HomeMy WebLinkAbout- Plans - 1725 TURNPIKE STREET 7/2/2018 (3) DRAWING INDEX a D ❑ A.L. PRIME ENERGY PRIG DATE LAST REV REV DATE �a CONSULTANT, INC. ILJI 18 LARK AVENUE C-0.0 COVER 07/02/18 NONE N/A SAUGUS MA 01906 C-1.0 PROPOSED SITE IMPROVEMENTS 07/02/18 NONE N/A Energy (7$1)246-0201 C-1.1 PARTIAL PROPOSED SITE(ENLARGED) 07/02/18 NONE N/A PROJCONTACTS:ANTHONY A.COPANI,ESQ.,878E80-0010X15 ANTHONY GUBA P.E..MOBILE 512-745-6400 --- EXISTING CONDITIONS SURVEY 11/30/16 NONE N/A A1.0 PROPOSED FLOOR PLAN 07/02/18 NONE N/A A2.0 PROPOSED ELEVATIONS 07102/18 NONE NIA MINOR SITE PLAN CHANGE A3.0 CANOPY ELEVATIONS 07/02/18 NONE N/A A.L. PRIME #108 1725 TURNPIKE RD (RTE 114) N. ANDOVER, MA 01845 ZBA SPECIAL PERMIT AND VARIANCE , SlONAL DATE OF FILING: ��d A.L.PRIME ENERGY CONSULTANT,INC. /8 LARK AVENUE DATE OF PUBLIC HEARING: e�e,sr SAUGUS MA 01605 (181)— � (]Bi)248A201 DATE OF APPROVAL: Z .d•=*noo..w 0 A.L PRIME SITE#108 W N. ANDOVER, MA APPROVED BY THE NORTH ANDOVER ZONING BOARD OF APPEALS: 1725 TURNPIKE ST(RTE 114) o PROJECT COVER SHEET 108-018-01 NANDOVER `T AS NOTED AG C-0.0 iu oere 2018-07-02 `""' NONE ` NONE GENERAL NOTES ZONING INFORMATION-MAP 107.E BLOCK 0056 LOT 0.0(PARCEL 210/107.8-0056-0000.0) _ ,FRANQHn4 1. THE CONTRACTOR WILL BE RESPONSIBLE FOR PERMITS FROM THE LOCAL FIRE MARSHAL'S OFFICE AND TRADE OR BLDG ZONE:GENERAL BUSINESS SULUVAN PERMITS FROM THE LOCAL BLDG DEPT AND ALL ASSOCIATED TESTING AND INSPECTION REQUIREMENTS. (NOT IN WATERSHED OR HISTORICAL OVERLAY DISTRICTS) Si 2. THE CONTRACTOR SHALL CONTACT DIG-SAFE PRIOR TO ANY CONSTRUCTION EXCAVATION(811 IN MA) 3. THE CONTRACTOR SHALL FIELD VERIFY THE FOLLOWING ITEMS PRIOR TO CONSTRUCTION: USES-SECTION 1.131: 3.1. LOCATION OF PROPERTY BOUNDARIES,EASEMENTS,AND RIGHT OF WAYS. 1.RETAIL STORE-PERMITTED SITE 3.2. LOCATIONS OF STRUCTURES,BUILDINGS,AND DRIVEWAYS 4.AUTOMOBILE FILLING STATION-PERMITTED(AS MODIFIED BY SECTION 8.2) 'lp� 3.3. LOCATIONS,SIZES,DEPTHS OF EXSTG UG UTILITIES,PIPING,STRUCTURES,TANKS,ETC. REQUIRED EXISTING PROPOSED RQSTD RELIEF �'Sf 3.4. ALL EXSTG AND PROPOSED CRITICAL ELEVATIONS 4. WHERE CONFLICTS ARISE BETWEEN THE FIELD CONDITIONS VERIFIED AND PROPOSED CONSTRUCTION,OR IF THERE IS A MIN.LOT AREA 25,000 SF 23,561 SF NO CHANGE EXSTG ONIAi p,F- CONFLICT BETWEEN ANY REGULATIONS OR MUNICIPAL REQUIREMENTS AND THE PROPOSED PLANS,THE CONTRACTOR MAX.BLDG.HEIGHT 45 FT 20 FTt 20 FTt NONE SHALL NOTIFY THE OWNER'S REPRESENTATIVE PRIOR TO CONTINUANCE OF THE WORK. MIN,LOT FRONTAGE 125 FT(150 FT) 390.81 FT NO CHANGE NONE 5. PROPOSED WORK INCLUDES: FRONT YARD SETBACK 25 FT(100 FT) 14.6 FTt 10.0 FTt 90 FEET BFRRr ST 5,1. PROPERLY CLOSE AND REMOVE EXSTG SEPTIC SYSTEM - 5,2. CONSTRUCT NEW 1,999 SF BUILDING FOR C-STORE RELOCATION SIDE YARD SETBACK 25 FT(40 FT) 76 FTt 3.0 FT 37FEET '. 5.3. RELOCATE,UPGRADE,INSTALL NEW UTILITIES INCLUDING TIE TO MUNICIPAL SEWER AS NECESSARY REAR YARD SETBACK 36 FT(5OFT) 6 FTt 4 FTt 46 FEET 500 i00° eq- 5.4. DEMO EXISTING C-STORE BUILDING FLOOR AREA RATIO(MAX) WA — 8,6% NONE VICINITY MAP ® 5.5. INSTALL TWO FUEL DISPENSERS IN LOCATION OF EXISTING STORE GRAPHIC SCALE-FT 5.6. EXTEND EXISTING CANOPY OVER NEW FUELING ISLANDS AND EXTEND FUELING PIPING TO NEW DISPENSERS LOT COVERAGE AREA(%) 35"/0 3.3% 8,5% NONE REFERENCE-N.ANDOVER GIS 5.7. EXTEND FIRE SUPPRESSION SYSTEM TO INCLUDE NEW FUELING ISLANDS MIN OPEN SPACE I%) WA NONE 5.8. TIE LOCAL FIRE ALARM PANEL TO RADIO BOX PER N.ANDOVER FD SPEC AND REQMNTS MAX DRIVEWAY WIDTH 30 FT 139.5 FT 89.5 FT 59.5 FT DATE OF FILING: 5.9. MINOR CHANGES TO EXSTG DRIVEWAYS AND R.O.W.CURBING SUBJECT TO APPROVALS OF CITY DPW AND MA DOT PARKING SPACES(MIN 9,0'%18') - 5.10. CONSTRUCT NEW PEDESTRIAN SIDEWALK IN R.O.W�PER DPW STANDARDS 5.I. INSTALL NEW SCREENED TRASH ENCLOSURE AND LANDSCAPE SCREENING RETAIL- per ks,GFA 7 a 8 NONE DATE OF PUBLIC HEARING: 5.12. REMOVE PAVEMENT ENCROACHING ON ABUTTING LOT 5.13. REPLACE ALL DISTURBED PAVING TO MATCH EXISTING.NO CHANGE TO GRADING DATE OF APPROVAL: 5.14. NO CHANGE TO UG TANKS.NO CHANGE TO NORTHERN FUEL DISPENSING AREA OR CANOPY REFERENCE: BLDG COMMISSIONER DENIAL AND ZONING BYLAW REVIEW FORM,PERMIT#35806,DATED 6123/18 TOWN OF NORTH ANDOVER ZONING BYLAW 1972,AMENDED MAY 10,2016 APPROVED BY THE NORTH ANDOVER ZONING BOARD OF APPEALS: J.C.ENCER ~—ABUTTER REMOVEGEXiSTRIG P�( CEDAR COMMONWEALTH NEW SCREENED -- FENCING tp-- '-` ' ^ Of MA TRASH EICLOSURE INCLUDING GAS `—"— s, ,1 iP -OR{ E_,+ EMOCY GENERATOR f� ` ADD PAVNGREMOVE ALL ANO 3 as.ss - STRIPING FOR ADDM04AL O+ t A— \ C ENCROACHING PAVEMENT PARKING AREA LOCATION F LEACH OF LEACH FIELD TO BE REMOVED —N 28'08 pm.. ; }-.l'�Y A# ? 3634360 TANOa >t DONAILD JOHNSiON z j I EXSTG UG STORAGE - I NS TO REMAIN O141 EKSTG EDGE OF ' � EXSTG FREESTANDING 15K D PAVEMENT ID SIGN TO REMAIN s OI • I,s i I Iaa. EXPOSED 3 �f T - NEW TIE TO _ I `20:0' 32G'9 C10_OO(1 LEDGE COMMONWEALTH y g �"-= MUNICIPAL SEWER I o Ia19 _ _ _ �T EXSTG CANOPY AND 99 g Of MA -I „O q Igq,lb ,J9 ISLAND TO REMAIN --4 -_0 6 e <, ,a5,, LANDSCAPE AREA TOE 61 E%STC CANOPY AND THREE - 'i ISLANDS TO REMAIN REMAIN EXSTG DRAIN ;) -• 4D0' GO.5' ¢� �YtO},AL..-� ,} SWALEig.q}•:; i 15.5' 36.5 -._-- —� REDUCE 364.38' S 36'S9'48'E EXTEND 'REDUCE DRIVEWAY Ix ADD CONCRETE e. : e ,1 a A.L.PRIME ENERGY _ UTILITY , LANDSCAPE W,DTH BY 30% _ DRIVEWAY _ unuTv UTILitt WIDTH BY POLE Sr AREA POLE$s IN ����� PEDESTRIAN wALK POLE 3uR /°f E^ a CONSULTANT,INC. u(f I� 18 LARK AVENUE CUT EXSTG WATER SVC 9986 IIS gy SAUGUS MA 01906 AND STUB TO NEW METER I6 N (7611R46-0201 LOCATION I' Z xo,emamxe e ¢' 1 628.59'46'E ,52 �a6C0 O 1,,60 6D 9 6 „b6e 177.6D.Kl Al PRIME SITE#108 'I TURNPIKE ROAD (ROUTE 114) DO N. ANDOVER, MA -----•---------------------------------------------------------------------- 1725 TURNPIKE ST o ar SITE LAYOUT JOHN OA'ARNIM JOHN C./iARNUM '�OHNESTfiE"NM PROPOSED IMPROVEMENTS ESTATE ESTATE PRIME GAS STATION&C—STORE 10 40 LAYOUT OF PROPOSED SITE IMPROVEMENTS ®� GRAPHIC SCALE-FT 5 108-018.OI NANDOVER AS NOTED REFERENCE-PROP LINES AND OTHER SITE INFO SHOWN ON THIS DWG TAKEN FROM EXSTG SEE GRAPHIC SCALE AG C�1 O CONDITIONS PLAN FOR A.L.PRIME ENERGY CONSULTANT,INC.,BY LANDMARK ENGINEERING& R.111—E SURVEY,INC.583 CHESTNUT ST,LYNN MA 01904,781-592-7010,11/302016,SCALE 1'=20' m 2018-07-02 ifleV NONE ` NONE n/f �— REMOVE EXISTING n f J.C. BENGER ABUTTER BUILDING / CEDAR COMMONWEALTH 4s,7o FENCING ti D.S SEE ISLAND OF MA NEW SCREENED 3aso—• 37 TRASH ENCLOSURE " W I DISPENSER SUMP AND 5.53 145.-�� INCLUDING GAS 1� 91 v R ," 1' i ADD PAVING AND EMGCY GENERATORr , i .� 143,55 ag91 \ REMOVE ALL STRIPING FOR ADDITIONAL / __ PARKING AREA Oz _ ENCROACHING PAVEMENT APPROX LOCATION F LEACH FIELD TO PT 145A BE REMOVED c�' ___, _ ' aSaj --- -2808 -- 1a �9--- ---"—� - — — --- - -- --- r A 36.,,. � C'tx - LAN _4 �V 145,24 4.97 I _EX _N D CANOPY�L AND FIR 363.4 -� DONAfLD N� ( i �� - SU,PR�--S 0O SYSTEM ' ' � 7 -�145.35 145.15 I EXSTG UG STORAGE JOHNSTON o� j ; 1, —— (n ; �' �� o 145.2 � O TANKS TO REMAIN (n 3 i .� i i i 14.45 V� 3 --- --- .---- 145.z8 6-- 44.87 144 i l 'i �i�`1 I 0 EXSTG FREESTANDING _ I / 4508 _15K— ID SIGN TO REMAIN—, QD o ��JU O� 144.99 -- 0 0 2U 0' 32,0' °p 10K NEW TIE TO i ;, ---- MUNICIPAL SEWER E ---/ O L— EXSTG CANOPY AND ,j-- 144,93 --- -------- — ISLAND TO REMAIN \ - EXSTG CANOPY AND -HREE4489 laa.76 n\ 144.79 v.-,+ ISLANDS TO REMAIN + EXSTG DRAIN 15.5' 36,5' 40,0' 89,5'— } SWALE " a3.e1 143.63; REDUCE 364,38' S 36°59'48" E \\ EXTEND REDUCE DRIVEWAY 143.5 'f DRIVEWAY UTILITY LANDSCAPE WIDTH BY 30% UTILITv WIDTH BY POLE AREA ADD CONCRETE 30% PEDESTRIAN WALK POLE 3.8 44.07 14388 x 144.07 144.11 144.86 U Aq, 43.s6 CUT EXSTG WATER SVC f# AND STUB TO NEW METER sra„ ` LOCATION N , i S 36°59'48"E 143.19 181+41.29 181 �'� 144.20 180 145.21 ILF COSUILTANTENO� 18 LARK AVENUE TURNPIKE ROAD ( ROUTE 114 ) N �.e.9 SAUGU46 A(ll 66 1 (]01)2S MA01 ""a..w°PE66 Al PRIME SITE#108 N. ANDOVER, MA 20 40 � 1725 TURNPIKE ST LAYOUT OF PROPOSED SITE IMPROVEMENTS zo a GRAPHIC SCALE FT z SITE LAYOUT SEE GRAPHIC SCALE ENLARGED PARTIAL SITE PROPOSEDIMPROVEMENTS PRIME GAS STATION&C-STORE F108"8-"N ANDOVER ". AS NOTED AG C-1.1 2018-07-02 NONE T. NONE 29.0' 33.8' KLLOW ACM YELLOW ACM lG N X CANOPY FASCIA CANOPY FASCIA u TWO NEW j j a`2 NEW CANOPY (n SYSTEM TO CO1fR ENTIRE CANOPY COLUMNS FUELING AREA COLUMNS i 30.0' 20.0' £ x 1!- l TYPICAL j) jj OI6P£NSER SICNAGE NORTH CANOPY ELEVATION IT WEST WEST CANOPY ELEVATION e SEE GRAPHIC SCALE SEE GRAPHIC SCALE e Ti -- 3 YELLOW AC. G CANOPY FASCIA w _ g CANOPYw f II fONALy\ COLUMNS E A.L.PRIME ENERGY 30.0' D ° � CONSULTANT,INC. r ���LILJL/ 18 LARK AVENUE r jl .;eisr SAUGUS MH O1806 (T61)246-0207 Z naeo.n°°a D . �.Al PRIME SITE#108 �(I w N. ANDOVER, MA 1725 TURNPIKE ST SOUTH CANOPY ELEVATION o SEE GRAPHIC SCALE CANOPY ELEVS PROPOSEDIMPROVEMENTS PRIME GAS STATION&C-STORE a �e 108.018-01 NANDOVER " AS NOTED AG A-3.0 2018-07-02 NONE ` NONE