ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES
LOCAT10N INFORMATION
ADDRESS: 540 Sharpners Pond Road SAP: 9 .B LOT.* 3
INSTALLER: Dean Dynan
DESIGNER:
LA N DAT A,.,
BOH APPROVAL DATE OIL PLAN:
D-Box Repair Inspection — May 24, 2019 9:00am by Brian LaGr sse
INSPECTIONS
TANK INSPECTION,
DATE OF BED BOTTOM INSPECTION:
DATE OF FINAL CONSTRUCTION INSPECTION':
DATE OF FINAL GRADE I SPECTIO
Installed on stable stone base
-2 ,lcx
Inlet tee (if pumped or > .08' " ct
Hydraulic cement around Inlet & outlets
Observed even clistribution
Speed' levelers provided (not required)
Schedule 40 PVC Pipe
1
+
Comm Brats
All set 5 24 20 Arian LaGr ss