT 89.5 FT 59.6 FT DATE OF FILING:
5.9. MINOR CHANGES TO EXSTG DRIVEWAYS AND R.O.W.CURBING SUBJECT TO APPROVALS OF CITY DPW AND MA DOT PARKING SPACES(MIN 8.0'x18')
5.10. CONSTRUCT NEW PEDESTRIAN SIDEWALK IN R.O.W.PER DPW STANDARDS
5.11. INSTALL NEW SCREENED TRASH ENCLOSURE AND LANDSCAPE SCREENING RETAIL-a.5 per ksrGPA 7 a 8 NONE DATE OF PUBLIC HEARING:
5.12. REMOVE PAVEMENT ENCROACHING ON ABUTTING LOT
5.13. REPLACE ALL DISTURBED PAVING TO MATCH EXISTING.NO CHANGE TO GRADING DATE OF APPROVAL:
5.14. NO CHANGE TO UG TANKS,NO CHANGE TO NORTHERN FUEL DISPENSING AREA OR CANOPY
L.LD .EO
NCE:MMISSIONER DENIAL ANDZONING BYLAW REVIEWFORM,PERMIT W35806,DATED 5/23t18
F NORTH ANDOVER ZONING BYLAW 1972,AMENDED MAY 10,2016 APPROVED BY THE NORTH ANDOVER ZONING BOARD OF APPEALS:
_�' 4,d J.C.ENDER ~-A9UTTER REMO GEXISTING n�(
CEDAR - COMMONWEALTH
NEW SCREENED __FENCING htYNNWC 0 "Z#P--D OF MA
TRASH ENCLOSURE - _' =N ep_1ftAp
INCLUDING GAS
EMGCY GENERATOR i-1 -3 '� ADD PAVING AND
REMOVE ALL STRIPING FOR ADDITIONAL
APPROX LOCA71ON s' a .e✓�ENCROACHING PAVEMENT PARKING AREA
OF LEACH FIELD TO
BE REMOVED 3 \Ia 9
SUW _+,_ 5 E `z
DONA/LD �i�o I E "t - J+sa
JONNSTON I i I lJ 3 I _ E%STG UG STORAGE -�
NP TANKS TO REMAIN
__ F
--tt I Ii 0 EX9T0 EDGE OF �Y \
I _ �
EXSTG FREESTANDING v'++ ��.."^'`__� i^"Q 15K O PAVEMENT
ID SIGN TO REMAIN n 15 0I[® ( L a I •• LEDGE BED 3
LED
NEW TIE TO / 1 20:0' 320' C10K 00(B g
MUNICPAI SEWER �-(1 O o --b EXSTG CANOPY AND 99 a
i ns2 wsa m COMMOONWEALTH T �
�\£++.Ts ISLAND TO REMAIN REMAINAPE AREA TO in vr'' i '•� T 3
_ -1 in` EXSTG CANOPY AND THREE a.es
EXSTG DRAINA ISLANDS TO REMAIN Iss.3 v£ JONA� 1
SWALE ' �6,43`' I 15.5' 36.5' _ 40.0' 89.5' �-I L
�. 19021 1 _' REDUCE 364.38' S 36'59'48"E \ EXTEND REDUCE DRIVEWAY \ IN
'�nssss` DRIVEWAY UTILITY ) LANDSCAPE WIDTH BY 30X z�, UTILITY IgI
ADD CONCRETE i UTILITY Y I WIDTI1 BY POLE AREA POLE.Sf �$ Q A.L.PRIME ENERGY
PEDESTRIAN WALK 1 POLE .e 30F I'ry p
CONSULTANT,INC.
I ��IJLJtI� 18 LARK AVENUE
wa.s i " 11 I la9'B6 "I j
++DCUT EXSTG WATER SVC SAUGUS MA 01808
IS Energy
AND STUB TO NEW METER Iq N (781)246-0201
1 LOCATION Z
I .-SO'48°E -ET"D. "
IT. 17" n.eD4a Al PRIME SITE#108
'I TURNPIKE ROAD (ROUTE 114) N N. ANDOVER, MA
1725 TURNPIKE ST
SITE LAYOUT
D 1 OHN c.FARNUM PROPOSED IMPROVEMENTS
JOHNEstA ERNUM JOHNESTA ERNUM ESTATE PRIME GAS STATION&C-STORE
FLAYOUT OF PROPOSED SITE IMPROVEMENTS ®� " GRAPHIC SCALE-FT D S 6a 108-016.01 NANDOVER
AS NOTED
REFERENCE-PROP LINES AND OTHER SITE INFO SHOWN ON THIS DWG TAKEN FROM EXSTG SEE GRAPHIC SCALE AG C-1.0
00NDITIONS PLAN FOR A.L.PRIME ENERGY CONSULTANT,INC.,BY LANDMARK ENGINEERING& Ix D..Ts
SURVEY,INC.583 CHESTNUT ST,LYNN MA 01904,781�592-7016,111302016,SCALE 1"=20' 2018-07-02
� `"Ev NONE ` NONE
29.0' 33.8'
u
ELLOW ACMYELLOW ACM
X CANOPY FASCA CANOPY FASCIA '
U
! EXTEND FIRE SUPPRESSION TWO NEW
¢ W0 NEW r Y CANOPY SY—N Co"'ENPRE CANOPY
COLUMNS w FUELING AREA COLUMNS
S
r
z —1cAL
DISPENSER
4 SIGNAGE
.F-1
�F--IT�
jL ti)�i
NORTH CANOPY ELEVATION °
WEST CANOPY ELEVATION
SEE GRAPHIC SCALE
SEE GRAPHIC SCALE
29.0'
v———
..._— fi_ --_ l t-
YELLOW ACM ~-
CANOPY FASCIA X 1 `
TWO NEW ¢ '
CANOPY '£IOYkt-
COLUMNS
ttt'''��� A.L.PRIME ENERGY
30,0' n i U,(�Q( n CONSULTANT,INC.
19 LARK AVENUE
I' — Ener9r SAUOUSM401908
if
x I (781)246-6207
W i' Z "wacr"oo"as
2 ° ° Al PRIME SITE#108
N. ANDOVER MA
1725 TURNPIKE ST
SOUTH CANOPY ELEVATION F CANOPY ELEVS
SEE GRAPHIC SCALE
PROPOSEDIMPROVEMENTS
PRIME GAS STATION&C-STORE
o °a 108-018.01 N ANDOVER a`
" AS NOTED
AG A-3.0
2018-07-02
rc r"w NONE ° NONE