Loading...
HomeMy WebLinkAboutSeptic Approval Letter - Correspondence - 997 DALE STREET 8/9/2019 • North Andover Health Department Community and Economic Development Division August 9, 2019 North Andover Boxford Realty Trust Byron C. Leonhard 997 Dale Street North Andover, MA 01845 Re: Subsurface Sewage Disposal System Plan for 997 Dale Street (Man 104A,Parcel 10) The proposed wastewater system design plan for the above site dated June 17, 2019 with a final revision date on July 22, 2019 and received on July 30, 2019 has been approved. The design plan has been approved for use in the construction of an upgraded on-site septic system for a five (5) bedroom home with a maximum of eleven(11)total rooms utilizing a septic tank, distribution box and leaching trenches. This design plan approval is valid until August 9, 2021. During this time, a licensed septic system installer must obtain a permit and complete this work, and a Certificate of Compliance be endorsed by the installer, designer and the Town of North Andover. In the event an imminent health problem, such as sewage backup into the dwelling is occurring,the North Andover Board of Health may reduce the time period for which this plan is valid. This approval is also subject to the following conditions: 1. If site conditions are found in the field to be different from those indicated on the design plan and/or soil evaluation, the originally issued Disposal System Construction Permit is void, installation shall stop, and the applicant shall reapply for a new Disposal Systems Construction Permit(310 CMR 15.020(1)). Page 1 of 2 North Andover Health Department 120 Main Street North Andover, MA 01845 Phone: 978.688.9540 Fax: 978.688. 9542 997 Dale Street August 9, 2019 2. It is the responsibility of the applicant and/or the applicant's septic system designer, septic system installer or other representative.to ensure that all other state and municipal requirements are met. These may include review by the Conservation Commission, Zoning Board, Planning-Board, Building Inspector, Plumbing Inspector and/or Electrical Inspector. The issuance of a Disposal System Construction Permit shall not construe and/or imply.compliance with any of the aforementioned requirements. Please feel free to contact the office with any questions you may have. We look forward to working with you to obtain a wastewater treatment and dispersal system which will be in compliance with all regulations and assure protection of public health and the environment of North Andover. Sincerely, Brian J. LaGrasse, CEHT Director of Public Health Encl. Installers list cc: Thorsen Akerly, RS File Page 2 of 2 North Andover Health Department 120 Main Street North Andover, MA 01845 Phone: 978.688.9540 Fax: 978.688. 9542