HomeMy WebLinkAboutConstruction Notes - Consultant Review - 40 CEDAR LANE 8/1/2019 _S�TTtED." .
�yN
'Pp�RA D A.�-
North Andover Health Department
Community and Economic Development Division
ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES
LOCATION INFORMATION
ADDRESS: 40 Cedar Lane MAP: 106.A LOT: 0141
INSTALLER: John L. DiVincenzo
DESIGNER:
PLAN DATE:
BOH APPROVAL DATE ON PLAN:
D-Box Repair 7/30/2019
INSPECTIONS
TANK INSPECTION:
DATE OF BED BOTTOM INSPECTION:
DATE OF FINAL CONSTRUCTION INSPECTION:
DATE OF FINAL GRADE INSPECTION: j
DISTRIBUTION-BOX
® Installed on stable stone base
® H-20 D-Box
❑ Inlet tee (if pumped or >0.08'/foot)
® Hydraulic cement around inlet & outlets
® Observed even distribution
® Speed levelers provided (not required) j
® Schedule 40 PVC Pipe
Comments:
Even Distribution — ok B.L.