Loading...
HomeMy WebLinkAbout- Consultant Review - 2 BANNAN DRIVE 2/7/2019 1, I North Andover Health Department Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 2 Bannan Drive MAP: 38 LOT: 104 INSTALLER: James Kellett DESIGNER: Thorsen Akerley, R.S. Williams & Sparages, LLC PLAN DATE: final revision date of August 21, 2018 BOH APPROVAL DATE ON PLAN: 9/20/2018 INSPECTIONS TANK INSPECTION: 1/11/19 DATE OF BED BOTTOM INSPECTION: - Greg Hochmuth DATE OF FINAL CONSTRUCTION INSPECTION: 1/11/19 DATE OF FINAL GRADE INSPECTION: SITE CONDITIONS Contractor reports any changes to design plan Existing septic tank properly abandoned ® Internal plumbing all to one building sewer ® Topography not appreciably altered Comments: SEPTIC TANK ® Building sewer in continuous grade, on compacted firm base ® Cleanouts per plan ® Bottom of tank hole has 6" stone base ® Weep hole plugged ® 1500 gallon tank has been installed H-10 loading ® Monolithic tank construction ® Water tightness of tank has been achieved by visual testing ® Inlet tee installed, centered under access port j Outlet tee installed, centered under access port (gas baffle/effluent filter) inch cover to within 6" of finish grade installed over one access port ❑ Hydraulic cement around inlet & outlet Comments: Neoprene boots used instead of hydraulic cement. DISTRIBUTION-BOX Installed on stable stone base H-20 D-Box ❑ Inlet tee (if pumped or >0.08'/foot) Z Hydraulic cement around inlet & outlets Z Observed even distribution M Speed levelers provided (not required) Z Schedule 40 PVC Pipe Comments: SOIL ABSORPTION SYSTEM (General) Z Bottom of SAS excavated down to C soil layer, as provided on plan Z Size of SAS excavated as per plan ❑ Title 5 sand installed, if specified on plan ❑ 40 Mil HIDPE barrier installed ❑ Laterals installed and ends connected to header (and vented if impervious material above) ❑ Elevations of laterals and chambers installed as on approved plan ❑ Retaining wall (boulder/ concrete /timber/ block) ❑ Final cover as per plan Comments: 55'D x 40" D 68x24' FINAL GRADE ❑ Loamed ❑ Seeded —to be done per contract and letter from Kellett Z Cover per plan Comments: DOCUMENTS NEEDED Certification of Installation Form submitted By engineer and signed and dated by Engineer and installer As-Built Plan BM = 103.18 HR = HI = 106.71 SYSTEM ELEVATIONS -------------- ROD AS-BLT INVERT DESIGN INVERT ELEVATION ELEV ELEV Benchmark 3.53 Building Sewer OUT 4.89 101.47 100.91 Septic Tank IN 5.61 100.75 100.68 Septic Tank OUT 5.86 100.5_----------- 100.43 Distribution Box IN 6.97 99.39 99.31 Distribution Box OUT 7.15 99.22 99.19 Lateral 1 TOP 7.15 99.21 99.19 Lateral I INVERT 7.29 99.07 99.05 Lateral 2 TOP 7.15 99.21 99.19 Lateral 2 INVERT 7.29 99.07 99.05 Lateral 3 TOP 7.15 99.21 99.19 Lateral 3 INVERT 7.29 99.07 99.05 Lateral 4 TOP 7.15 99.21 99.19 ------------ Lateral 4 INVERT 7.28 99.08 99,05 Lateral 5 TOP 7.16 99.2 99.19 Lateral 5 INVERT 7.29 99.07 99.05 ----------- ----------------------- ......----------- .s aa I' 41VId� ,. IIII � Y i f OFFICE (781)-599-79 4 FAX (781)-842-0260 Email—jim.kecorp(,,)gmail,com www.kellettexcavating.com Board ofNorth Andover Health Department 1, James Kellett of Kellett Excavating I.LC am writing;this letter to guarantee that Kellett Excavating will be back to 2 Bannan Dr, to finish the complete job as of grading, loaming, and hydroseeding as specified in the detailed contract. If weather cooperates our estimated scheduling dates would be sometime in. April of'2019 but not held to, due to inclement weather. Best regards, times R. Kellett, l'rdsident Kellett Excavating, LLC ym I