DATE: JUly 2, 2 1 9
RE: Letter ofNoncompliance—Notice of Septic System Failure
ADDRESS,: 250 Abbott Street
n,e o,
T avi Solo
f
f
The Not th , : dover Health Department has received n reviewed the Title Inspection Repo) at was
generatedfr rn theC60 f theseptic system t 250 Abbott Street. Y �� inspector•has deter mine 1.
1
that your tic system rll ng to protect public health or the environment according to the Title 5 of the
State Sanitary Code.
Please be advised that you have two years from.the date of the Title inspection to completethe
necessary upgrade work. To begin the r ce s you are required to retain the services of a Massachusetts
licensed professional engineer P. .) or Massachusetts registered sanitarian .S. to design a new septic
system in, om ll r c with Title 5 and'North Andover Board of Health regulations. Th forth Andover
I-Jealth Department can provide you with det ls,regarding the local process.
1
It is recommended that your hire a septic ha,uler to periodically pump your septic tank until h time
repIair can e completed.The Board thanks you for your willingnessto hale protect the environment,,the
ground water and public health. Please do not hesitate to call the health Department wffi t the number
below if you have any questions.
Sincerely,
Brian J.LaGr,asse, CEI IT
, w
i
Director of Pubfic health
i
Encl., P.E. list
installers list
Guide to Septic Installation,Process
Cc; ells
i
Fags I of 1,
Nofth Andover Health e a�tme t", ,. Main Street North n A 0,18,45
Phone: 7 *6 9,5 Fax-, 9 . 8. 5
w
Town of North And,oveir,Health e amen Gulde to the S tic I ,9 a l i n
Process
How to go ftom a I itte 5 ins e rei)aifinLy or re lacingseptic system:
f
If
u need a Septic System Inspection done you need to hire a licensed
1
Title 5 Isectots ate ficens the state of Massachusetts and .lso petmitted to
work in, the Towti of NorthAtidover. A list of current m' spectors can be found
.nor h, : veri,ii . ) wealth Department section.
;e Inspector will perform tee assessment and then subnait to Sep Systems. Inspection
repot to the Health Department widw-i 30 days with a checkinade out to the Town o
No-tth.,Andover in the amount of$50.00.The result wffl be either"Pass", "Fair", or
"Conditional Pass".
In-the event that you have a Title 5 Inspection don.e and you receive a :Pass, there is no;
further on requilled of you at this time. "17he reportw.ill be submitted to the Health
Departrnent,office w 30 days of,completion.and will become public record.
In to event that you haveTide 5 Inspection.done and you receive a Cotidi Pass
(winkh means the systern will i i i .is p thefollowing steps U
followed;
The homeowner des a Septic Disposal,,l Works n t SDWI) peria ittedffie
Town of North.Andover. The list of SDWI"s,is posted on the Town off'North
Andover website in the Health Department section or is availablet the Health
Departmentoffice. NOTE: if the Inspector is also a permitted sep `c installer
North Andover,,he o- she can perform installation provided he gives the
homeown,er a ffill.list of installers permitted North Andover.
The hired n l.le sub iis n application,with a fee,of$175 for a com on n
r l�. �� , ream*and the application � r -w d and permit i generated. The
instal er is o re e that the r is ready for pickup. ���� d a
component repair, such as a pipeoj:a tank, design plans gerierally do not need o be
u `t ed,ex�cept M' the case where placementis different. If plansare needed see
Design Plans bow
n the event that y u have a Tide 5 Inspection done, and youteceive,a Failing status report,
to following steps must be followed:
w
Soil Tesfing,
An application o schedule soil and,percolation testing in-List be completed ley an.
engineer,, sanitarian or soil evaluator that you.Vie,and a fee o (or 585 for
undevelopedlots) must be attached, made payable to to Town, of Not Andover.
jWy 2016
Arequest is then sent to the Town's septic consultant to schedule soil and
p ercolation 'Les ting.The soil testing usually to place videtAvo weeks.
The consultant notifies die it evaluator when the testing Nvill take place.
Soil testing is completed and results are sent to the Flealth Department and eng-Lineer.
De-si n,Plans
> The homeowner hires,an engineer or,sam-tarianto design a septic system and
prod-Lice a plan reflectu"Ig die placement of tie system, eand all pertinent information.
> The septic plan is submitted to the Health Department wit fi anapplication and a fee
of$275.00., This fee i-ticludes the ot,191nal-review as well as, a re-yeview. If an
tta
there is a$125 plantesubmil fee., Pl an s w fl sent i be by
additional review 1"s, needed, I
1-1-lail, for review,however if the engineer or samitarian has provided the Health
Department with a PDF copy oftie plan, the acconapanying paperwork and die
PDT" are emailed that day to, out Septic Consultant.
> The Health Department strives to complete reviews of design plans,widmin three
weeks" time. Maximurn,time allowed,is 45 days though this is rarely needed.
> Once teviewed,, an approval or disapproval.letwt is generated and sent.to the
horne ovine r and,engineer of seqn."itaartain. If approved., the homeowner can.t-Li-L-c an
installer to build th,e, approved septic system as described below. If disapproved, th.e
enghwer or sanitarian must add tess die rr-dssing or deficlent ctiteria, and sub.mit a
revised an for i:e-.review.
> If site constraints are such that flae plan,cannot comply wiffi die standards in the,
-regulations and requires a variance request from those standards to be,reviewed, the
engineer,or samt-ari,an will note that on, the plan and.sae a request in,writing to be
present at an ups oining ineeting of the North Andove.i. Board of Health. Once the
plan is sub s tantially apro vableat will.be,placed on the next await ab,le monit-dy B O.H
meeting.
> Some septic stern projects will require review and approval froin other'Town
departments or boards in addition to the Health Department and Board of Healt.11.
If needed this is usually ftoin the Conservation Conumission if the work is , roposed
p . .
tt learn more,about t1- s frona your engm* eer or sanitretrian.
m their)urisdic 'on. 'Y'ou can, -1i
or the Conseivadon Commission office.
Rep.alr,ZReplaccent
> The homeowner must hi-re a Septic Disposal W'o,:r,',k,s Installer permitted by the Town
of Noyd-i Andover. the list of'SDWI's is posted on the Townes we to or paper
copies are available at the Health, Department office.,
July 2016
r
I'm:fie hired ' �subinits an application wife a :fee of$35 75 for work a
"
in di idd icomponent o tY and the,application is reviewed n rmit i
generated. e parmt,and a copy of ffie septic plan approval letter are stapled t
to approved steeped plans, and the installer i notified by phone that t the plan n,
permit .r Weedy for pickup.
The Installer Will have a,pre-construction meeting with Health Department Staff t
review site-specific issues.
The installer might need to acquire additional pertnits for work dependingn what i
proposed to be built at your property. These mightinclude electrical.per it ` r any
pumps i .rbuilding. permits for certain wells., or trench pei .-iit for excavation..
u M' t et should be able to guide you thtough the perinits needed, as can the
various Town Department who might be vied.
"It he Installer NvY have their wore overseen by dealt Department staff and the
Town's outside consultant. Here e is a surninaq of the i� ecti n process.
Tank I n i —Installer shall request inspection to c .fit- .the location
the excavation and to ,shoe a,minimuln of 6 inches, of stone, on the bottom of the
tank hole. Also confirm, ed,wil.1 be the tank'tank's distance to to building and its
ol-lentationto tlae system.
Bottom of Bed (BOB — (if there i et .i �i .g wall it should done first)
'I he
installer shall inform tl e ie .ith Dept. the proposed ' g of installation.,The
installer maaal. t re e t the 'inspection of the,BOB, but does not have t be re e .t.
Inspector will respond in ai reasonable Vie. Excavation
needed for the installadon,, I load of septic sand shall,he available on site for
"
Multiple inspections may, are-inspection,
ite�� e o ` '
• the installer
puts "m a e ;west and, the site is, found not ready.
Final Inspection
inspection of the systee to c nfi compliance widi the approved ►lan and the
various re ulati . . The engineer r sanritati-an will call or en-lail.the Health
Department upon their satisfactory assessment of the,construction, after which the
installer calls to set up an,inspection time for the health de a,rt ne .t or t-hei-t outside
consultant to perform a final inspection. The liccn ed installer must he present for
this inspection. With-,a.pum system,a permit m u t be . ~e tilt-ough the
Building Department. All electrical work must be ready and able to cause the pump
to work and, la to f neti n. '"I'he T gin will cont et tl e c : cult nt who wig..i
urn n1y�^act+1�„+ installer.
a
Final Grade Installer mustrecluest an 'inspection n when all grading,is complete.
This includes de lam and seeding of the septic areas,. The installer does not have to, be
on site. Note, that the Final Grade 'inspection cannot be completed when, the system
is covered in snow. If the horneowner does not .nt seeding to be placed on top of
to septic system at the e of filial l ade m ectj n they may writ in wiiting
t .eit- ire to waive th,is requirement.
July 2016
Almost Th,erel,
Once the in,spec,
tion process is complete, a Certification of Installation Form.
A
needs to be submitted, signed and at by the engineer or samitarian) anu
the Installer. TI-ds doc,wnent certifies tbat the installation,was completed per the
plan and regulations.
In addition, an As-Bt-tilt Plan,which is t he final,plan the septic systern, must be
sub,nutted with, the certifi cation forin.
Once the above itein,s are received,a Certificate of Compliance is issued by the,
Health Department to, the property owner.
The process is,now, coMpleter We appreciate your understanding of d ie time and
various processes involved., At the end,we hope you xvill agree that the To of
North And over,you as, a,resident, and our I-lautual envirom-nent are all being bettered,
by you'undertaldng the above steps. If you have any questions, about these Matters
please do not hesitate to contact the,health dePartinent at 978-688-9540 or
he,eil�thdel:)t@northandov,ei.-i-n,a.gov
july,2016
05101/2019
PERMITTED SEPTIC ,
INSTALLERS-
RENEWED North Andover-2019
Name Affiliation Phone Street city. Permit#
Bill Hall Bill Hall Inc. 978-689-3711 4 Viviana St Methuen,MA 0 1844 41884
Daniel A. Giard Daniel A. Glary, Owner 978-686-7653 130 A.Appleton St North-Andover,MA 0 184 5- 40876
Dave Maynard Maynard Construction 978-375-7228 22 Dustin Road Cntr Barnstead,NE 03225 48162
David Chandler Sewer Works 978-692-4410 26 Hillside Ave Westford,MA 0 18 8 6 41955
David V. Zaloga,Jr. nway Construction,Inc. 3- 2- 79 Newfields Road Exeter,NH 03 833 41501
Dean rna-n Dean Dynan 508-726-9935 2 Suntaucr Street Lynnfield,MA 0 1940 42506
James Boraczek Boraczek Septic&Drain 978-479-5236 4 Hazel Drive Hampstead,NH 03 841 40683
James H. Currier James H. Currier Const. 978-774-6685 131 Forest Street Middleton,MA 01949 40939
James Kellett Kellett Excavating LLC 781-953-7146 420 Summer Street Lynnfield,NIA 0 1940 4'333 5 8
Jason it J. ite Contarcting 97&604-0860 3 Murray Hill Lane Andover, MA 0 18 10 41243
John Chongris Woodhill Contracting 508-509-9442 129 Haggetts Pond Rd Andover,MA 0 18 10 41853
John L.DiVincenzo J&S Dev/Stewart Septic 978-372-7471 58 South Kimball St Bradford,MA 0 183 5 41165
John Soucy Broadway Septic Design 603-458-5883 78 N Broadway Salem, 41689
John T. Shaw 'Wildwood Excavation 978-815-7411 233 Holt Rd Andover,MA 0 18 10 41930
Joseph Sur ianello Ralph Sur ianello Inc. 978-458-9117 51 Silva Lane Dracut,MA 0 182 6 41279
Joseph Watson JW Watson Jr-Excavatina 978-475-3262 43 Lowell junction Road Andover,MA 0 18 10 41536
Matthew Manning Dirt Pro Excavation 603-329-5077 10 Bricketts Mill Rd Ste C Hampstead,NH 03 841 40718
Michael WE Reillv F.P. Reilly and Sons Inc. 978-475-1237 206 Andover St#I I Andover,MA 0 18 10 40678
Peter Breen Peter Breen Excavating 978-687-7774 770 Boxford St North Andover,,MA 0 1845 41288
Robert Daigle Robert Daigle Construction 978-423-6933 14 Coffin Ave Haverhill,MA 01830 42431
Robert Herrick Wind River 978-833-7924 46 Lizotte Drive Marlboro,MA 01752
- 41220
Rocci Lucia Frank DeLucia&Sons 603-974-1480 119 Newton Rd R Plaistow,,NH 03865 41281
Serge Beaulieu
'Roadway Excavators Inc 603-235-3740 PO Box 227 Deny,NH 03038 44260
Timothy Quinlan Quinlan&Rand Builders 978-457-0528 34 Trinity Crt North Andover, 1845 42023
Todd Bateson lBateson Enterprises, Inc. 978-815-2703 111 Argilla Road Andover, MA 0 18 10 41417
Warren Pearce.,Jr. Pearce Construction 978-664-5264 196 Park St North Reading,NLA 0 18 64 41365
William Rode nhiser Rodenhiser Excavating 508-429-9553 70 Bartzak,Drive Holliston,MA 01746 40622
William T. Sawver Arco Excavators Inc. 603-642-8910 45 Little River Rd Kinston,NH 03 848 40727
Health Department 20.19 Engineers and Saniftarians LIST
The namesbelow are a sample of several MA P ' , or Sanitarlans who have ,o
business in North Andover the past 3 years,.
Christiansen & Sergi Sullivan Engineering Grou,p, LLC
Phil Christiansen, Jack Sullivan
Dan, O'Connell P.O. Box 2004
1 Summer Street Woburn, MA 0 1
978-373-0,310
Clayton Morin,P.E. Winiams & Sparages
Clayton Morin Cods Sparages
Engineering & Surveying Services Greg wl .mt�
70 Bailey Court 189 North Main St. Site 101
UR Engineering S ids i h Designs
Luke Roy Douglas J. Smith
234 ParkSt. 98 Whittington Strut
No. Reading, MA 0 18 64 Manchester.,NH
Merrimack t:�ngineering Ranger Engineering
J
Vladimir Nemcb nok Ben Osgood, Jr.
66 Park Street 13 Breech Street
1
The,Morin-Cameronfir , Inc. Joseph J. Serwatka, P.E.
MorinJohn P.O. Boy 101.6
66 Elm Street North Andover,MA 0 18 4 5
Danvers, MA 0 1923 9 8-3 1 -- 31
9178-777-8586 Loeserwatka@)CoMcastnet