Loading...
HomeMy WebLinkAbout- Permits #NACC #229 - 20-22 COMMONWEALTH AVENUE 3/27/2019 I x I ` i f A CONSERVATION DEPARTMENT Community & Economic Development Division. March 29, 2019 Carl Cincotta 20-22 Conunonwealth Ave North Andover,MA 01845 20-22 Commonwealth Ave, North Andover Front and. Back Pore Replacement, :Driveway Repaving,AC Condenser Installation Conservation Conditions of Approval,NACC #229 Pursuant to section 4.4.2 (A) of the North.Andover Wetlands Protection Regulations, Carl Cincotta, ^ppl:c^ It}1 Jrnenxyx ei-� led for^ sinal -ic;ect fo,, xr>C'tk proposed at 20 22 C oin.mG:-we lth yArre� North Andover, The proposed work is to rebuild front deck as existing, and replace the existing C' by 12'back deck with a 6'by 10' deck. Removal of the existing hot top and regrading and repaving of the driveway within the existing footprint is also proposed. The applicant also proposed to install three.AC condensers in the back corner of the house, next to the driveway. All proposed work is more than 50' from the top of bank associated with the Shawsheen.River. During the March 27, 2019 public meeting, the North Andover Conservation Commission voted unanimously to approve this project. The project is approved only as it relates to the Conservation Commission and any and all other approvals should be obtained by the applicant/home owner. All work shall conform to the following: RECORD DOCUMENTS: Small Project Filing Including: Letter prepared by Applicant,Application Checklist,Aerial Map of Property dated February 27,2019, Mortgage Inspection Plan Received March 21,2019 1 'rhe following conditions are hereby mandated: CONDITIONS. 1. Prior to the start of construction the property owner shall ensure that the site contractor has reviewed the small project permit and is aware of the wetland resource area and the limits of the proposed work. J I 1.20 Main Street,North Andover,Massachusetts 01845 Phone 978.688.9530 Fax 978.688.9542 Web wxvw.httl)://-.v-%v,v.iiortliatidovertna.gov j 2. Excess construction material shall be properly disposed of offsite and accepted engineering and construction standards and procedures shall be followed in the completion of the project.'T"here. shall be no stockpiling of material within 50' of wetland resource areas. 3. The contractor shall install a gravel extension of the driveway in the area of the backyard where vehicles have been parking. This driveway extension shall be edged with material suitable for containing the gravel. 4. The contractor shall install salt socks from the back of the house to the end of the driveway (including the gravel driveway extension), along the side of the driveway facing the Shawsheen Trivet. 5. Upon completion of the approved project and site stabilization,please contact the Conservation Department for a final inspection. 6. This permit shall expire six months from the date of issuance. Should you have any question or comments -regarding the contents of this letter,please do not hesitate to contact the Conservation Department at 978.688.9530. Thank you for your anticipated cooperation with this matter. Respectfully, IN OR 11 AT-4Ju%rVER C 0 S .pi vi�T'I ON i+Ei t .it i rilGl�"i Benjamin Curell Conservation Field Inspector ,s w 120 Nldu2 Street.,North Andover,Massachusetts 01.845 Phone 97&688,9530 Fax 978.688.9542 Nveb ',vNver.l7dtll://www.tiortliaii(lovenni�i.gov