Loading...
HomeMy WebLinkAboutContract #: 1188 - From: 03-25-2019 To: 06-30-2019 - Environmental Partners - DPW TOWN OF NORTH ANDOVER STANDARD SHORT FORM CONTRACT DOCUMENT CONTRACT NO: Contractor Legal Name: To Department Name. Environmental Partners Group,Inc. North Andover Public or -Engineering _Contractor Address: —-—"Mailing Address: 1900 Crown Colony Drive 384 Osgood Street STE 402 North Andover,MA 01845 Quincy,MA 02169 Contractor Vendor ID: 12713 Contract Details: Description of Scope(Attach support documentation) Professional Engineering Services for the design and permitting of a replacement culvert for Barker Street(See Attached Barker Street Culvert Replacement Proposal dated January 21,2019) Begin Date:March 25,2019 End Date:June 30,2019 Rate:S Not to Exceed Amount:$59,000.00 Contract Signatures Finance Director Contractor Department Head Environmental Partners Group,Inc. John Borgesi Approved as to the availability of AGREES TO PROVIDE THE _ ATTACH ALL REQUIRED appropriations GOODS OR SERVICES AS DOCUMENTS INDICATED ACCORDANCE WITH THESE CONTRACT DOCUMENTS AS DEFINED IN THE NORTH ANDOVER In the amount of STANDARD CONTRACT GENERAL CONDITIONS $ :SiSi iature :Si afore Sa ——----- Date: Title: Title:Assistant Director/Town Engineer Date: S-1 1 1 Date: Town Manager: To Counsel. Date: ��~==.�=� ����� ����� Partners -_ _____-___________ �������'/� �pmr(noo//iy for January%1' 2D19 John]. 8urQesiPE Town Engineer North Andover DPW 384 Osgood St North Andover, K8AO184S 0E: Barker Street culvert replacement Dear]ohn' At your request, Environmental Partners Group, Inc. (Environmental Partners) is pleased to provide you with our proposed scope of services and fee for completing the engineering design, permitting, and bidding services for the proposed Barker Street culvert replacement. The existing culvert is a 34-inch diameter corrugated metal pipe connecting an unnamed wetland southeast of Barker Street to the downstream channel and impoundment on Barker Farm property. Our proposed scope ofwork is described below: Task 1—Field Work and Data Collection 1.1 Wetland Resource Delineation 1.1.1 A wetland scientist will delineate the wetlands and the mean annual high water line for the wetland at the culvert. 1.1.2 Meet with the Tovvn's Conservation Agent to review the wetlands delineation and discuss design and construction issues,the permitting process,and options for the culvert replacement. 1.2 Survey 1.2.1 A topographic survey will be performed,encompassing a 50-foot radius of the culvert,which will include survey of the following: 1. Wetland flags 3. Mean annual high water line flags 3. Roadway(centerline,edges of pavement and top of embankment to adjacent wetlands) 4. Underground utilities S. Culvert(including points adjacent to the downstream headwall) 6. Top uf stream bank 7. Bottom of stream bed Page 2 of 5 8. Additional ground surface points to establish topography and streambank elevations 1.2.2 ENVIRONMENTAL PARTNERS will prepare a base plan from the above survey data. The base plan will be utilized for both preliminary and final designs. 1.3 Borings 1.3.1 ENVIRONMENTAL PARTNERS will subcontract with a driller to advance two (2) borings up to a depth of twenty-five(25)feet below the road surface.The borings will be advanced on each side of the existing culvert. 1.3.2 ENVIRONMENTAL PARTNERS will provide a geologist to oversee one day of drilling, collect soil samples of each soil layer, and prepare boring logs. Soil data and blow counts will be logged. Split spoon samples will be taken every 5 feet or change in soil material type. Representative soil samples will be tested at a laboratory to determine soil unit weight and gradation for footing design. Task 2—Evaluation of Alternatives and Preliminary Design 2.1 Alternatives Analysis 2.1.1 Provide an alternative analysis for the replacement of the 24-inch CMP (or HDPE) culvert, including open bottom culvert or embedded culvert, to maximize the channel width and openness to the extent practical given site constraints. 2.2 Model 2.2.1 PCSWMM, Version 5.1 will be used to develop a stormwater model, and estimate the runoff rate and volume, capacity of the culvert and channel, and potential stormwater impacts to the roadway and culvert. The culvert's contributing watershed will be determined by using LIDAR DEM data from MassGIS. The upstream limit of the model will be the culvert and the beaver deterrent device in the earthen berm that limit the flow to the Barker Street culvert. 2.2.2 Land uses will be evaluated from assessor's data and existing aerial photos of the watershed. Soils data will be gathered from the USDA's Web Soil Survey website. Calibration of the model will be completed using the stream level data gathered by data loggers and rainfall information from the National Weather Service.The model will be run for the 2-year 24-hour storm, 10-year 24-hour storm, 25-year 24-hour storm, and 100-year 24-hour storm. 2.3 Preliminary Design 2.3.1 Prepare the preliminary design of the culvert replacement and related features in accordance with MassDEP and Army Corps of Engineers (ACOE) Stream Crossing Standards as much as is feasible at the culvert site,without raising the road elevation or expanding the existing channel. The design will be shown in plan, profile and section views. Separate drawings will be produced for existing and proposed conditions. An existing conditions sheet will include photographs of the culvert and project site. The replacement culvert will be designed to the existing upstream and downstream inverts and in accordance with Conservation Commission requirements. Quincy, MA • Woburn,MA • Hyannis, MA • Middletown,CT envpartners.com Page 3 of 5 2.3.2 Prepare a letter report describing the design approach and preliminary design,together with an opinion of probable construction cost. 2.3.3 Meet with the DPW to discuss the preliminary design plan. Task 3—Permitting 3.1 Prepare and submit a Notice of Intent to the Conservation Commission and MassDEP. 3.2 Notify abutters by certified mail of the public hearing. 3.3 Conduct a site walk with the Conservation Agent to review the design approach. 3.4 Attend up to two public hearings to present and discuss the submittal with the Conservation Commission. 3.5 Coordinate with USACE and prepare a Preconstruction Notification (PCN) Form. The PCN Form may be necessary because the friction coefficient for the new pipe may be less than the existing CMP. The PCN is based on the following Programmatic General Permit eligibility criteria: • Total disturbance is less than 5,000 square feet • The permit application will assume construction will occur between July 1, 2019 and October 1, 2019. • In conformance with General Permit 10: Linear Transportation Projects Including Stream Crossings • In conformance with General Permit 14: Temporary Construction, Access, and Dewatering Task 4—Final Design 4.1 Prepare final design plans and specifications,which will incorporate comments obtained from Task 2 and Task 3, a traffic management plan for the construction work, environmental protection, and construction sequencing.The final construction documents will be suitable for public bidding. 4.2 Prepare an updated opinion of probable cost based on the final design. 4.3 Prepare the schedule for bidding, award,and construction. Task 5—Bidding 5.1. Establish a bidding schedule with the Town. Advertise the project for bidding in one local newspaper and in the Central Register.The Town will submit the project to CommBuys. Quincy,MA * Woburn,MA * Hyannis,MA * Middletown,CT envpartners.com Page 4 of S 5.2. Provide electronic bidding and the distribution of plans and specifications through Projectdog.com. Projectdog is a full service online procurement company that distributes plans, specifications, and addenda; and hosts the bid opening through their on-line portal. The benefits of using Projectdog are the reduced costs associated with printing plans and specifications and their associated distribution and tracking. 5.3. Attend the pre-bid meeting and record questions from prospective bidders. Issue up to two (2) addenda with responses to questions from bidders. 5.4. Tabulate the final bids and check references for the three apparent responsive and responsible low bidders. Prepare a letter of recommendation for award of the contract. 5.5. Prepare the final contract agreement with the selected contractor with the necessary bonds and insurance certificates and submit these to the Town for formal contract execution. To complete this Scope of Services, Environmental Partners proposes a not-to-exceed fee of Fifty Nine Thousand Dollars($59,000).A breakdown of the fee by task is presented in the following table. Task Cost Task 1: Field Work and Data Collection $ 16,100 Task 2:Alternatives and Preliminary Design $12,100 TaskDesign $ 15,900 T r i , k_T_a�s i i6,750 Total 59AW Quincy,MA + Woburn,MA • Hyannis,MA • Middletown,CT envpartners.com Page 5 of 5 We look forward to working with you and the Town of North Andover on this important and interesting project. If this proposal is acceptable,we will prepare a formal agreement. Please feel free to contact me with any questions or concerns. Sincerely, ENVIRONMENTAL PARTNERS GROUP,INC. Paul F. Gabriel, PE, LSP Robert J. Rafferty, PE President Project Manager P:617.657.0200 P:617.657.0277 E:pfg@env artners.com E: rir envpartners.com Quincy, MA + Woburn, MA • Hyannis, MA + Middletown,CT envpartners.com TOWN OF NORTH ANDOVER STANDARD CONTRACT GENERAL CONDITIONS' Article I. Definition of Terms: The following terms in these Contract Documents shall be construed as follows: 2."Town"shall mean the Town of North over,Massachusetts 3. "Contract,Agreement,and Contract Documents"shall include the Town's Standard Contract General Conditions,the Invitation for Bids,Requests for Proposals or other solicitations,the contractors response including Contract Certifications and Applications excluding any language stricken by the Town as unacceptable and including any negotiated statements of work contemplated by the solicitation,Technical Proposals,Contractor's Price Proposals,Performance Bonds,which documents are incorporated herein by reference. Any conflict between the Town's standard contract general conditions and the Contractor's bid proposal or any other submission will be resolved in favor of the Town's standard contract general conditions which shall preempt all other submittals. 4."Contractor"shall mean the individual,partnership,corporation or other entity to which this Contract is awarded. Article 11.Performance: The Contractor shall provide the services to undertake and perform all appropriate tasks described in the Contract Documents. The Contractor shall upon written request remove from Town premises or work sites and replace all individuals in the Contractor's employ whom the Town determines to be disorderly, careless or incompetent or to be employed in violation of the terms of this Contract. Performance under this contract shall include services rendered,obligations due,costs incurred good and deliverable proved and accepted by the Town. The Town shall have a reasonable opportunity to inspect all goods and delivers,services performed by and work product of the Contractor and accept or reject such goods,deliverable,services or work product. Article III. Time of Performance:. The Contractor shall commence work immediately upon execution of this Agreement. If the Contractor fails to work at a reasonable speed or stops work altogether without due cause,as determined by the Town,the Town may give notice in writing to proceed with the work or to carry on more speedily. Three days after presentation of the notice if the work is not proceeding to the satisfaction of the Town, the Contractor shall be considered in default in the performance of the Contract. This Agreement may be extended or renewed upon agreement of the parties and only upon execution of written agreement. Article IV. Revisions in the Work to be Performed: If the Town requires revisions or other changes to be made in the scope or character of the work to be performed,the To will promptly notify Contractor.For any changes to the scope of work,the Contractor shall notify the Town of associated costs in writing. The Contractor shall make the necessary changes only upon receipt of a written acceptance of the costs and a written request from Town. The Contractor shall not be compensated for any services involved in preparing changes that are required for additional work that should have been anticipated by Contractor in preparation of the bid documents as reasonable determined by the Town. Article V. Payment for Services: The Town shall make payment to the Contractor as on the schedule and based on the milestones and deliverables set forth in the Contract Documents or on a periodic basis. Article V1. Ownership and Confidentiality of Material,Work Products: All information,data,reports, studies,designs,drawings,specifications,materials,computer programs,documents,models,inventions,equipment, and any other documentation,product oft ile materials to the extent authored or prepared pursuant to this Contract(collectively,the"Materials"),shall be the property of the Town. All Contractor proprietary rights shall be detailed in the Contract Documents. At the completion or termination of this Contract copies of all original Materials shall be promptly turned over to the Town. Once the To has paid for a particular Material,ownership vests in To and the Contractor must provide such Materials to To within ten(10)business days of the Town's request for the same without cost to the Town. The Town may use the Materials with respect to construction, maintenance,repair,alteration,expansion,modification and reconstruction of the Project at any time and from time to time. The To may use the Materials produced,generated or compiled by the Contractor for another project, provided the Contractor shall not be responsible for changes made to the drawings,plans,or specifications without the Contractor's authorization,nor for the Town's use of the drawings,plans or specifications on another project. The Town agrees,to the extent permitted by law,to hold the Contractor harmless from any claims,losses arising out of any use or changes to the Materials by the Town or its representatives during any other construction not a part of this contract. The Contractor shall not use such materials for any purposes other than the purpose of this Contract I These Standard Contract General Conditions apply to contracts procured pursuant to M.G.L.c.30B or for exempt good and services. without prior written consent of the Town. Article VII. Release of Town: The Contractor agrees that acceptance of what the To tenders as the final payment for final services under this Agreement shall be deemed to release of the To forever from all claims, demands,and liabilities arising from,out of,or in any way connected with this Agreement. The Contractor shall execute a release if asked to by the Town. Article VIII. Indemnification: The Contractor shall indemnify,defend and hold harmless the Town and all of its officers,agents and employees,with counsel acceptable to the Town,from all suits,claims,demands,losses and liabilities brought against them or based upon or arising out of any act or omission of the Contractor,its agents, officers,employees,or subcontractors in any way connected to this Agreement. The Contractor agrees that it shall be solely responsible for the conduct,health,and safety of its employees during the term of this contract and shall hold the To harmless for any injuries,damages or losses incurred by its employees while working on this project. The Contractor's agreement to indemnify the Town shall not be deemed to be released,waived or modified in any respect by reason of any surety or insurance provided by the Contractor under the Agreement. Article IX Insurance: The Contractor shall secure and maintain insurance adequate to meet its obligations hereunder and shall provide the Town with certification of such.The Contractor shall at its own expense maintain motor vehicle liability insurance policies,workers compensation,and general liability coverage.For Contracts for professional services,the Contractor shall carry professional liability or Errors and Omissions liability insurance with a minimum limit of$1,000,000.00 per occurrence, $2,000,000.00 aggregate with a maximum deductible of $25,000.00. Article X.Assignment: The Contractor shall not assign,transfer,delegate or subcontract any interest in this Agreement without the prior written consent of the Town. Article XI. Relationship with the Town: All services to be performed under the terms of this contract will be rendered by the Contractor as an independent Contractor. None of the terms of this contract shall create a principle- agent,master-servant or employer-employee relationship between the To and the Contractor. The Contractor shall have no capacity to bind the Town in any contract nor to incur liability on the part of the Town and if the Contractor employs or proposes to employ any person during the term of this contract,the employment or proposal shall not obligate the To in any manner to any such employee. Article XII.Compliance with Laws and Contractors Responsibilities: The Contractor certifies that it and its subcontractors has complied with all applicable laws and is eligible to work in the Commonwealth of Massachusetts and that it is in compliance with Federal and State Tax laws. The Contractor shall not discriminate against any employee,or applicant for employment because of race,age,color,religious creed sexual orientation or identification,handicap,ancestry,sex or national origin. The Contactor will in all solicitations or advertisement form employees placed by or on behalf of the contractor,state that all qualified applicants will receive equal consideration for employment without regard to race,age,color,religious creed, sexual orientation or identification, handicap,ancestry sex or national origin. If applicable,as determined by the Massachusetts Department of Labor Standards,the Contractor shall comply with the Massachusetts Prevailing Wage an shall cause its subcontractors to comply with M.G.L.c. 149,s.27 ,which requires that a true and accurate record be kept of all person employed on a project for which the prevailing wage rates are requires. The Contractor shall and shall cause its subcontractors to submit weekly copies or their weekly payroll records to the City,the extent the Prevailing Wage is applicable. If an employer,the Contractor certifies compliance with applicable state and federal employment laws and regulations,including but not limited to minimum wages and prevailing wages programs and payments, unemployment insurance and contributions,workers compensation and insurance,child labor laws,human trafficking,fair labor practices,civil rights laws,non-discrimination laws and any and all other applicable laws. The Contractor agrees to be responsible for and warranty the work of its subcontractors listed in the Contract Documents and to ensure their compliance with all applicable legal,quality and performance requirements of the Contract Documents. The Contractor may not use subcontractors not named in the Contract Documents without the prior written consent of Town,which will not unreasonably be withheld. The Contractor agrees to pay all debts for labor and/or services and materials contracted by it,if any,and for the rental of any office space,equipment or machinery hired by it,if any,for and on account for the services to be performed hereunder. The Contractor shall not take any action that causes any public official to be in violation of the State Ethics Law,M.G.L.c.268A. The Contractor certifies that it and its subcontractors are not currently debarred or suspended by the U.S.government, the Commonwealth or any of its subdivisions,and that it nor any of its subcontractors have been subject to a federal or state criminal or civil judgement,administrative citation,order for violation of M.G.L. c. 149,s. 151 or the Fair Labor Standards Act within three years prior to the date of the contract. The Contractor certifies that it has not declared bankruptcy. Article XIII. Severability: In the event any provision of this Agreement is found by a court of appropriate 2 jurisdiction to be unlawful or invalid,the remainder of the Agreement shall remain and continue in full force and effect. Article XIV. Termination of Agreement:— The Town may terminate this Agreement upon immediate written notice should the Contractor fail to perform substantially in accordance with the terms of the Agreement with no fault attributable to the other. In the event of a failure to materially perform by the Contractor the notice of such breach shall be accompanied by the nature of the failure,and the Town shall set a date at least 10 days later by which Contractor shall cure the failure. If the Contractor fails to cure within the time as may be required by the notice,the Town may at its option,terminate the Agreement. The Town may terminate this agreement without cause at any time,effective seven days beyond a termination date stated in a written notice of termination. In the event of termination,the Contractor shall be compensated for work product and services performed prior to the date of termination. In no event shall the Contractor be entitled payment for any services performed after the effective date of termination,and under no circumstances shall the total price exceed the contract price. Article XV. Governing Law and Jurisdiction: This Agreement shall be governed by the laws of the Commonwealth of Massachusetts. Any actions arising out of this contract shall be brought in a state or federal court in the County of Essex,Commonwealth of Massachusetts,which shall have exclusive jurisdiction thereof. 3 ENVI-15 OP ID: BC ,4COR0' CERTIFICATE OF LIABILITY INSURANCE DA03/22/2019TE I� 03/22/2019 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies)must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Poole Professional Ltd. NAME° 107 Audubon Rd.#2,Ste.305 (A(C.No.Ell:781-245.5400 FAX No':781-245-5463 Wakefield,MA 01880 E-MAIL Christopher A.Poole ADDRESS: _ INSURER(S)AFFORDING COVERAGE NAIL i INSURER A:Travelers Indemnity Co of CT 25682 INSURED Environmental Partners INSURERS:Travelers Indemnity Co America 25666 Group,Inc. INSURER C:Travelers Indemnity Co. 25658 1900 Crown Colony Dr.Suite 402 Quincy, MA 02169 INSURER D:XL Specialty Insurance Company 37885 INSURER E: INSURER F COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE POLICY EFF POLICY EXP LIMITS LTR POLICY NUMBER MM/DD MM/DD A X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,000,00 CLAIMS-MADE OCCUR X 6802J049788 06/13/2018 06/13/2019 PREMISES Ea occunce $ 1,000,00 MED EXP(Any one person) $ 10,00 PERSONAL&ADV INJURY $ 1,000,00 GEN`L AGGREGATE LIMIT APFUES PER: GENERAL AGGREGATE $ 2,000,00 ICY JET ry L PRODUCTS-COMP/OP AGG $ 2,000,00 OTHER: $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ 1000000 Ea accident > > B ANY AUTO _ X BA313197927 06/13/2018 06/13/2019 BODILY INJURY(Per person) $ X LOS OWNED X AUTEDU D BODILY INJURY( accident) $ — AUX HIRED AUTOS X NON—OWNED PROP RT(DAMAG $ AUTOS Per accident $ X UMBRELLA LIAB X �OCCUR EACH CURRENCE $ 6,000,00C EXCESS LIAB AIMS-MADE CUP6572Y321 06/13/2018 06/13/2019 AGGREGATE $ 6,000,00 DED X I RETENTION$ 10,000 $ WORKERS COMPENSATION AND EMPLOYERS'LIABILITY STATUTE ER B ANY PROPRIETORIPARTNER/EXECUTIVE Y/N UB-6K138549 06/13/2018 06/13/2019 E.L,EACH ACc1oENT $ 1,000,00 OFFICERIMEMBER EXCLUDED? N N/A (Mandatory In NH) E.L.DISEASE-EA EMPLOYEE $ 1,000,00 If es,describe under 1 ^v00 OO DESCRIPTION OF OPERATIONS below E.L.DISEASS-POLICY LIMIT $ r r D reh/Eng.Prof.Liab DPR9927526 0611812018 06/1812019 Per Claim 5,000,00 Incl.PollutionLiab Aggregate 5,000,00 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,maybe attached N more space Is required) Town of North Andover is included as additional insured per written contract under the general and auto liability policies subject to same terms and conditions. Re: Barker Street Culvert Replacement CERTIFICATE HOLDER CANCELLATION TOAND-2 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE Town of North Andover THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. John Borgesi, PE Town Eng 384 Osgood Street AUTHORIZED REPRESENTATIVE North Andover, MA 01845 ©1988-2014 ACORD CORPORATION. All rights reserved. ACORD 25(2014/01) The ACORD name and logo are registered marks of ACORD