HomeMy WebLinkAbout- Consultant Review - 2163 TURNPIKE STREET 3/19/2019 A 0
311 o
North Andover Health Department
Community and Economic Development Division
ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES
LOCATION INFORMATION
ADDRESS: 2163 Turnpike Street MAP: /6 .e-- LOT: 00 i�
INSTALLER: James Boraczek )
DESIGNER:
PLAN DATE: Al
BOH APPROVAL DATE ON PLAN: /III
f
03/18/2019 outlet T-Baffle and filter '
INSPECTIONS
TANK INSPECTION:
DATE OF BED BOTTOM INSPECTION:
DATE OF FINAL CONSTRUCTION INSPECTION:N _
DATE OF FINAL GRADE INSPECTION: Aj/
SEPTIC TANK
❑ Building sewer in continuous grade, on
compacted firm base
` ❑ Cleanouts per plan
❑ Bottom of tank hole has 6" stone base
❑ r, U 'Qry ❑ Weep hole plugged
❑ 1500 gallon tank has been installed
H-10 loading
❑ Monolithic tank construction
r ❑ Water tightness of tank has been achieved by
visual testing
O/Outlet
let tee installed, centered under access port
tee installed, centered under access port
(gas baffle/effluent filter)
❑ inch cover to within 6" of finish grade
installed over one access port
❑ Hydraulic cement around inlet & outlet
Comments:
1