HomeMy WebLinkAboutNew Construction of a Complete Septic Soil Absorption System - Certificate of Compliance - 345 BOSTON STREET 1/11/2007 f tAORTF/ q
O eo i6,
�00
� 6
0
n0
O cec .0 w 1'
�4SSAc us���h
PUBLIC HEALTH DEPARTMENT
Community Development Division
CE1' TIq7jCA22 Off' Cogy" 'GI.AjrVCE
As of.-
January 11, 2007
9iis 1r to certzjy- that the indi'viduafsubsurface dl posaf system receiveda
S WSTAC'T01RT IM 1�ECTION of the:
New Construction of a Complete
Septic Soil.,4 6sorption System
(By.
Charles R. Todd
345 (aka Got 12) Boston Street
jYorthAndover, 914A 01845
The Issuance of this certificate shaft not 6e construed as a guarantee that the system wiff
function satisfactorify.
Swan 7 Sawyer
1Tu6Cic lfeafth Director
1600 Osgood Street,North Andover,Massachusetts 01845
Phone 978.688.9540 Fax 978.688.8476 Web www.townofnorthandover.com