Loading...
HomeMy WebLinkAbout20190130 Correspondence 2/20/2919 Town of North Andover Mail-Watershed Special Permit-Lot 3 Great Pond Road North Andover R No ` VER J,, Monica Gregoire Cnn g re o�re northandorerma. Q V cu Watershed Special Permitm Lot 3 Great Pond Road North Andover Elizabeth Cr Wallis <LWallis a@hayesengxcom> Wed, Feb 20, 2019 at 10.33 AM To: Monica Gregoire <mgregoire@northandoverma.gov> Cc: Bonnie Wolstromer<bwolstromer@northandoverma.gov>, David Innis <daveinnis@gmail.corn> i Monica, Please find attached an engineers certification letter from Hayes Engineering, Inc. dated February 14, 2019 being submitted relative to your Watershed Special Permit review comment#2 below. The original on one copy will be mailed to your office for your file. I believe that with this submission, all comments made February 5th as a result of your WSP review have been addressed. Let nee know if there is anything else needed for the WSP We look forward to discussing this Special permit application with the Planning Board members at their meeting on March 5th. Regards, Libby Elizabeth Wallis Wetland Scientist Hayes Engineering, Inc. 603 Salem Street Wakefield, MA 01880 Phone:(781)246-2800 Fax:(78 1)246-7596 mailto:lwallis@hayeseng.com From: Monica Gregoire maiito:mgregoire@northandoverma.gov] Sent: Tuesday, February 05, 2019 3:20 PM To: Elizabeth G. Wallis Cc: Bonnie Wolstromer; David Innis [Quoted text hidden] [Quoted text hidden] All email messages and attached content sent from and to this email account are public records unless qualified as an exemption under the Massachusetts Public Records Law, Visit us online at www.northandoverma.gov. https:l/mail.google.corn/mail/u/O?ik=dadd 1872e7&view=pt&search=all&permmsgid=msg-f°/o3A16263g2487g28025696&simpl=msg f%3Al 6260024870... 1]2 03 Salem Street Nantucket,MA 02554 Wakefield, MA 01880 Tel: (5 )223-7909 Tel: 73 46 -23 NOA-0040B Hayes Engineering, Inc. Fax: (781)246-7596 Refer to File February 14, 2019 Nis. Monica Gregoire Planning Department Town Hall 120 Main Street North Andover, MA 01845 RE: Lot 3 Great Pond Road Watershed Special Permit Engineer water Quality Certification 9 Y € Dear Ms. Gregoire, € In accordance with watershed Protection District Section 195-4.20(C)(3) of the North Andover Zoning Bylaw, the undersigned certifies that the proposed driveway and utility work being proposed in association with a new single family house at Lot 3 Great Pond Road will not result in any significant degradation of water quality or quantity for waters entering Lake Chichewick. This certification is based upon the following project stormwater management features: 1. Driveway will be surfaced with pervious crushed stone and paver materials, allowing infiltration and treatment of stormwater runoff. 2. Planting areas and other landscaping will be installed as part of the project, allowing allowing for stormwater runoff infiltration and treatment. } 3. Runoff from the house roof will be captured and directed into a"Stormtech" recharge chamber system. 4. Protect site is located more than 400 feet from Lake Chichewick and the common driveway, Great Pond Road and wetlands are present between the project site and the Lake, presenting additional opportunities for stormwater management. i t Feel free to contact me directly any questions or should you need anything further. We look forward to discussing the supplemental information at the Conservation Commission meeting on March 5, 2019. Very truly yours, Peter J. Ogren, P.E., P.L.S. President PJOIew Enclosures cc: Robert Innis