Loading...
HomeMy WebLinkAboutApproved Plan page 1 - Approved Septic Plan - 203 MILL ROAD 6/5/2019 NOTES YSEEM SHALL BE IN CONFORMANCE WITF 3570 ALL Fl- BENE4Ni THE S ABSORPTION S CUR'95,255(3). 2.' ALL STONE TO SE 0008LE WASHED AS NECESSARY AND FREE OF I.RNN,FINES__AND DUST- 3.) THis SYSTEM IS NOT DESIGNED FOR USE WITH A CARS GE GQINDEP- 4) REMOVE ALL TOPSnli,ROOTS AND SLIGSOOL'AND REF LACT WITH SPECIFIED FILL WITHIN % FEET OF SYSTEM.® SHMI RE Ni CONFORMANCE WITH CMR 115-255(3), SC5sTEM-KAU Tl --R- COVEN MAIL VAL OVER IHE� -S �'BE FREE OF CLAY,SJONEFS,WASON s, 40, STUMPS�OR WASTE CONSTRUCTION MATERIAYI�THE TOP 3'SHALL BE LOAMED AND SURFACE ANICH0 S97 DED. I DRY WHICH MAY CPUSJH'OR DISTURO THE ALIGNMENT OF _E 4 PIPES IN THE DISPOSAL AREA SHALL NOT BE ALLOWED, at THH4_10 FT OF TFfE SEPTIC TANK FOUNDATION DRAINS ARE N*T AD BE 1INSTALLED Wi NOR MTHIN ff 007 THE SOIL ABSORPTION SYSTEM, 7) A PIPiNG SHALL BE!_IV STRAIGHT ON CON IINUOUS GRADE AND SHALL HAVE WATERTIGHT I TS S.t PROPERTT LINES SHOWN WERE TAXEN FROM EXISTING PLANS AND RZCORVS, 9,1 THE LOCATION OF Ear SDING UNDEPGPOUND UTHTFIE5 WAS TAKEN FROM EXISTING PLANS AND REC 0-S OR FROM FIELD OB ION SERVATS AND MARKINGS AND ARE APPROXIMATE- JqC THE CONTRACTOR SH411 BE RESPONSIBLE FOR OFRIFFYiNG THE EXACT L0­CA71ON Or-ALI EkISTING UTILITIES HEFOPE_CD.N_'TftlCT!0N BZGINS,TLIE DESIGN ENG;NEEJR SHALL BE NORFIED JMMEDM17ELY OF AW.DISCREPANCIES %THAT PEA EDiAL ACTION CAN K-TAKEN, 36 4 0 THE CONTRACTOR SHAL NOTIFY 1WE DESIGN ENGINEER 48 HRS.iN ADVANCE OF RED EXCAVATION= PLETION SO CAN C CUR AND COO, .HAT REQUIRED MOSPEC-NONS C jC, - THE CONTRACTOR SHALL BE FINANCIAl Y RESPONSIBI FOR THE AS-K T lM IRSPE TIONS N AD LE I PLAM[17-SEPV.m­SHAL BE INCL'iDED AS P4RT OF TN CONSTRUCT,ON CONTRACT, ALL SYSTEM COMPONEA1,73 SHALL BE MARVED WITH MAGNETIC MARKIING TAPE BEFORE BEING BURIED UNLESS METAL COVERS APE PROPOSED AND CAN OTHERWISE FE MAGNE-11CALLY DETECTED WT WITI-fl �00 FT N ANY PUSLiC WELLS OR DRINKING WATER I-B 1) NO wELLS siT. JN I A PPIVAE ZXi ES WiTHi N 400 rT,OF NIE 5'-'S?'Em Ar?EA=58,651 SIF. I N 2 H I NO WETLANDS EXIST WITHIN'OOFT.OF THE Pr,,OPCSED SYSTEm. 3464 AC —Ad DESIGN,As' CO -14E R, A,ION PR E*IES OV'S SY�tlE LL MATERIALS A &WO, 11 iNS 4-7 NO rt CB_l­44,3i4 N'AND A T I SHALL BE ANC ADS INTENDED TO BE 1 FULL CONFORMANCE WITH TITLE 5,"!N!MUM Pi % 00% REOLUREAdENTS FOP THE SUBSURFACE DISPOSAL OF SANITARY SEWAGE,370 C"_R b 15.00I THROUGN l&505_UNLESS OTHERWISE NOTED- N ", • T U H SITE IS NOT CATEO WTTHN THE LAKE C0041 HEWICK ATEPS W14ED PROTECDON 5 Ic u �IfERLAY ViCTIO-T -01 5TFOCVFlI- -A AF7 As ZZ" v­ A EROSiON CONTRO! SIL,Soc K M OF % 4. ,-INV _x DESIGN CALCULATIONS 440 GPEL V_�WGK FLOW, BEDROOMS x DESIGN PER-C RATE, MIN AN DE iGN FOR LEACHING-ENCHES(SEE DETAIL) �As -F�CTA DEPTH 72" AC w FIFFECTtV Wim 36' EF '0 IF SOh CL-4— J, TRENCH C-,qPCI-Y M_'SJ�/FL t­56 GA--111S.F_ _L8_GAL,_/F7., Vw GAt- OF TRENCH REO-luRo 4 I-I-E RENCHES ATfrn FT. _10 Fi.OF TRENCH PRO!ar�_rL N PROP BUILDNGS- 's:, si�PD 7ANK REO Us 200-X 440 CAL 39 GAL,BUT NOT LESS THAN 1500 GAL,L' - 11 C- - 8 T - RA7-D PROF VENT f CATICIN SEFINIC'ANK PROVIDED:1500 GAL. By ow'Nu?' ALI A PROP iNSPECTiOO PORTS -V APPRO'ED BVF If [,,22,x8- BOARm F;�Mu­­z 'S 'vv' V OP x'60'AL LONG NAME f PROP.TREN'CMES 21 j . PROP LIN OF EXCAVATION ALL AR ND y 'SEE NOOE 4� X/I x If 1 CERTIF THE LOCATION,ELEI�ATIOJN,AND VES ry Iz pz LOCUS kAP SH OWN ON TIM PLAN RESULT FROM AN ACTUAL I SURVEY MADE ON THE GROLWO. NOT TO SCAL-E F'ROP-?50U GALI MONOLITH lC Ll ftCEI%TD VLADIMIR NEUCHENOK DATE loft' ft -ROP. Imem tq SA�PtO- H-20 QD RN D-BOX NAI SLI IN U,P, 5' EL-225 0 bi PLAN OF PLAN SUBSURFACE SEWAGE DISPOSAL SYSTEM flv SCALE/ :.=a20' NORTH ANDOVER, MASS. AS s.J?EPA,EDT,FOP N, CAROLE R. RESCA 0/1)ir l6m_ X_ co S(�ALE AS S140,WN DATE,917_1V16 f ASSESSORS MAP 107A LOT 28 SjRDlVl§I0Df_10T# Fly twa s DATE BY PEVl5i( 1 6-6-1 7 1 DO PEP BO,H.PEYLEW AMRWCK IMBIRMW SMVNJU "p 66 PARK ST T A 90�ER AMSSACHLWEIT 01810 M! SHEET OF 2