HomeMy WebLinkAboutSeptic Approval Letter - Correspondence - 1 PENNI LANE 6/4/2019 I
11
1
I
/
l
Il
fl 1
1 1
4�l 11. A I ii
it Y w
1
0
N
J
North Andover Health Department
June.4, 2019
{ cs Boyle
Penni Lane
North,Andover,
A 01845
Subsurface Sewage Disposal System Plan for I Penni Lang (Map 107D,Lod
The proposed wastewater em design planfor the above site dated March 26, 201.9 with
final revision date on April 25, 2019 and received n May 1, 201 9 1 s base approved. The
design.plan has been approved r use n the construction of an u 1 gr+tided -alas � 1 system
for a four ) bedroom home with a maximum ofnine 9 total rooms ti,li i g a septic
pump c1 r, i �tributi . 1 x and leaching field.
is design plan approval s l it June
2021.
During this time, a licensed sept1c system installer must obtain a permitand complete this work,
and a Certificate ofCompliance be endorsed by the Hier, designer and the,Town ofNorth
Andover. In the event an imminent nealth problem, such sewage backup, into the dwelling i
,occurring, 1 North Andover Board of Health may seduce the time peri r which h1 l n is
lid.
This approval is also subject to the following conditions
1. If site conchb o s are `ound In the field to be different Erom those indicated o :1
design.plan:. .n o�r soll evaluatlon,the originally issued Disposal System C nstr c 1
Perm, is void, installation shall shop, and the applicant shall rea ply for a new
Disposal Systems ConstructIo Permit 31 C R 5. 2 1 I.
t
_.w__.____ _w.- __ . ......
i
'age 1. of 2
North Andover Health De,pailment
1.20 Main Street
,. rth, ndov 1845
o,ne 9 7 8 6 8 81.9 54 0 Fax: ., 9542I
I Penni latie, June 41, 2019,
2. It is the responsibility of the applicant and/or the applicant"s, septic system designer,
septic system installer or other representative to ensure that all other state, and
muni.cipal. requirements are met. These may include review by the, Conservation
Commission, Zoning Board, Planning Board, Building Inspector, Plumbing Inspector
and/or Electrical Inspector. The issuance of a,Disposal System Construction Permit
shallgot construe and/or imply compliance with any of the aforementioned,
0
f_1
�requireme . s.
3. The plan calls f"or,replacing only a portion of the building sewer pipe located between
the dwelling and m hat proposed septic tank.. Itiec s romended t the enLire building
sewer pipe be replaced at: .the time of construction.
Please feel fi-ee to contact the office with,any questions you may have. We look forward to
working with you to obtain.a wastewater treatment and dispersal system which will.be in
Compliance with all regulations and assure protection of public health and the environ,ment of
North Andover.
Sincerelyi,
...............
("'d "/1
e"A
Brian J.LaGrasse, CE11
Director of Public Health
Encl. Installers I ist
CC''*, James M. Kavanaugh.
File
....................................... ...... ............................................. ......................................................................................................................................................................................................................................................................
Page 2 of 2
Nofth Andover Health De� artmen't
,P
120 Main Street
North Andover, MA 10 1845
Phone-. 9178.688.9540 Fax.- 978.688. 9,542