HomeMy WebLinkAbout- Correspondence - 204 MILL ROAD 5/15/2019 o r M
4#ytq
u
CommunityNorth Andover Health Department,
n sic Development Division
May 1,4, 2 , 9
John D. Sullivan, III
Sullivan41
Engineering Group, LLC
P.O. Box 2004
Woburn, MA 01888
Re: Subsurface Sewage Dlk,posal System Plan for 204 Mill Road (Map 107A,,Lot
Dear Mr. Sullivan,-.
The proposed wastewater system design planfor the shove site dated May 1, 2019 has been
reviewed. Unfortunately, the plan t e r l the following items re coffected.
The specific section in Title 5 3 10 CMR 15.000, or North.Andover regulation that is not met by
this deign follows each item where applicable.
1
Since the Infiltrator Chamber system is proposed as an aIt rn ti e soil absorption system the
"Standard Conditions or Alternative Soil Absorption Systems with GeneralUse Certification,
r Approved for Remedial Use (revised 5 1 "will apiply.
1. Provide the following as requiredby the approval conditions, Section (18)
°� A � �z�completed any requiredtraining y
Conipany.for the design and Installafion qf theTechnology,-
a certification, signed by the Owner qf record,for the property,to be served by
the Techn , stating h he oiler Owner.-
, has been provided espy Qf the Title 5 11A technology,Approiwl,
theOwner's Mans , and the Operation and Maintenance Manual,
and the wner e h all et-in and ndit* $w
. for,Systeni,s installed under a Reniedial Use Approval, the owner
agrees f i i his • spons ibi 11 ties to pro14de written notification
of the Approval to any new Owner, as required by,310 CMS
5,2 ' , -
i
i
Page
North Andover Health Departmeilt, Town Hall, .120,Main Street,
North-Andover, MA 0 1845' Phone,
I
. if the,design dose notprovidefor the use ofgat-bage,v# ndet-s, the
t4esh4letIon is to derstood and aeeepted,1- and
'. wet •ot-not covered by a warranty, thie Systeni Ovviier
replace, modify or-take aiq
understands the requit-ement to repaiiI
other action as i-equired by the Depanment or the LA A, i 'the
partn,ie t ot-the LAA detei-mines the System ,to, befalling t
� tecthealth, a �. the envii nment � dgfined in
3' 0 CM 5.303.
I In dance with Section (7) (e) (f) & (g), provide a best feasible upgrade plan l
3. In accordance with. Section c , show a aximu . rea a .ilable for a
conventional, system
Please feel free to contact the office or Mill River Consulting -2 2- with any
questi,ons you may have. We lookforward working with you to obtaina wastewater treatment
and dispersal system which will be in compl ��ce with all regulations and assure r e t r of
public health and the environment of North Andover.
Si c.ety
Brian J. LaGrassie, CEIIT
Director of Public Health
Owner
File
i
Page 2 of 2
North.Andover Health a nent'l, Towti Hall,, 120 MainStreet,
North Andover,, A 0 18,45 Peons: *6 . Fax 978.688.91,542