Loading...
HomeMy WebLinkAbout- Consultant Review - 337 PLEASANT STREET 5/2/2019 North Andover Health Department Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 337 Pleasant Street MAP: 95 LOT: 70 INSTALLER: Todd Bateson DESIGNER: PLAN DATE: BOH APPROVAL DATE ON PLAN: INSPECTIONS TANK INSPECTION: DATE OF BED BOTTOM INSPECTION: DATE OF FINAL CONSTRUCTION INSPECTION: DATE OF FINAL GRADE INSPECTION: D-Box and outlet T – inspected 4/18/2019 by Brian LaGrasse SEPTIC TANK Building sewer in continuous grade, on compacted firm base Cleanouts per plan Bottom of tank hole has 6” stone base Weep hole plugged 1500 gallon tank has been installed H-10 loading Monolithic tank construction Water tightness of tank has been achieved by visual testing Inlet tee installed, centered under access port Outlet tee installed, centered under access port (gas baffle/effluent filter) _____ inch cover to within 6” of finish grade installed over one access port Hydraulic cement around inlet & outlet DISTRIBUTION-BOX Installed on stable stone base H-20 D-Box Inlet tee (if pumped or >0.08’/foot) Hydraulic cement around inlet & outlets Observed even distribution Speed levelers provided (not required) Schedule 40 PVC Pipe Comments: