Massachusetts Wetlands Protection Act M.G.L.c. 131, §40
A. General Information
1. Conservation Commission NORTH ANDOVER
2. Issuance a. r OOC b.l— Amended OOC
3.Applicant Details
a.First Name TOM b.Last Name ZAHORUIKO
c.Organization TLD,LLC
d.Mailing Address 115 CARTER FIELD ROAD
e,City/Town NORTH ANDOVER f State MA g.Zip Code 01845
4. Property Owner
a.Fist Name TOM b.Last Name ZAHORUIKO
c.Organization TLD,LLC
d.Mailing Address 115 CARTER FIELD ROAD
e.City/rown NORTH ANDOVER f.State MA g.Zip Code 01845
5, Project Location
a.Street Address LOT B-ABUTTING 72 GREAT POND ROAD
b.City/Town NORTH ANDOVER c.Zip Code 01845
d.Assessors Map/Plat# 96 e.Parcel/Lot# 4
f,Latitude 42.68572N g.Longitude 71.10975 W
6.Property recorded at the Registry of Deed for:
a.County b.Certificate c.Book d.Page
NORTHERN ESSEX 13045 176
7.Dates
a.Date NOI Filed: 11/5/2012 b.Date Public Hearing Closed: 1/9/2013 c.Date Of Issuance: 1/10/2013
8.17inal Approved Plants and Other Documents
a.Plan Title: b.Plan Prepared by: c.Plan Signed/Stamped by: d.Revised Final Date: e.Scale:
LOT B(ABUTTING
72 GREAT POND SULLIVAN JOHN SULLIVAN III P.E.
ROAD),SITE ENGINEERING AND SCOTT L.GILES,PLS December 12,2012 1"=20'
DEVELOPMENT GROUP,LLC
PLAN OF LAND
Page 1 of 10 ELECTRONIC COPY
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection-Wetlands MassDEP File#:242-1577
~ eDEP Transaction#:5343 57
WPA Form 5 -Order of Conditions CityfTown:NORTH ANDOVER
Massachusetts Wetlands Protection Act M.G.L.c. 131,§40
DEFINITIVE SULLIVAN
SUBDIVISION ENGINEERING SCOTT L.GILES,PLS December 7 2012 1"=20'
PLAN"TURKEY GROUP
HILL"
B. Findings
LFindings pursuant to the Massachusetts Wetlands Protection Act
Following the review of the the above-referenced Notice of Intent and based on the information provided in this application and
presented at the public hearing,this Commission finds that the areas in which work is proposed is significant to the following interests of
the Wetlands Protection Act.
Check all that apply:
a. r Public Water Supply b. F_ Land Containing Shellfish c.F Prevention of Pollution
d. 1✓ Private Water Supply e. F Fisheries f F Protection of Wildlife Habitat
g. lv Ground Water Supply h. 1v Storm Damage Prevention i. r Flood Control
2.Commission hereby finds the project,as proposed,is:
Approved subject to:
a,r The following conditions which are necessary in accordance with the performance standards set forth in the wetlands regulations.
This Commission orders that all work shall be performed in accordance with the Notice of Intent referenced above,the following
General Conditions,and any other special conditions attached to this Order.To the extent that the following conditions modify or
differ from the plans,specifications,or other proposals submitted with the Notice of Intent,these conditions shall control.
Denied because:
b.r The proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations.Therefore,
work on this project may not go forward unless and until a new Notice of Intent is submitted which provides measures which are
adequate to protect interests of the Act,and a final Order of Conditions is issued.A description of the performance standards
which the proposed work cannot meet is attached to this Order.
c,r The information submitted by the applicant is not sufficient to describe the site,the work or the effect of the work on the interests
identified in the Wetlands Protection Act.Therefore,work on this project may not go forward unless and until a revised Notice of
Intent is submitted which provides sufficient information and includes measures which are adequate to protect the interests of the
Act,and a final Order of Conditions is issued,A description of the specific information which is lacking and why it is
necessary is attached to this Order as per 310 CMR 10.05(6)(c).
3 Buffer Zone Impacts:Shortest distance between limit of project disturbance and the wetland resource 25
area specified in 310CMR10.02(1)(a). a.linear feet
Inland Resou rce Area Impacts:(For Approvals Ortly):
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
4. r Bank
a.linear feet b.linear feet c.linear feet d.linear feet
5.r Bordering Vegetated Wetland
Page 2 of 10 ELECTRONIC COPY
Massachusetts Department of Environmental Protection -Provided byMassDEP:
Bureau of Resource Protection- Wetlands MassDEP File#:242-1577
Ll
eDEP Transaction#:534357
WPA Form 5-Order of ConditionsCity/Town:NORTH ANDOVER
Massachusetts Wetlands Protection Act M.G.L.c. 131, §400
a.square feet b.square feet c.square feet d.square feet
i
6. F"Land under Waterbodies and Waterways
a.square feet b.square feet c.square feet d.square feet
e.c/y dredged f cly dredged
7.r Bordering Land Subject to Flooding
a.square feet b.square feet c.square feet d.square feet
Cubic Feet Flood Storage
e,cubic feet f.cubic feet g,cubic feet h.cubic feet
8.F Isolated Land Subject to Flooding
a.square feet b.square feet
Cubic Feet Flood Storage
c.cubic feet d.cubic feet e.cubic feet f.cubic feet
9.r Riverfront Area
a.total sq.feet b.total sq.feet
Sq ft within 100 ft
c,square feet d.square feet e.square feet f.square feet
Sq f1 between 100-200 ft
g.square feet h.square feet i.square feet j.square feet
Coastal Resource Area Impacts:
Resource Area Proposed Permitted Proposed Permitted
Alteration AIteration Replacement Replacement
10.r Designated Port Areas Indicate size under Land Under the Ocean,below
11,l Land Under the Ocean
a.square feet b,square feet
a c/y dredged d.c/y dredged
12,F-Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below
13.r Coastal Beaches
a,square feet b.square feet c.c/y nourishment d.c/y nourishment
14.r Coastal Dunes
a.square feet b.square feet c.c/y nourishment d,c/y nourishment
15.F Coastal Banks
a.linearfeet b.linearfeet
16.r Rocky Intertidal Shores
a,square feet b.square feet
17.r Salt Marshes
a.square feet b.square feet c.square feet d,square feet
Page 3 of 10 *ELECTRONIC COPY
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection-Wetlands MassDEP File4:242-1577
eDEP Transaction 4:534357
f WPA Form 5 -Order of Conditions CityfI own:NORTx ArmovER I
Massachusetts Wetlands Protection Act M.G.L.c. 131, §40
i
18.r Land Under Salt Ponds
a.square feet b.square feet
c.c/y dredged d.c/y dredged
19.l Land Containing Shellfish
a.square feet b.square feet c.square feet d.square feet
Indicate size under Coastal Banks,inland Bank,Land Under the
20,r"Fish Runs Ocean,and/or inland Land Under Waterbodies and Waterways,
above
c.c/y dredged d.cly dredged
21.r Land Subject to Coastal Storm Flowage
a.square feet b,square feet
22.
r Restoration/Enhancement(For Approvals Only)
If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the square footage that has been
entered in Section B.5.c&d or B.17.c&d above,please entered the additional amount here.
a.square feet ofBVW b,square feet of Salt Marsh
23.
r'Streams Crossing(s)
If the project involves Stream Crossings,please enter the number of new stream crossings/number of replacement stream crossings.
a.number of new stream crossings b.number of replacement stream crossings
Co General Conditions Under Massachusetts Wetlands Protection Act
The following conditions are only applicable to Approved projects
I. Failure to comply with all conditions stated herein,and with all related statutes and other regulatory measures,shall be deemed
cause to revoke or modify this Order.
2. The Order does not grant any property rights or any exclusive privileges;it does not authorize any injury to private property or
invasion of private rights.
3. This Order does not relieve the pennittee or any other person of the necessity of complying with all other applicable federal,
state,or local statutes,ordinances,bylaws,or regulations.
4. The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following
apply:
a.the work is a maintenance dredging project as provided for in the Act;or
b.the time for completion has been extended to a specified date more than three years,but less than five
years,from the date of issuance.If this Order is intended to be valid for more than three years,the
extension date and the special circumstances warranting the extended time period are set forth as a
special condition in this Order.
5. This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the
issuing authority at least 30 days prior to the expiration date of the Order.
6. If this Order constitutes an Amended Order of Conditions,this Amended Order of Conditions does not exceed the issuance
date of the original Final Order of Conditions.
Page 4 of 10 *ELECTRONIC COPY
Massachusetts Department of Environmental Protection Provided by MassDEP:
y Bureau of Resource Protection-Wetlands MassDEP File#:242-1577
WPA Form 5 - Order of Conditions cDEP Transaction 4:534357
City/I'own:NORT11 ANDOVER
Massachusetts Wetlands Protection Act M.G.L.c. 131, §40
7. Any fill used in connection with this project shall be clean fill.Any fill shall contain no trash,refuse,rubbish,or debris,including
but not limited to lumber,bricks,plaster,wire,lath,paper,cardboard,pipe,tires,ashes,refrigerators,motor vehicles,or parts of
any of the foregoing.
8, This Order is not final until all administrative appeal periods from this Order have elapsed,or if such an appeal has been taken,
until all proceedings before the Department have been completed.
9. No work shall be undertaken until the Order has become final and then has been recorded in the Registry of Deeds or the Land
Court for the district in which the land is located,within the chain of title of the affected property.In the case of recorded land,
the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the
proposed work is to be done.In the case of the registered land,the Final Order shall also be noted on the Land Court
Certificate of Title of the owner of the land upon which the proposed work is done.The recording information shall be submitted
to the Conservation Commission on the form at the end of this Order,which form must be stamped by the Registry of Deeds,
prior to the commencement of work..
10. A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearing the words,
"Massachusetts Department of Environmental Protection"
[or'MassDEP"]
File Number:"242-1577"
11. Where the Department of Environmental Protection is requested to issue a Superseding Order,the Conservation Commission
shall be a party to all agency proceedings and hearings before Mass DER
12, Upon completion of the work described herein,the applicant shall submit a Request for Certificate of Compliance(WPA Form
8A)to the Conservation Commission.
13. The work shall conform to the plans and special conditions referenced in this order,
14. Any change to the plans identified in Condition#13 above shall require the applicant to inquire of the Conservation Commission
in writing whether the change is significant enough to require the filing of a new Notice of Intent,
15. The Agent or members of the Conservation Commission and the Department of Environmental Protection shall have the right to
enter and inspect the area subject to this Order at reasonable hours to evaluate compliance with the conditions stated in this
Order,and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that
evaluation.
16. This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this Order and
to any contractor or other person performing work conditioned by this Order.
17. Prior to the start of work,and if the project involves work adjacent to a Bordering Vegetated Wetland,the boundary of the
wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging.Once in place,the wetland
boundary markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission.
18. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetation or
other means.At no time shall sediments be deposited in a wetland or water body.During construction,the applicant or hiAer
designee shall inspect the erosion controls on a daily basis and shall remove accumulated sediments as needed.The applicant
shall immediately control any erosion problems that occur at the site and shall also immediately notify the Conservation
Commission,which reserves the right to require additional erosion and/or damage prevention controls it may deem necessary.
Sedimentation barriers shall serve as the limit of work unless another limit of work line has been approved by this Order.
NOTICE OF STORMWATER CONTROL AND MAINTENANCE REQUIREMENTS
19. The work associated with this Order(the"Project")is(1) 1— is not(2)E✓ subject to the Massachusetts Stormwater Standards.
If the work is subject to Stormwater Standards,then the project is subject to the following conditions;
a) All work,including site preparation,land disturbance,construction and redevelopment,shall be implemented in accordance
with the construction period pollution prevention and erosion and sedimentation control plan and,if applicable,the
Stormwater Pollution Prevention Plan required by the National Pollutant Discharge Elimination System Construction General
Permit as required by Stormwater Standard 8.Construction period erosion,sedimentation and pollution control measures and
best management practices(BMPs)shall remain in place until the site is fully stabilized.
Page 5 of 10 *ELECTRONIC COPY
i
Massachusetts Department of]Enrvironmental Protection Provided by MassDEP:
Bureau of Resource Protection-Wetlands MassDEP File#:242-1577
WPA Form. 5 -Order of Conditions eDEP Transaction#:534357
Massachusetts Wetlands Protection Act M.G.L.c. 13I,§40
L1f1
Crty/Town:NOR1H ANDOVER
b) No stormwater runoff may be discharged to the post-construction stormwater BMPs unless and until a Registered
Professional Engineer provides a Certification that:i.all construction period BMPs have been removed or will be removed by
a date certain specified in the Certification.For any construction period BMPs intended to be converted to post construction
operation for stormwater attenuation,recharge,and/or treatment,the conversion is allowed by the MassDEP Stormwater
Handbook BMP specifications and that the BMP has been properly cleaned or prepared for post construction operation,
including removal of all construction period sediment trapped in inlet and outlet control structures;ii.,as-built final construction
BMP plans are included,signed and stamped by a Registered Professional Engineer,certifying the site is fully stabilized;W.
any illicit discharges to the stormwater management system have been removed,as per the requirements of Stormwater
Standard 10;iv.all post-construction stormwater BMPs are installed in accordance with the plans(including all planting
plans)approved by the issuing authority,and have been inspected to ensure that they are not damaged and that they are in
proper working condition;v.any vegetation associated with post-construction BMPs is suitably established to withstand
erosion.
c) The landowner is responsible for BMP maintenance until the issuing authority is notified that another party has legally assumed
responsibility for BMP maintenance.Prior to requesting a Certificate of Compliance,or Partial Certificate of Compliance,the
responsible party(defined in General Condition 19(e))shall execute and submit to the issuing authority an Operation and
Maintenance Compliance Statement("O&M Statement")for the stormwater BMPs identifying the party responsible for
implementing the stormwater BMP Operation and Maintenance Plan("O&M Plan")and certifying the following:L)the O&M
Plan is complete and will be implemented upon receipt of the Certificate of Compliance,and ii.)the future responsible parties
shall be notified in writing of their ongoing legal responsibility to operate and maintain the stormwater management BMPs and
implement the Stormwater Pollution Prevention Plan.
d) Post-construction pollution prevention and source control shall be implemented in accordance with the long-term pollution
prevention plan section of the approved Stormwater Report and,if applicable,the Stormwater Pollution Prevention Plan
required by the National Pollutant Discharge Elimination System Multi-Sector General Permit.
e) Unless and until another party accepts responsibility,the landowner,or owner of any drainage easement,assumes
responsibility for maintaining each BMP.To overcome this presumption,the landowner of the property must submit to the
issuing authority a legally binding agreement of record,acceptable to the issuing authority,evidencing that another entity has
accepted responsibility for maintaining the BMP,and that the proposed responsible party shall be treated as a permittee for
purposes of implementing the requirements of Conditions 19(f)through 19(k)with respect to that BMP.Any failure of the
proposed responsible party to implement the requirements of Conditions 19(f)through 19(k)with respect to that BMP shall
be a violation of the Order of Conditions or Certificate of Compliance.In the case of stormwater BMPs that are serving more
than one lot,the legally binding agreement shall also identify the lots that will be serviced by the stormwater BMPs.A plan and
easement deed that grants the responsible party access to perform the required operation and maintenance must be submitted
along with the legally binding agreement.
f) The responsible party shall operate and maintain all stormwater BMPs in accordance with the design plans,the O&M Plan,
and the requirements of the Massachusetts Stormwater Handbook.
g) The responsible party shall:
1.Maintain an operation and maintenance log for the last three(3)consecutive calendar years of inspections,repairs,
maintenance and/or replacement of the stormwater management system or any part thereof,and disposal(for disposal the
log shall indicate the type of material and the disposal location);
2.Make the maintenance log available to MassDEP and the Conservation Commission("Commission")upon request;and
3.Allow members and agents of the MassDEP and the Commission to enter and inspect the site to evaluate and ensure
that the responsible party is in compliance with the requirements for each BMP established in the O&M Plan approved by
the issuing authority.
h) All sediment or other contaminants removed from stormwater BMPs shall be disposed of in accordance with all applicable
federal,state,and local laws and regulations.
i) Illicit discharges to the stormwater management system as defined in 310 CMR 10.04 are prohibited.
j) The stormwater management system approved in the Order of Conditions shall not be changed without the prior written
approval of the issuing authority.
Page 6 of 10*ELECTRONIC COPY
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection-Wetlands MassDEP File#:242-1577
WPA Form 5- Order of Conditions eDEP Transaction#:534357
Massachusetts Wetlands Protection Act M.G.L.c. 131,§40 CityClown:NORTHANDOVEI2
k) Areas designated as qualifying pervious areas for the purpose of the Low Impact Site Design Credit(as defined in the
MassDEP Stormwater Handbook,Volume 3,Chapter 1,Low Impact Development Site Design Credits)shall not be altered
without the prior written approval of the issuing authority.
i) Access for maintenance,repair,and/or replacement of BMPs shall not be withheld.Any fencing constructed around
stormwater BMPs shall include access gates and shall be at least six inches above grade to allow for wildlife passage.
Special Conditions:
SEE ATTACHED,
a
Page 7 of 10*ELECTRONIC COPY
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection-Wetlands MassDEP File#:242-1577
L7, --1 WPA Form 5 -Order of Conditions eDEP Transaction#:534357
T Massachusetts Wetlands Protection Act M.G.L.e. 131,§40
City/rown:NORTH ANDOVER
A Findings Under Municipal Wetlands Bylaw or Ordinance E
1. Is a municipal wetlands bylaw or ordinance applicable?r Yes r No
2. The Conservation Commission hereby(check one that applies):
a. F- DENIES the proposed work which cannot be conditioned to
meet the standards set forth in a municipal ordinance or bylaw
specifically:
1.Municipal Ordinance or Bylaw 2,Citation
Therefore,work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides
measures which are adequate to meet these standards,and a final Order or Conditions is issued.Which are necessary to
comply with a municipal ordinance or bylaw:
E
r APPROVES the proposed work,subject to the following
additional conditions.
1.Municipal Ordinance or Bylaw NORTH ANDOVER 2,Citation CHAPTER 178
WETLANDS BYLAW
3. The Commission orders that all work shall be performed in accordance with the following conditions and with the Notice of
Intent referenced above.To the extent that the following conditions modify or differ from the plans,specifications,or other
proposals submitted with the Notice of lnten�the conditions shall control
The special conditions relating to municipal ordinance or bylaw are as follows:
SEE ATTACHED.
Page 8 of 10 ELECTRONIC COPY
NUPI� Massa0husetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection-"'Wetlands MassDEP File#:242-1577
WPA Form 5 - Order of Conditions eDEP Transaction 4:534357
Massachusetts Wetlands Protection Act M.G.L.c. 131,§40 City/Town:NORTH ANDOVER
E. Signatures
This Order is valid for three years from the date of issuance,unless otherwise specified
pursuant to General Condition 44,If this is an Amended Order of Conditions,the Amended 1.Date of Original Order
7 Order expires on the same date as the original Order of Conditions.
Please indicate the number of members who will sign this form.This Order must be signed by
F-Num-—b—er-rof-S i gric is
a majority of the Conservation Commission.
The Order must be mailed by certified mail(return receipt requested)or hand delivered to the applicant.A copy also must be mailed
or hand delivered at the same time to the appropriate Department of Environmental Protection Regional Office,if not filing
electronically,and the property owner,if different from applicant.
Signatures:
F by hand delivery on y c,I red r urn receipt requested,on
Date Date
F. Appeals
The applicant,the owner,any person aggrieved by this Order,any owner of land abutting the land subject to this Order,or any ten
residents of the city or town in which such land is located,are hereby notified of their right to request the appropriate MassDEP
Regional Office to issue a Superseding Order of Conditions,The request must be made by certified mail or hand delivery to the
Department with the appropriate filing fee and a completed Request for Departmental Action Fee Transmittal Form,as provided in
310 CMR 10,03(7)within ten business days from the date of issuance of this Order.A copy of the request shall at the same time be
sent by certified mail or hand delivery to the Conservation Commission and to the applicant,if he/she is not the appellant.
Any appellants seeking to appeal the Departments Superseding Order associated with this appeal will be required to demonstrate prior
participation in the review of this project.Previous participation in the permit proceeding means the submission of written information to
the Conservation Commission prior to the close of the public hearing,requesting a Superseding Order,or providing written infori-nation
to the Department prior to issuance of a Superseding Order.
The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not
contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act(M,G,L.c.131,§40),and is
inconsistent with the wetlands regulations(3 10 CMR 10,00).To the extent that the Order is based on a municipal ordinance or bylaw,
and not on the Massachusetts Wetlands Protection Act or regulations,the Department has no appellate jurisdiction.
Page 9 of 10 *ELECTRONIC COPY
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection-Wetlands MassDEP File,#:242-1577
WP.A Form 5 W Order of Conditions eDEP Transaction#:534357
City/Town:NORTH ANDOVER
Massachusetts Wetlands Protection Act M.G.L.c. 131,§40
Lilt
G. Recording Information
This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located,
within the chain of title of the affected property.In the case of recorded land,the Final Order shall also be noted in the Registry's
Grantor Index under the name of the owner of the land subject to the Order.In the case of registered land,this Order shall also be
noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions.The recording information on
this page shall be submitted to the Conservation Commission listed below.
NORTH ANDOVER
Conservation Commission
Detach on dotted line,have stamped by the Registry of Deeds and submit to the Conservation Commission.
....................................................................................
To: ................. . ...
NORTH ANDOVER
Conservation Commission
Please be advised that the Order of Conditions for the Project at;
LOT B-ABUTTING 72 GREAT POND ROAD 242-1577
Project Location MassDEP File Number
Has been recorded at the Registry of Deeds of:
County Book Page
for:
Property Owner TOM ZAHORUIKO
and has been noted in the chain of title of the affected property in:
Book Page
In accordance with the Order of Conditions issued on,
Date
If recorded land,the instrument number identifying this transaction is:
Instrument Number
If registered land,the document number identifying this transaction is:
Document Number
Signature of Applicant Rev.V112010
Page 10 of 10 ELECTRONIC COPY