Loading...
HomeMy WebLinkAbout- Plans - 1725 TURNPIKE STREET 10/31/2018 GENERAL NOTES ZONING INFORMATION-MAP 107.E BLOCK 0056 LOT 0.0(PARCEL 210/107.B-0056-0000.0) 1. THE CONTRACTOR WILL BE RESPONSIBLE FOR PERMITS FROM THE LOCAL FIRE MARSHAL'S OFFICE AND TRADE OR BLDG PERMITS FROM THE LOCAL BLDG DEPTAND ALL ASSOCIATED TESTING AND INSPECTION ZONE:GENERAL BUSINESS y REQUIREMENTS. (NOT IN WATERSHED OR HISTORICAL OVERLAY DISTRICTS) LUv UR gT. 2. THE CONTRACTOR SHALL CONTACT DIG-SAFE PRIOR TO ANY CONSTRUCTION EXCAVATION(811 IN MA) USES-SECTION 1.131: 3. THE CONTRACTOR SHALL FIELD VERIFY THE FOLLOWING ITEMS PRIOR TO CONSTRUCTION: 1.RETAIL STORE-PERMITTED P 3.1. LOCATION OF PROPERTY BOUNDARIES,EASEMENTS,AND RIGHT OF WAYS. 4.AUTOMOBILE FILLING STATION-PERMITTED(AS MODIFIED 8Y SECTION 8.2) SITE[\µ'6,0 3.2. LOCATIONS OF STRUCTURES,BUILDINGS,AND DRIVEWAYS 23�1'fF 33. LOCATIONS,SIZES,DEPTHS OF EXSTG UG UTILITIES,PIPING,STRUCTURES,TANKS,ETC. REQUIRED EXISTING PROPOSED RQSTD RELIEF 3.4. ALL EXSTG AND PROPOSED CRITICAL ELEVATIONS MIN.IOTAREA 25,000 SF 23,561 SF NO CHANGE EXSTG 4, WHERE CONFLICTS ARISE BETWEEN THE FIELD CONDITIONS VERIFIED AND PROPOSED CONSTRUCTION, -- OT1UL pvE. OR IF THERE IS A CONFLICT BETWEEN ANY REGULATIONS OR MUNICIPAL REQUIREMENTS AND THE MAX.BLDG.HEIGHT 45 FT 20 FTt 24 FTt NONE PROPOSED PLANS,THE CONTRACTOR SHALL NOTIFY THE OWNER'S REPRESENTATIVE PRIOR TO MIN,LOT FRONTAGE j 125 fT(150 FT) 390.81 FT NO CHANGE NONE CONTINUANCE OF THE WORK. FRONT YARD SETBACK 25 FT(100 FT) 14.6 FT3 13.0 FTi 87 FEET BCkRysr- 5. PROPOSED WORK INCLUDES: SIDE YARD SETBACK 25 FT 78 FTt 6,1 FT iB FEET 5.1. PROPERLY CLOSE AND REMOVE EXSTG SEPTIC SYSTEM REAR YARD SETBACK 36 FT(SOFT) 5 FTt 3 FTt 47 FEET R 400 4 5.2. CONSTRUCT NEW 1,805 SF BUILDING FOR C-STORE RELOCATION 5.3. RELOCATE,UPGRADE,INSTALL NEW UTILITIES INCLUDING TIE TO MUNICIPAL SEWER AS NECESSARY FLOOR AREA RATIO(MAX) N/A 8.5% NONE VICINITY MAP ® GRAPHIC SCALE FT 5.4. DEMO EXISTING CSTORE BUILDING LOTCOVERAGEAREA(%) 35% 3.3% 6.8% NONE REFERENCE-N.ANDOVER GIS 5,5. RELOCATE CANOPY AND FUEL DISPENSERS WITH NEW,APPROX 9 TO 11 FEET NORTH MIN OPEN SPACE(°Jo) MA NONE 5.6. INSTALL TWO FUEL DISPENSERS IN LOCATION OF EXISTING STORE a 5.7. EXTEND CANOPY OVER NEW FUELING ISLANDS AND EXTEND FUELING PIPING TO NEW DISPENSERS MAX DRIVEWAY WIDTH 30 FT 13%5 FT 89.5 FT 59.5 FT DATE OF FLUNG: 5.6. REPLACE FIRE SUPPRESSION SYSTEM TO INCLUDE COVERAGE FOR NEW FUELING ISLANDS PARKING SPACES(MIN SOX18`) (1605.3.511000=5.6) 5.9. TIE LOCAL FIRE ALARM PANEL TO RADIO BOX PER N.ANDOVER FD SPEC AND REQMNTS RETAIL-3.5 Per KMGFA 8 8 7 NONE DATE OF PUBLIC HEARING: 5.10. MINOR CHANGES TO EXSTG DRIVEWAYS AND R.O.W.CURBING SUBJECT TO APPROVALS OF CITY DPW AND MA DOT 5.11. CONSTRUCT NEW PEDESTRIAN SIDEWALK IN R.O.W.PER DPW STANDARDS DATE OF APPROVAL: 5.12. INSTALL TWO NEW SCREENED ENCLOSURES,ONE FOR TRASH AND THE OTHER FOR GENERATOR REFERENCE: 5.13. INSTALL LANDSCAPE SCREENING BLDG COMMISSIONER DENIAL AND ZONING BYLAW REVIEW FORM,PERMIT#t35806,DATED 5/23/18 5.14. REMOVE PAVEMENT ENCROACHING ON ABUTTING LOT TOWN OF NORTH ANDOVER ZONING BYLAW 1972,AMENDED MAY 10,2016 APPROVED BY THE NORTH ANDOVER ZONING BOARD OF APPEALS: 5.15. REPLACE ALL DISTURBED PAVING TO MATCH EXISTING.NO CHANGE TO GRADING 5.16. NO CHANGE TO UG TANKS,REPLACE TANK TOP EQUIPMENT AND PIPING AS NECESSARY TO ACCOMODATE FUELING AREA ADDITION AND RELOCATION of J.C.EAGER �-ABUTTER DUIOVE LOINGE%ISTNG of 45 B CEDAR COMMONWEALTH EVERGREEN -=__FENCING --y. rs`U, "' 5t€-- OF MA LANDSCAPING SCREENEp TRASH ADD PAVING AND ENCLOSURE }�1 I<5.551 IT,, REMOVE ALL STRIPING FOR ADDITIONAL i - ENCROACHING PAVEMENT PARKING AREA APPROX LOCATION OF(EACH HELD TO ., - BE REMOVED I t J (^—^36.G' 3 I !t I 30.... �_ >�� » �' L"- -,L � 363.48' I B7 DONALD �� I ..1 33.2'_I� I � - (� -. EXSTG UC STORAGE ° JOHNSTON nm i `i -l„L a I 145 O ° TANKS TO REMAIN - 1 - Q zI O O PAYE��• p § F EXSTG FREESTANDING N49 — -- ` 15X O ID SIGN TO REMAIN ^+ Ins EXPOSED t149.5R NEW TE TO 1 LH �S'--L C10K 00(_P IEOGE COMMONWEALTH { }`< MUNICIPAL SEWER I I O 1 --0 EXSTO CANOPY AND \\\\�)-- OF MA SCREENED ENCLOSURE _ - !— ---- 1++eB la°7s w°.79 ISLAND TO REMAIN \/ ' I O 1454 S FOR CAS EMGCY I I `Py EXSTG CANOPY AND 1HREE n� REMAIN APE AREA TO N GENERATOR -� -i 1.' f 38.5' �+ ISLANDS SHIFTED NORTH 141" _ 38411' S 38`5948 E E%TEND REDUCE DRIVEWAY yy E%STG DRAIN s 1°2 _ REDUCE IM d 1 SWALE POLE 13 307.DRMWAY UTILITY r AREA WIDTH 8Y 30R - aqa IW A.L.PRIME ENERGY ra UTILITY I ADD CONCRETE UiililY a WIDTH BY POLE —a—a—a—a— POLE i8 w ZA w PEDESTRIAN WALK °°i�—a—x—x —a—a— —x—a—a F i of CONSULTANT,INC. —a—six.—x—x I 'lx-J� se s I a 1 1°°a'r 1° t°4as ---. 155.62 I 11 CUT EXSTG WATER SVC I°s.+� 18 LARK AVENUE ig oEnergy SAUGUS MA 01908 I AND STUB TO NEW ME1ER f (781)246-0201 1 11 LOCATION j _ N 0 R z r—TA.1— ' 1 SJB'5B'48'E I<so 14ce 177.so.9e 0 Al PRIME SITE#108 -IB m1i-2B 4,1 14z 14o Ioa 17B 5 U. TURNPIKE ROAD (ROUTE 114) ; N. ANDOVER, MA ° W 1725 TURNPIKE ST SITE LAYOUT JOHN C./FARNUM °/ JOHN T'FARNUM PROPOSED IMPROVEMENTS ESTATE JOHN C FARNUM ESTATE PRIME GAS STATION&C—STORE ESTA E u a ° LAYOUT OF PROPOSED SITE IMPROVEMENTS ®} p�GRAPIC SCALE FT 108-018-01 NANDOVER ET AS NOTED REFERENCE-PROP LINES AND OTHER SITE INFO SHOWN ON THIS DWG TAKEN FROM EXSTG SEE GRAPHIC SCALE AG ��1 .O CONDITIONS PLAN FOR Al,PRIME ENERGY CONSULTANT,INC.,BY LANDMARK ENGINEERING& SURVEY,INC.583 CHESTNUT ST,LYNN MA 01004,781-592-7016,1 113 0 2 01 6,SCALE 1-20' or ogre 2018-07.02 LflE2 2 10/30/18 o n/f ABUTTER REMOVE EXISTING n/f Q J.C. BENGER CEDAR COMMONWEALTH _ Z` BUILDING EVERGREEN as.7o FENCING E R IS �ySD, 37 N ; X ISLAND OF MA LANDSCAPING L`��3 - - 5.53 -.- ,r' � yr � '�� ar `I`'f}' �'; . - AND f2 W SCREENED TRASH t MP f 1q , ADD PAVING AND ENCLOSURES 145.55 ; 5.9t ENCROACHING PAVEMENT STRIPING PARKING ADDITIONAL REMOVE ALL APPROX LOCATION --- --sss T= OF LEACH FIELD TO - 36,01 01 - 145.4 BE REMOVED i ------ I 4so&• — L 1 , as.4� ��Og'3O--W ias.za- - - 7 4�03 ro � '�' OPY N FIRE 363.46" 4.9 t' �- SUPIRE�S,u S YST-cM :DN f Nd �- 33,2' 145.35 145,15 ALD �� i_1 �. EXSTG UG STORAGE u __ —— STON o� C1 , -O- I o 4sz � O TANKS TO REMAIN I r - ] —1 - _____ —.L-4 8 6 44.87 -- --_�- -� - O 144 7 1 �---� EXSTG FREESTANDING (�15K_—— ID SIGN TO REMAIN - i O as oa F E I — �� o� 1 144.99 445 --- NEW TIE TO i a L.q y °p 10K O O F MUNICIPAL SEWER L—— _ EXSTG CANOPY AND -,----- J EENED ENCLOSURE � _ �, � �- 14489 144.76 b aa.79 ISLAND TO REMAIN FOR GAS EMGCY �! 0 EXSTG CANOPY AND THREE u'+ I GENERATOR ° 1 ` ISLANDS SHIFTED NORTH 1 �� 36,5' 40.0' 89.5'— _ 316.431_ i� -- — -- e-� 14321 1a�63 . '` 364.38' S 36°59'48" E EXSTG DRAIN REDUCE EXTEND REDUCE DRIVEWAY SCALE a3.5 DRIVEWAY UTILITY { LANDSCAPE If WIDTH BY 30% UTILITY WIDTH BY POLE Y AREA ADD CONCRETE POLE 30% - PEDESTRIAN WALK 3 3'8 44.07 " 143.56 1 143.88 ; 144.07 14411 144.86 CUT EXSTG WATER SVC AND STUB TO NEW METER ` LOCATION + + + S 36°59'48"E 143.19 181+41.29 181 " 144.20 180 145.21 9. o IM A.L.PRIME ENERGY w p CO8SLARKA ENUENC. T U R N P I K E ROAD ( ROUTE 1 14 ) SAUGUS MA 01808 9Y UGUS MA w = ° P Al PRIME SITE#108 w w N. ANDOVER, MA 20 ao w 1725 TURNPIKE ST LAYOUT OF PROPOSED SITE IMPROVEMENTS 20 4 GRAPHIC SCALE - FT SITE LAYOUT a m a SEE GRAPHIC SCALE ENLARGED PARTIAL SITE PROPOSEDIMPROVEMENTS PRIME GAS STATION&C-STORE a 108-018-01 N ANOOVER c. AS NOTED AG C-1 .1 1N OAT 2018-07-02 2 10/30/18 53A' T— -------------------------------------------- I I I ELEcramaL �� I fo a OFFICE/ 9 DOOR 2 DOOR STORAGE COOLER FREEZER I 30,5' ICE MECH/ - STORAGE i I 1 o I U) 1 __ i A I i L07iERY i I I i •__>_______________________..__. 5.0' - _-_-- 30.0' z I ----� o w I i n k j i-----_-� OPEN N N Q CASE I N Q I 1--8 00� I TRANSACTION I DRAWER I ( I s L----------_— I ( EDGE Of ft00f OVERHANG ---t--t---- — — -- ---1 -------------------j 1 I � CAT EEETENTRY GRAPHIC SCALE- � ?� &�i� FLOOR PLAN A.L.PRIME ENERGY CONSULTANT,INC. SEE GRAPHIC SCALE u� ISLARKAVENUE a SAUGUS MA 01906 N 9Y (781)246-0201 i 0 .w.c*waves ° o Al PRIME SITE#108 > N. ANDOVER, MA 1725 TURNPIKE ST FLOOR PLAN PROPOSEDIMPROVEMENTS PRIME GAS STATION&C—STORE o a e 108-018.01 N ANDOVER E1 " AS NOTED AG A_1 .O 1X are 2018-07.02 T"� 2 10/30/18 r—————————— — �— — I I I I i ARC ASPHALT RAL I ( ARG RAL ASPHALT -----� ' SHINGLES i SHINGLES O I Y 0 o M �� \ M�'f• NARDIPLA YMITE NK /� L CLAPBOARD SIDING ❑❑ \ / / ❑❑ El]30.2' � 53.0' � EAST BUILDING ELEVATION GRAPHT• D SALE_FT D NORTH BUILDING ELEVATION z f CRAPHB SEE GRAPHIC SCALE SEE GRAPHIC SCALE --------- I I =77TFM ARCH17ECNRAL ARCHI7ECNRAL ASPHALT InAV�A( i LT �� u F SHINGLES �� H 1 �i WHITE '^ VSHITE - HARDIPLANK A.L.PRIME ENERGY HARaPLANK CLAPWARo - z o A D(�a( j (01 CONSULTANT,INC. CLAPBOARD IIIIIIIII[��� SIDING a of u (�U(�`G 16 LARK AVENUE 5 rc E SAUGUS MA01906 pw u N 9Y IT91)246-0201 P Z Z sswem nwncss o ° Al PRIME SITE#108 N M ANDOVER, MA w 1725 TURNPIKE ST WEST BUILDING ELEVATION GRAPHS SOUTH BUILDING ELEVATION GRAPHe SEE GRAPHIC SCALE SEE GRAPHIC SCALE a a u B L D G E L E VS w e PROPOSED IMPROVEMENTS PRIME GAS STATION&C-STORE oho r 108.018.01 N ANDOVER " AS NOTED AG A-2.0 woere 2018-07-02 rc Tll 2 e 10/30/18 ice-- - 29.0' � � 36.1' y YELLOW ACM EXISTING CANOPY BEHIND YELLOW ACM W CANOPY FASCIA 9.S' ADDITION MOVED NORTHERLY f A 9.5 CANOPY FASCIA IPAO FEET L7 FTWO NEW EXTEND FIRE SUPPAESSION TWO NEW CANOPY y SYSTEM TO CD ENTIRE CANOPY COLUMNS FUELING AREA COLUMNS W 30.0' zoo• lL RELOCATED EXSTG TYPICAL X DISPENSER DISPENSER U DISPENSER W LOCATION LOCATION 1- SIONAGE ti i, rl NORTH CANOPY ELEVATION 2 ,�i�'—fie WEST CANOPY ELEVATION 9 4 SEE GRAPHIC SCALE 2 i 'GRAPHIC SCALE SEE GRAPHIC SCALE 2910• -+ YELLOW ACM CANOPY FASCIA X x 9 TWO NEW CANOPY f a COLUMNS R w � A.L.PRIME ENERGY 30.0 `" e D.��Ul1tJlJ CONSULTANT INC. `lF1 uueuGy 18LARKAVENUE o ul SAUGUS MA 01906 W _ (781)246A201 lz Z ¢ Al PRIME SITE#108 > N. ANDOVER, MA 1725 TURNPIKE ST SOUTH CANOPY ELEVATION D g CANOPY ELEVS SEEEE GRAPHIC SCALE m PROPOSEDIMPROVEMENTS PRIME GAS STATION&C-STORE 108-018-Ot N ANOGVER AS NOTED AG A-3.0 2018-07-02 r"`" 2 ` 10/30/18