Loading...
HomeMy WebLinkAboutConstruction Notes - dbox repair 4/10/2014 - Consultant Review - 45 TUCKER FARM ROAD 8/2/2019 � vz�L�vTl� it North Andover Health Department Community Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 45 Tucker Farm Road MAP: LOT: INSTALLER: Todd Bateson DESIGNER: none D-BOX ONLY PLAN DATE: none BOH APPROVAL DATE ON PLAN: none INSPECTIONS TANK INSPECTION: D-Box only 4/10/14 DATE OF BED BOTTOM INSPECTION:x DATE OF FINAL CONSTRUCTION INSPECTION: x DATE OF FINAL GRADE INSPECTION: SITE CONDI IONS ❑ Contractor reports any changes to design plan ❑ Existing septic tank properly abandoned ❑ Internal plumbing all to one building sewer ❑ Topography not appreciably altered Comments: SEPTIC TANK ❑ Building sewer in continuous grade, on compacted firm base ❑ Cleanouts per plan ❑ Bottom of tank hole has 6" stone base ❑ Weep hole plugged ❑ 1500 gallon tank has been installed H-10 loading ❑ Monolithic tank construction ❑ Water tightness of tank has been achieved by visual testing ❑ Inlet tee installed, centered under access port I _1 y ❑ Outlet tee installed, centered under access port (gas baffle/effluent filter) ❑ inch cover to within 6" of finish grade installed over one access port ❑ Hydraulic cement around inlet & outlet Comments: PUMP CHAMBER ❑ Bottom of tank hole has 6" stone base ❑ Weep hole plugged ❑ 1500 gallon Pump Chamber installed ❑ H-10loading ❑ Monolithic tank construction ❑ Inlet tee installed, centered under access port ❑ Pump(s) installed on stable base ❑ Alarm float working ❑ Pump On/Off floats working ❑ Separate on/off floats ❑ Drain hole in pressure line ❑ cover at final grade installed over pump access port ❑ Water tightness of tank has been achieved by testing ❑ Hydraulic cement around inlet & outlet Comments: CONTROL PANEL ❑ Alarm & Pump are on separate circuits ❑ Alarm sounds when float is tripped ❑ Location of control panel: basement ❑ Alarm signal located inside: basement Comments: DISTRIBUTION-BOX Installed on stable stone base H-20 D-Box ❑ Inlet tee (if pumped or >0.08'/foot) ❑ Hydraulic cement around inlet & outlets Observed even distribution ❑/ Speed levelers provided (not required) z 0 Schedule 40 PVC Pipe Comments: