Loading...
HomeMy WebLinkAboutConstruction Notes - Consultant Review - 203 MILL ROAD 6/6/2019 North Andover Health Department Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 203 Mill Road (formerly 865 Johnson Road Lot 1B) MAP: 107A LOT: 28 INSTALLER: Tim Quinlan 978-457-0528 DESIGNER: Vladimir Nemchenok – Merrimack Engineering Services PLAN DATE: 6/8/2017 revised 1/8/2018, 1/24/2018,2/1/2018 BOH APPROVAL DATE ON PLAN: 6/18/2018 INSPECTIONS TANK INSPECTION: 3/19/2019 DATE OF BED BOTTOM INSPECTION: 3/20/2019 and 3/21/2019 DATE OF FINAL CONSTRUCTION INSPECTION: 4/2/2019 DATE OF FINAL GRADE INSPECTION: SITE CONDITIONS Contractor reports any changes to design plan N/A Existing septic tank properly abandoned Internal plumbing all to one building sewer Topography not appreciably altered Comments: Installer moved D-box to be in the middle of the trenches to provide an equal slope to between each trench SEPTIC TANK Building sewer in continuous grade, on compacted firm base Cleanouts per plan Bottom of tank hole has 6” stone base Weep hole plugged 1500 gallon tank has been installed H-10 loading Monolithic tank construction Water tightness of tank has been achieved by visual testing Inlet tee installed, centered under access port Outlet tee installed, centered under access port (gas baffle) 24" inch cover to within 6” of finish grade installed over one access port Hydraulic cement around inlet & outlet Comments: Installer will have a cleanout installed between the two bends in the building sewer line. He will send a photo to the BOH office upon completion. DISTRIBUTION-BOX Installed on stable stone base H-20 D-Box N/A Inlet tee (if pumped or >0.08’/foot) Hydraulic cement around inlet & outlets Observed even distribution Speed levelers provided (not required) Schedule 40 PVC Pipe Comments: SOIL ABSORPTION SYSTEM (General) Bottom of SAS excavated down to C soil layer, as provided on plan Size of SAS excavated as per plan Title 5 sand installed, if specified on plan N/A40 Mil HDPE barrier installed Laterals installed and ends connected to header (and vented if impervious material above) Elevations of laterals and chambers installed as on approved plan N/ARetaining wall (boulder / concrete / timber/ block) Final cover as per plan Comments: Excavating field in stages due to high ground water. Bottom of bed excavated down to elevation 219.5 on 3/20/2019 in stage 1. Stage 2 inspected on 3/21/2019 same elevation. FINAL GRADE Loamed Seeded Cover per plan Comments: inspected by S. Casey 6/5/2019 DOCUMENTS NEEDED Certification of Installation Form submitted By engineer and signed and dated by Engineer and installer As-Built Plan BM = 228.00 (TOF) HR = 3.96 HI = 231.96 SYSTEM ELEVATIONS ROD AS-BLT INVERT DESIGN INVERT ELEVATION ELEV ELEV Benchmark Building Sewer OUT 5.24 226.37 226.25 Septic Tank IN 5.41 226.20 226.05 Septic Tank OUT 5.78 225.83 225.80 Distribution Box IN 6.12 225.49 225.50 Distribution Box OUT 6.26 / 6.27 225.35 / 225.34 225.33 Lateral 1 TOP 6.29 / 6.70 Lateral 1 INVERT 225.32 / 224.91 225.30 / 224.90 Lateral 2 TOP 6.28 / 6.70 Lateral 2 INVERT 225.33 / 224.91 225.30 / 224.90 Bottom of Bed 8.01 223.95 223.90