Loading...
HomeMy WebLinkAbout20180403 Engineering Review Correspondence - Consultant Review - 128 DALE STREET 4/3/2018 3/21/2018 Town of North Andover Mail-Fwd:Fw:Building Permit#30710-128 Dale Street NoRT DYER Massachus�* Monica Gregoire<mgregoire@northandoverma.gov> Fwd: Fw: Building Permit #30710 - 128 Dale Street John Borgesi <jborgesi@northandoverma.gov> Fri, Mar 16, 2018 at 11:49 AM To: Monica Gregoire <mgregoire@northandoverma.gov> Monica, I just saw you were looking for comments on this project on the 9th. I imagine Jean shared my comments with you (see email/marked up plan below). Sorry for the delay in responding on this. Thanks! -John John J. Borgesi, P.E. Town Engineer Department of Public Works Town of North Andover 384 Osgood Street North Andover, MA 01845 Phone: 978.685.0950 Fax: 978.688.9573 ----------Forwarded message---------- From:John Borgesi <jborgesi@northandoverma.gov> Date:Thu, Feb 8, 2018 at 12:04 PM Subject: Re: Fw: Building Permit#30710- 128 Dale Street To:Jean Enright<jen rig ht@northandoverma.gov> Cc: smason_5@yahoo.com Jean, I wanted to follow-up with a more formal response on my review of the 128 Dale Street proposed garage addition. Based on my review I have confirmed the square footage and I offer the following comments regarding edits to the proposed site plan: 1. A note shall be added to the plan indicating the area where the existing concrete driveway is located is to be removed and the area restored with pervious material (loam-seed,shrubbery, landscaping, etc.). 2. An infiltration trench shall be added along the edge of the proposed driveway(see attached pdf)to collect the stormwater runoff and allow the runoff to infiltrate into the ground surface. A detail for the proposed infiltration trench shall be added to the plan set. 3. Per our driveway policy,the pavement elevation at the driveway shall be at least 4 inches below the edge of the existing roadway's pavement at a distance of 6 feet into the roadway shoulder from that edge of the pavement. Spot grades shall be added to the site plan to identify these low spots for the driveway to contain the stormwater on-site. 4. A typical driveway detail shall be added to the plan set depicting at a minimum the proposed driveway,the minimum slope towards the infiltration trench, and the infiltration trench. Attached is a scan of the site plan that I marked up showing the proposed infiltration trench, low spot, and note regarding the restoration of the old driveway area in red. If you have any questions please do not hesitate to give me a call. Thank you! -John John J. Borgesi, P.E. Town Engineer Department of Public Works Town of North Andover 384 Osgood Street North Andover, MA 01845 https://mail.google.comlmail/u/0/?ui=2&ik=dadd 1872e7&jsver=-RQ5MMKYKko.en.&view=pt&msg=1622f80c9f48dOc,4&q=128&search=query&siml=16... 1/8 3/21/2018 Town of North Andover Mail-Fwd:Fw:Building Permit#30710-128 Dale Street Phone: 978.685.0950 Fax: 978.688.9573 On Sun, Feb 4, 2018 at 9:27 AM, Jean Enright<jen rig ht@northa ndoverma.gov>wrote: Thanks, John. I appreciate your quick response. I will not be in the office tomorrow, but I have provided an overview of your comments to the applicant. Jean On Fri, Feb 2, 2018 at 12:51 PM, John Borgesi <jborgesi@northandoverma.gov>wrote: Jean, I did take a look and we can go over on Monday. The proposed modifications seem reasonable with regards to stormwater but I would have some comments on what I would like to see done with respect to the driveway similar to what we have required at other homes located within the Watershed district(ie stone infiltration trench installed along driveway edge, low spot at end of driveway to keep stormwater on site and off of right of way, etc.). I also would want to confirm the square footage calculations to confirm the area of impervious is not increasing as stated. Lets talk on Monday. Thanks! -John John J. Borgesi, P.E. Town Engineer Department of Public Works Town of North Andover 384 Osgood Street North Andover, MA 01845 Phone: 978.685.0950 Fax: 978.688.9573 On Fri, Feb 2,2018 at 11:17 AM, Jean Enright<jenright@northandoverma.gov>wrote: Hi John, You may recall that we discussed this project about a month ago to determine if you would be willing to provide the stormwater review as opposed to our outside consult due to the size and nature of the project. Since you graciously(!)agreed to do it,would you mind taking a look at the email below and attached plan and let me know if you can provide a"sense"as to whether you believe the stormwater management approach is viable. Thank you. If you would like to discuss please let me know.Thank you Jean ----------Forwarded message---------- From: Steven Mason <smason_5@yahoo.com> Date: Thu, Feb 1, 2018 at 11:15 PM Subject: Re: Fw: Building Permit#30710-128 Dale Street To: Jean Enright<jenright@northandoverma.gov> Hi Jean - I'll be going in front of the ZBA again at the February meeting and was wondering if I could get some preliminary feedback on my updated plans from Mr. Borgesi and yourself. The attached plot plan shows the new layout. https:/Imail.google.comlmail/u/0/?ui=2&ik=dadd 1872e7&jsver=-RQ5MMKYKko.en.&view=pt&msg=1622f80c9f48dOc4&q=128&search=query&siml=16... 2/8 3/21/2018 Town of North Andover Mail-Fwd:Fw:,Building Permit#30710-128 Dale Street The current house has an existing driveway that covers approximately 1700 sq. ft. which is located within 30 feet of a wetland. The proposal includes removing this impervious surface and replacing it with landscaping. The proposed new construction would add approximately 876 sq. ft. of clean roof runoff(438 sq. ft. directed via downspouts to pervious lawn area at the rear of the house and 438 sq. ft. directed via downspouts to pervious landscaped area at the front of the house) and approximately 667 sq. ft. of driveway that is outside the 100 foot buffer zone. The driveway will be graded such that the runoff is directed to pervious areas where vegetation can provide filtration. f The removal of the existing driveway results in improved storm water management as the proposed construction results in an additional area of almost 5000 square feet for filtration of runoff from the proposed driveway. Even though the proposed construction has essentially the same impervious area, more than half of it results from clean roof runoff. Finally, note 5 on the submitted plot plan developed by JM Associates states: "It is the professional opinion of this firm 1 that there will not be any significant degradation in the quantity or quality of water in or entering Lake Cochichewick." The proposed construction in conjunction with the removal of the existing driveway will reduce the impact of stormwater runoff in the watershed protection district. I'm not looking for a commitment on your part, but rather of sense of whether or not the plan as put forth is reasonable with respect to stormwater management such that the ZBA can feel comfortable granting the variance for construction in the Watershed District knowing that a mutually agreeable solution can be achieved with the Planning Board. Please let me know your thoughts. Thanks for your help. Steve Mason 128 Dale Street 978-809-2900 i From: Jean Enright<jenright@northandoverma.gov> To: Steven Mason<smason_5@yahoo.com> Sent: Saturday, December 2, 2017 12:17 PM Subject: Re: Fw: Building Permit#30710- 128 Dale Street Hi Steven, have had some time to review your narrative and plan. I also spoke with John Borgesi and he has agreed to provide the stormwater review should your project proceed to a Watershed Protection District permit filing. In review of your plan, I do have a few questions/comments that I would like to discuss with you. Would you please call me when you have time. If { possible, would you please review Zoning Bylaw Section 4.136 (pages 49-57) prior to calling. The Bylaw can be found on the Planning Department website. https://mail.google.com/mail/u/0/?ui=2&ik=dadd 1872e7&jsver=-RQ5MMKYKko.en.&view=pt&msg=1622f8Oc9f48dOc4&q=128&search=query&siml=16... 318 3/21/2018 Town mNorth Andover Mail-pwd:Fw:Building Permit#3071u-128Dale Street , Jean Enright Planning [)iReCtO[ 078-688-9533 []O Thu, Nov 30' 2O17Gt1:15 PM, Steven Mason <SD1G hOO.CDDl> VV[8tG: Hi Jean - I'll he submitting o request for variance tOthe ZBA. Attached iGa plan showing the proposed work as well as the narrative I'll be including with the request. Because I also have to request a WSP, the PE has indicated on note 5 of the plan that there will not be any significant degradation of the quality or quantity of water in or entering Lake Cochichewick. Removal of the existing driveway and downspout locations are discussed in the narrative. Because the plan includes essentially the same amount of impervious area as exists currently with the improvement that the location of the new area is outside the 1OO' buffer zone, will any additional reviews beneeded bVGO outside consultant? Will | | need to C[8@t8 8 new narrative for the VVSP n8qU8S[7 Is there @ submittal Ch8CWiSt | ' available for metO review? Thanks, Steve Mason \ 128 Dale Street 978-809-2908 From: Jean Enright <je n rig ht@0o[thBOdOve[Dl8.gQV> To: Steven Mason <sRl85OO 5@V@hQO.CO0> Sent: Tuesday, November 7' 2O1711:17 /\M Subject: Re: Fvx: Building Permit#30710 - 128 [}@|e Street Hi Steve, `&eS' the preference VVOU|d be the further from the VVet|GOdS as possible. If you lot was created prior to 1994 permitting would be required for any construction within 325 of a wetland. j88O OO Sun, Nov 5. 20178t9:38 AM, Steven Mason <S08S0O_5@V8hOo.CO0> wrote: Jean- | have corresponded with Rebecca Oldham iOthe past, but ii looks like the email below got bounced back to me. | filed for Building Permit#3U71O which was rejectedfo[ hxpx:Vmai|.0000|o.00mhnan/u0/?u|=2&ix=^auo1872o7ajuwe=-Ro5MmKvnm,.en.mmmw=pt&mso=1*22f8Ooef48uuo4aq=128auoaoh=q"aryas|m|=16... 08 3/21/2018 Town of North Andover Mail-Fwd:Fw:Building Permit#30710-128 Dale Street Jean Enright Planning Director 978-688-9533 i On Thu, Nov 30, 2017 at 1:15 PM, Steven Mason <smason_5@yahoo.com> wrote: Hi Jean - I'll be submitting a request for variance to the ZBA. Attached is a plan showing the proposed work as well as the narrative I'll be including with the request. Because I also have to request a WSP, the PE has indicated on note 5 of the plan that there will not be any significant degradation of the quality or quantity of water in or entering Lake Cochichewick. Removal of the existing driveway and downspout locations are discussed in the narrative. Because the plan includes essentially the same amount of impervious area as exists currently with the improvement that the location of the new area is outside the 100' buffer zone, will any additional reviews be needed by an outside consultant? Will I need to create a new narrative for the WSP request? Is there a submittal checklist available for me to review? Thanks, Steve Mason 128 Dale Street 978-809-2900 ! From: Jean Enright <jen rig ht@northandoverma.gov> To: Steven Mason <smason_5@yahoo.com> Sent: Tuesday, November 7, 2017 11:17 AM Subject: Re: Fw: Building Permit#30710 - 128 Dale Street Hi Steve, Yes, the preference would be the further from the wetlands as possible. If you lot was created prior to 1994 permitting would be required for any construction within 325 of a wetland. Jean On Sun, Nov 5, 2017 at 9:38 AM, Steven Mason <smason_5@yahoo.com> wrote: Jean- have corresponded with Rebecca Oldham in the past, but it looks like the email below got bounced back to me. I filed for Building Permit#30710 which was rejected for https://mail.google.com/maillu/O/?ui=2&ik=dadd 1872e7&jsver=-RQ5M M KYKko.en.&view-pt&msg=l 622f80c9f48dOc4&q=l28&search=query&siml=16... 4/8 3/21/2018 Town of North Andover Mail-Fwd:Fw:Building Permit#30710-128 Dale Street The current house has an existing driveway that covers approximately 1700 sq. ft. which is located within 30 feet of a wetland. The proposal includes removing this impervious surface and replacing it with landscaping. The proposed new construction would add approximately 876 sq. ft. of clean roof runoff(438 sq. ft. directed via downspouts to pervious lawn area at the rear of the house and 438 sq. ft. directed via downspouts to pervious landscaped area at the front of the house) and approximately 667 sq. ft. of driveway that is outside the 100 foot buffer zone. The driveway will be graded such that the runoff is directed to pervious areas where vegetation can provide filtration. The removal of the existing driveway results in improved storm water management as the proposed construction results in an additional area of almost 5000 square feet for filtration of runoff from the proposed driveway. Even though the proposed construction has essentially the same impervious area, more than half of it results from clean roof runoff. Finally, note 5 on the j submitted plot plan developed by JM Associates states: "it is the professional opinion of this firm that there will not be any significant degradation in the quantity or quality of water in or entering Lake Cochichewick." The proposed construction in conjunction with the removal of the existing driveway will reduce the impact of stormwater runoff in the watershed protection district. I'm not looking for a commitment on your part, but rather of sense of whether or not the plan as put forth is reasonable with respect to stormwater management such that the ZBA can feel comfortable granting the variance for construction in the Watershed District knowing that a mutually agreeable solution can be achieved with the Planning Board. Please let me know your thoughts. Thanks for your help. ! ? Steve Mason j 128 Dale Street 978-809-2900 From: Jean Enright<jenright@northandoverma.gov> To: Steven Mason <smason_5@yahoo.com> Sent: Saturday, December 2, 2017 12:17 PM Subject: Re: Fw: Building Permit#30710- 128 Dale Street Hi Steven, have had some time to review your narrative and plan. I also spoke with John Borgesi and he has agreed to provide the stormwater review should your project proceed to a Watershed Protection District permit filing. In review of your plan, I do have a few questions/comments that I would like to discuss with you. Would you please call me when you have time. If possible, would you please review Zoning Bylaw Section 4.136 (pages 49-57) prior to calling. The Bylaw can be found on the Planning Department website. https://mai1.google.com/mail/u/0/?ui=2&ik=dadd 1872e7&jsver=-RQ5M M KYKko.en.&view=pt&msg=1622f8Oc9f48dOc4&q=128&search=query&siml=16... 3/8 3/21/2018 Town of North Andover Mail-Fwd:Fw:Building Permit#30710-128 Dale Street setback violations, but Rebecca had commented on the property's location in the Watershed district. i Given the location in the Watershed district and the location of the wetlands on my a i property, does planning have a preference on the proposed location of work (i.e., the a farther from the wetlands the better)? i Thanks, Steve ----- Forwarded Message ----- From: Steven Mason <smason_5@yahoo.com> To: Rebecca Oldham <roldham@northandoverma.gov> Sent: Sunday, November 5, 2017 9:20 AM Subject: Re: Building Permit#30710 - 128 Dale Street Rebecca - Given the location in the Watershed district and the location of the wetlands on my property, does planning have a preference on the proposed location of work (i.e., the farther from the wetlands the better)? Thanks, Steve From: Rebecca Oldham <roldham@northandoverma.gov> To: Steven Mason <smason_5@yahoo.com> Sent: Friday, October 6, 2017 11:50 AM Subject: Re: Building Permit#30710 - 128 Dale Street Hi Steve, The legal notice will not be a "duplicate" as you will be requesting a variance from the ZBA and a Watershed Special Permit from the Planning Board. It is all for one project but serve two very different purposes. So the notice cannot be done together. Additionally, the meeting schedules are very different and there is a time requirement for posting the notice and mailing the notice. Planning does not have the authority to approve or deny the setback so, if you receive a variance from the ZBA there is nothing the Planning Board can do to change that ruling. Additionally,the vernal pool and the proximity would need to be discussed with the Conservation Department.As they have their own set of requirements. Attached is the Watershed Protection District bylaw. It has the filing requirements and the review requirements listed. Stormwater is the main focus, as it has the direct impact j to the Lake. However,there are other factors to be considered. 3 You can file concurrently with the Planning Board and ZBA. a Please let me know if you need any additional information or have any questions. https:Hmail.google.com/mail/u/0/?ui=2&ik=dadd 1872e7&jsver=-RQ5MMKYKko.en.&view=pt&msg=1622f80c9f48dOc4&q=128&search=query&siml=16... 5/8 3/21/2018 Town of North Andover Mail-Fwd:Fw:Building Permit#30710-128 Dale Street --Rebecca Rebecca Oldham Staff Planner Planning Department Town of North Andover 120 Main Street North Andover, MA 01845 Phone: 978-688-9535 ext. 48301 Fax: 978-688-9542 Email: roldham@northandoverma.gov Web: northandoverma.gov On Fri, Oct 6, 2017 at 11:32 AM, Steven Mason <smason_5@yahoo.com> wrote: Rebecca - Thanks for reviewing my building permit request#30710. Since I will also have to request a setback variance, will I need to submit duplicate legal notices to the news paper and duplicate notifications to abutters or can it be accomplished together? Also, from the planning perspective, if the ZBA has an issue with the setback would planning be strongly opposed to moving the project to just outside 25 feet of the vernal pool? Those are really my only two options. Other than control of storm water runoff, are there other things 1 should be concerned about? Also, which board does it make more sense to present to first - Planning or ZBA? Thanks for your help, Steve Mason 128 Dale Street 978-809-2900 All email messages and attached content sent from and to this email account are public records unless qualified as an exemption under the Massachusetts Public Records Law. Visit us online at www.northandoverma.gov. Sincerely, https:Hmail.goog le.com/mail/u/0/?ui=2&ik=dadd 1872e7&jsver=-RQ5MMKYKko.en.&view=pt&msg=1622f80c9f48d0c4&q=128&search=query&siml=l 6... 618 3/21u018 Town or North Andover wu -pwu Fn Building Permit#oo710 1oo Dale Street Jean Enright Planning Director lown OT North Andover 120 Main Street ' North Andover, MA 01845 Phone 078.088.9533 - Fax 978.088.8542 Email: jeDrig ht@D0[1h8DdOVe[O18.g0V Web: VNkxN.ToVVDOfNO[th/\OdOV8[cOm [�-id:imoge0U1jpg@U10E8F52.F68A5980 All email messages and attached content sent from and to this email account are public records unless qualified as an exemption under the Massachusetts Public Records Law. Visit uo online atv=vwnvrtxanummnna.eov. | | / ! _ Sincerely, Jean Enright | Planning Dimotor Town of North Andover 120 Main Street North Andover, MA 01845 Phone 978.888.8533 Fax 878.08&8542 Email: jeR[ight@nQrth8OdOv8rDla.gDv Web: VVVNN.ToVVDOfNOrthADdOver.Co0D [:�"id:ima8eOU1jp8@010E0F52.F68A5980 All email messages and attached content sent from and to this email account are public records unless qualified as an exemption under the Massachusetts Public Records Law. Visit uo online atwww.vvn»unuo,ennu.eom. _ Ginoana/y, Jean Enright Planning Director | | | Town of North Andover / / / https:Hmail.google.com/mail/u/O/?ui=2&ik=daddl872e7&jsver=-RQ5MMKYKko.en.&view=pt&msg=1622f8Oc9f48dOc4&q=128&search=query&siml=16... 7/8 3/21/2018 Town of North Andover Mail-Fwd:Fw:Building Permit#3071 0-128 Dale Street 120 Main Street North Andover, MA 01845 Phone 978.688.9533 j Fax 978.688.9542 Email: jenright@northandoverma.gov Web: www.TownofNorthAndover.com 'Cid:imageOOI.j pg@010EOF52.F68A5980 Sincerely, "! Jean Enright Planning Director Town of North Andover 120 Main Street North Andover, MA 01845 Phone 978.688.9533 Fax 978.688.9542 Email: jenright@northandoverma.gov Web: www.TownofNorthAndover.com cid:image001.jpg@010EOF52.F68A5980 n Dale Street-128 Site Plan Mark-Up 2-5-18.pdf 616K https:/Imail.google.com/mail/u/0/?ui=2&ik=dadd 1872e7&jsver=-RQ5M MKYKko.en.&view=pt&msg=1622f8Oc9f48dOc4&q=128&search=query&siml=16... 8/8 Subect: Re: Fw: Building Permit#30710- 128 Dale Street Frorin: John Borgesi oborgesi@northandoverma.gov) To: ; jenright@northandoverma.gov; Cc: smason 5@yahoo.com; Date`: Thursday, February 8,2018 12:04 PM Jean, I watated to follow-up with a more formal response on my review of the 128 Dale Street proposed garage addition. Based on my review I have confirmed the square footage and I offer the following comments regarding edits to the proposed site plan: 1. A note shall be added to the plan indicating the area where the existing concrete driveway is located is to be removed and the area restored with pervious material(loam-seed, shrubbery, landscaping, etc.). 2. An infiltration trench shall be added along the edge of the proposed driveway(see attached pdf)to collect the storm-water runoff and allow the runoff to infiltrate into the ground surface. A detail for the proposed infiltration trench shall be added to the plan set. 3. Per our driveway policy,the pavement elevation at the driveway shall be at least 4 inches below the edge of the existing roadway's pavement at a distance of 6 feet into the roadway shoulder from that edge of the pavement. Spot grades shall be added to the site plan to identify these low spots for the driveway to contain the stormwater on-site. 4. A typical driveway detail shall be added to the plan set depicting at a minimum the proposed driveway,the minimum slope towards the infiltration trench,and the infiltration trench. Attached is a scan of the site plan that i marked up showing the proposed infiltration trench,Iow spot,and note regarding the restoration of the old driveway area in red- if you have any questions please do not hesitate to give me a call. Thank you! -John John T.Borgesi,P.E. Town Engineer Department of Public Works Town of North Andover 384 Osgood Street North.Andover,MA 01845 Phone: 978.685.0950 Fax: 978.688.9573 On Sun, Feb 4, 2018 at 9:27 AM, Jean Enright<jenright@northandoverma.gov>wrote: Thanks,John.I appreciate your quick response. I will not be in the office tomorrow,but I have provided an overview of your comments to the applicant. Jean On Fri,Feb 2,2018 at 12:51 PM, John Borgesi<jborgesi@northandoverma.gov>wrote: Jean, I did take a look and we can go over on Monday. The proposed modifications seem reasonable with regards to stormwater but I would have some comments on what I would like to see done with respect to the driveway similar to what we have required at other homes located within the Watershed district(ie stone of Itration trench installed along driveway edge, low spot at end of driveway to keep stormwater on site and off of right of way, etc.). also would want to confirm the square footage calculations to confirm the area of impervious is not increasing as stated. sets talk on Monday. 'thanks! -John John J.Borgesi, P.E. 'own Engineer Department of Public Works 'own of North Andover 3 84 Osgood Street North Andover,MA 01845 Phone: 978.685.0950 Fax: 978.688.9573 On Fri,Feb 2,2018 at 11:17 AM,Jean Enright<jenright@northandoverma.gov>wrote: M John, You may recall that we discussed this project about a month ago to determine if you would be willing to provide the stormwater review as opposed to our outside consult due to the size and nature of the project. Since you graciously(!) agreed to do it,would you mind taking a look at the email below and attached plan and let me know if you can provide a "sense" as to whether you believe the stormwater management approach is viable. Thank you. If you would like to discuss please let me know. Thank you Jean ------Forwarded message---------- From: Steven Mason<smason 5@yahoo.com> Date: Thu,Feb 1, 2018 at 11:15 PM Subject: Re: Fw:Building Permit#30710 - 128 Dale Street To: Jean Enright<jenright@northandoverma.gov> Hi Jean - I'll be going in front of the ZBA again at the February meeting and was wondering if I could get some preliminary feedback on my updated plans from Mr. Borgesi and yourself.The attached plot plan shows the new layout. The current house has an existing driveway that covers approximately 1700 sq.ft..which is located within 30 feet of a wetland.The proposal includes removing this impervious surface and replacing it with landscaping. The proposed new construction would add approximately 876 sq.ft.of clean roof runoff(438 sq.ft.directed via downspouts to pervious lawn area at the rear of the house and 438 sq.ft. directed via downspouts to pervious landscaped area at the front of the house)and approximately 667 sq.ft. of driveway that is outside the 100 foot buffer zone.The driveway will be graded such that the runoff is directed to pervious areas where vegetation can provide filtration. The removal of the existing driveway results in improved storm water management as the proposed construction results in an additional area of almost 5000 square feet for filtration of runoff from the proposed driveway.Even though the proposed construction has essentially the same impervious area,more than half of it results from clean roof runoff.Finally,note 5 on the submitted plot plan developed by JM Associates states: "It is the professional opinion of this firm that there will not be any significant degradation in the quantity or quality of water in or entering Lake Cochichewick."The proposed construction in conjunction with the removal of the existing driveway will reduce the impact of stormwater runoff in the watershed protection district. I'm not looking for a commitment on your part,but rather of sense of whether or not the plan as put forth is reasonable with respect to stormwater management such that the ZBA can feel comfortable granting the variance for construction in the Watershed District knowing that a mutually agreeable solution can be achieved with the Planning Board. Please let me know your thoughts. Thanks for your help. Steve Mason 128 Dale Street 978-809-2900 From: Jean Enright<jenright@northandoverma.gov> To:Steven Mason <smason 5@yahoo.com> Sent: Saturday, December 2,2017 12:17 PM Subject: Re: Fw: Building Permit#30710- 128 Dale Street Hi Steven, 1 have had some time to review your narrative and plan. 1 also spoke with John Borgesi and he has agreed to provide the stormwater review should your project proceed to a Watershed Protection District permit filing. In review of your plan, I do have a few questions/comments that i would like to discuss with you. Would you please call me when you have time. If possible, would you please review Zoning Bylaw Section 4.136 (pages 49-57) prior to calling. The Bylaw can be found on the Planning Department website. Jean Enright Planning Director 978-688-9533 On Thu, Nov 30, 2017 at 1:15 PM, Steven Mason <smason 5@yahoo.com>wrote: Hi Jean - 2/22/2018 Town of North Andover Mail-Re:Planning Meeting- 1VoR4,flA HOVER Massachusetts Monica Gregoire<mgregoire@northandoverma.gov> Re: Planning Meeting - 3 messages Jean Enright <j en rig ht@northandoverma.gov> Tue, Feb 20, 2018 at 8:50 AM To: Steven Mason <smason_5@yahoo.com> Cc: Monica Gregoire<mgregoire@northandoverma.gov> Steve, The Filing Date is Friday, Feb. 23 for a Hearing Date of March 20. If you are not prepared to file by this Friday then we can take the application in on Monday or Tuesday by noon at the latest. I have copied Monica Gregoire, Staff Planner, on this email. Monica will be assisting your with the filing and Board process. Jean On Mon, Feb 19, 2018 at 9:56 PM, Steven Mason <smason_5@yahoo.com>wrote: Hi Jean - My variances were approved by the ZBA for the proposed work at 128 Dale. When's the next planning meeting I'll be able to get on the agenda and what's the cut off for submission? Thanks, Steve Mason 128 Dale Street 978-809-2900 Sincerely, Jean Enright Planning Director Town of North Andover 120 Main Street North Andover, MA 01845 Phone 978.688.9533 Fax 978.688.9542 Email: jenright@northandoverma.gov Web: www.TownofNorthAndover.com cid:image001.jpg@010EOF52.F68A5980 Steven Mason <smason_5@yahoo.com> Thu, Feb 22, 2018 at 7:10 AM Reply-To: Steven Mason <smason_5@yahoo.com> https://mail.google.com/mail/u/0/?ui=2&ik=dadd1872e7&jsver=nwJUtlz7310.en.&view=pt&search=inbox&th=161 bd7dfc50b711 a&sim1=161 b37b24e8cb... 1/2 2/22/2018 Town of North Andover Mail-Re: Planning Meeting- To: Jean Enright<jen rig ht@northandoverma.gov> Cc: Monica Gregoire <mgregoire@northandoverma.gov> Jean - Thanks. I'll have it to you by Tuesday noon at the latest. The application instruction says two full size and three 11 x 17 plans are required. Is this still accurate? Thanks, Steve F From: Jean Enright<jenright@northandoverma.gov> To: Steven Mason <smason_5@yahoo.com> Cc: Monica Gregoire <mgregoire@northandoverma.gov> Sent: Tuesday, February 20, 2018 8:50 AM Subject: Re: Planning Meeting - [Quoted text hidden] All email messages and attached content sent from and to this email account are public records unless qualified as an exemption under the Massachusetts Public Records Law, Visit us online at www.northandoverma.gov. Jean Enright <jenright@northandoverma.gov> Thu, Feb 22, 2018 at 7:29 AM To: Steven Mason <smason_5@yahoo.com> Cc: Monica Gregoire<mgregoire@northandoverma.gov> Yes for the plan sizes. There should be 3 applications sets-- 1 for the Clerk's office and 2 for Planning. [Quoted text hidden] https:Hmail.google.com/mail/u/0/?ui=2&ik=daddl872e7&jsver=nwJUtlz7310.en.&view=pt&search=inbox&th=161 bd7dfc50b711 a&siml=161 b37b24e8cb... 2/2 2/6/2018 Town of North Andover Mail-Fw:Building Permit#30710-128 Dale Street ORTI-1 , NQOVER Jean Enright<jenright@northandoverma.gov> Massachus- Fw: Building Permit #30710 - 128 Dale Street Jean Enright<jenright@northandoverma.gov> Sun, Feb 4,2018 at 9:26 AM To: Steven Mason <smason_5@yahoo.com> i Hi Steve, 1 have asked John Borgesi,Town Engineer,to review the attached plan and provide preliminary comments.Should your project proceed to a filing with the Planning Board John will be performing the stormwater design review. As discussed, neither John nor I can speak for the Planning Board; however,John's preliminary comments indicate that he would like to j see a stone infiltration trench added along the side of the driveway edge and low spot at end of driveway to keep stormwater on site and of the right of way. His review will also include confirming the square footage calculations to confirm the area of impervious area in not increasing as stated. I FYI--I will not be in the office tomorrow. Jean [Quoted text hidden] https://mail.google.com/mail/u/O/?ui=2&ik=7c2eff6265&jsver=YY-up69cTQI.en.&view=pt&msg=1616136l ed7d8cOd&search=inbox&siml=1616136l ed7... 1/1 2/6/2018 Town of North Andover Mail-Fw:Building Permit#30710-128 Dale Street No ` t ANbOVER Jean Enright<jenright@northandoverma.gov> Massachusetts Fw: Building Permit #30710 - 128 Dale Street Steven Mason <smason_5@yahoo.com> Sun, Feb 4, 2018 at 10:41 AM Reply-To:Steven Mason<smason_5@yahoo.com> To:Jean Enright<jenright@northandoverma.gov> Thanks Jean. We really appreciate the help. The trench is a great idea. Perhaps we could put a rain garden at the end of the driveway. Steve From:Jean Enright<jenright@northandoverma,gov> To: Steven Mason <smason_5@yahoo.corn> Sent:Sunday, February 4,2018 9:27 AM [Quoted text hidden] [Quoted text hidden] https://mail.google.com/mail/u/O/?u i=2&ik=7c2eff6265&jsver=YY-up69cTQI.en.&view=pt&msg=161617aad6d8O3d5&search=inbox&siml=161617aad6d,.. 1/1 2/15/2019 Town of North Andover Mail-Fwd:128 Dale NORTH ADOVER Massachusetts Monica Gregoire<mgregoire@northandoverma.gov> Fwd: 128 Dale 7 messages Jean Enright<jenright@northandoverma.gov> Mon, Jul 23,2018 at 8:15 AM To: Monica Gregoire<mgregoire@northandoverma.gov> Monica, Please review and respond to Steve. I believe Jennifer and John were involved with the review and approval of this project. Jean ----------Forwarded message---------- From: Steven Mason <smason_5@yahoo.com> Date: Thu, Jul 19, 2018 at 9:41 PM Subject: Re: 128 Dale To:Jean Enright<jenright@northandoverma.gov> Jean - Quick update: foundation has been back filled, dirt from front of house has been removed. Framing could possibly start end of next week (weather permitting). Also, I'd like to put the trench on the left side of the driveway instead of the right as originally shown. Do you see a problem with that? Thanks, Steve Mason Sincerely, Jean Enright Planning Director Town of North Andover 120 Main Street North Andover, MA 01845 Phone 978.688.9533 Fax 978.688.9542 Email: jenright@northandoverma.gov Web: www.TownofNorthAndover.com : V cid:imageooi.jpg@010EOF52.F68A5980 https://mail.google.com/mail/u/0?ik=dadd1872e7&view=pt&search=all&permthid=thread-f%3A1606783507353892885&simpl=msg-f%3A16067835073... 1/4 2/15/2019 Town of North Andover Mail-Fwd:128 Dale Monica Gregoire<mgregoire@northandoverma.gov> Mon, Jul 23, 2018 at 3:16 PM To:John Borgesi <jborgesi@northandoverma.gov>, Jennifer Hughes<j hug hes@northandoverma.gov> Cc: Jean Enright<jen rig ht@northandoverma.gov> Good Afternoon John and Jen, Steve Mason's project located at 128 Dale is progressing, however, he would like to move the approved trench location from the right side of the driveway to the left. What are your thoughts on this? Thank you, Monica [Quoted text hidden] Monica Gregoire Staff Planner Planning Department Town of North Andover 120 Main Street North Andover, MA 01845 Phone (978)688-9535 Fax (978)688-9542 Email mgregoire@northandoverma.gov Web www.northandoverma.gov Hours of Operation: Monday,Wednesday,Thursday 8 AM-4:30 PM Tuesday 8 AM-6 PM, Friday 8 AM-12 PM 20180222 Proposed Garage Revised.pdf 83K John Borgesi <jborgesi@northandoverma.gov> Mon,Jul 23, 2018 at 3:43 PM To: Monica Gregoire<mgregoire@northandoverma.gov> Cc: Jennifer Hughes<jhughes@northandoverma.gov>, Jean Enright<jenright@northandoverma.gov> I do not see an issue with moving the trench to the opposite side of the driveway. I am assuming the driveway slope will also be modified to direct any runoff to the left now. Also the spot grades at the end of the driveway will also need to be flipped so stormwater is draining to the left. Please let me know if you have any questions. Thanks. John J. Borgesi, P.E. Town Engineer Department of Public Works Town of North Andover https://mail.google.com/mail/u/O?ik=daddl 872e7&view=pt&search=al I&permthid=thread-f%3A1606783507353892885&si mpl=msg4%3A16067835073... 2/4 2/15/2019 Town of North Andover Mail-Fwd:128 Dale 384 Osgood Street North Andover, MA 01845 Phone: 978.685.0950 Fax: 978.688.9573 [Quoted text hidden] Jennifer Hughes<jhughes@northandoverma.gov> Tue,Jul 24,2018 at 8:50 AM To: Monica Gregoire<mgregoire@northandoverma.gov> Cc:John Borgesi <jborgesi@northandoverma.gov>,Jean Enright<jenright@northandoverma.gov> If he moves it to the left side it will be entirely out of the 100'buffer zone. He will need to be sure the driveway pitches that direction. Jennifer A. Hughes Conservation Administrator Town of North Andover 120 Main Street North Andover, MA 01845 Phone 978.688.9530 Fax 978.688.9542 Email jhughes@northandoverma.gov Web www.northandoverma.gov [Quoted text hidden] Monica Gregoire<mgregoire@northandoverma.gov> Wed,Jul 25, 2018 at 7:00 AM To: Steven Mason <smason_5@yahoo.com> Cc:Jean Enright<jen rig ht@northandoverma.gov> Good Morning Steven, If the trench is moved to the left side of the driveway,the driveway slope will also be modified to direct any runoff to the left now. Also the spot grades at the end of the driveway will also need to be flipped so stormwater is draining to the left. These changes should be noted in a letter for our records. Please let me know if you have any questions. Best wishes Monica https:Hmail.google.com/mail/u/O?ik=daddl872e7&view=pt&search=all&permthid=thread-f°/a3A1606783507353892885&si mpl=msg-f%3A16067835073... 3/4 2n5/20 m Town mNorth Andover ma 'Fwu 128oaw ----- ---Forwarded message--------- From:Jean Enright<jenright@northandoverma.gov> Date: Mon,Jul 23.2U18atO:16/\PN Subject: Fwd: 128 Do|m To: Monica Gregoire<mgregoine@nudhundovemoa.gov> [Quoted text hidden] _ Monica Gregoire Staff Planner Planning Department Town of North Andover 12O Main Street North Andover, K8A 01845 Phone (978)688-9535 Fax (978)880-9542 Email mgnegoine@nmrthandoverma.gov Web wmvw.northondovermm.gov Hours ofOperation: Monday,Wednesday Thursday Tuesday 8AM'GPy�. Fddav �)���2lsM ' Jean Enright«]onhght@nodhandovenma.gnv> Wed,Jul 25. 2O18ad10:10AM To: Monica Gregoire<mgregoine@nurthandnvonna.gov> Monica, Did you check with Valerie to see if there were any conditions in the Variance/Special Permit(?)that was granted for this project that would require the ZBA approval tnmodify? |doubt there would be, but probably worth acheck. Jean [Quoted text hidden] Monica Gregoire<mgn+guino@northandovonna.gov> Wed, Jul 25. 2018nt1O:17AN1 To:Jean Enright<jenhght@nodhandovenno.gov> Hi Jean, ZBA has noissues. Best wishes, Monica [Quoted text hidden] hftov:mnai|.Unng|o.ovmmai|mmvik=u add 1o72v7awvw=vt&voumx=oxupvnnmm~thmau-f9/6oA1Vno7no5o7osnnounn5aa|mp|~moo-f%u^1soora000ro... 4/4