Loading...
HomeMy WebLinkAboutConstruction Notes - Consultant Review - 487 WINTER STREET 9/4/2019 North Andover Health Department Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 487 Winter Street MAP: 104.A LOT: 0071 INSTALLER: Todd Bateson 978-815-2703 DESIGNER: Joe Serwalka 978-314-8731 PLAN DATE: 6/5/2019, revision 6/10/2019, 6/21/2019, 7/3/2019 BOH APPROVAL DATE ON PLAN: 7/10/2019 INSPECTIONS TANK INSPECTION: 7/29/2019 DATE OF BED BOTTOM INSPECTION: DATE OF FINAL CONSTRUCTION INSPECTION: 8/5/19 DATE OF FINAL GRADE INSPECTION: 9/4/2019 SITE CONDITIONS Contractor reports any changes to design plan Existing septic tank properly abandoned Internal plumbing all to one building sewer Topography not appreciably altered Comments: SEPTIC TANK Building sewer in continuous grade, on compacted firm base Cleanouts per plan Bottom of tank hole has 6” stone base Weep hole plugged 1500 gallon tank has been installed H-10 loading Monolithic tank construction Water tightness of tank has been achieved by visual testing Inlet tee installed, centered under access port Outlet tee installed, centered under access port (effluent filter) 24 inch cover to within 6” of finish grade installed over one access port Hydraulic cement around inlet & outlet Comments: 8/5/19 – tanks with boots, no hydraulic cement needed PUMP CHAMBER Bottom of tank hole has 6" stone base Weep hole plugged 1000 gallon Pump Chamber installed H-10 loading Monolithic tank construction Inlet tee installed, centered under access port Pump(s) installed on stable base Alarm float working Pump On/Off floats working Separate on/off floats Drain hole in pressure line 24 cover at final grade installed over pump access port Water tightness of tank has been achieved by visual testing Hydraulic cement around inlet & outlet boots Comments: 8/5/19 – tanks with boots, no hydraulic cement needed CONTROL PANEL Alarm & Pump are on separate circuits Alarm sounds when float is tripped Location of control panel: basement Alarm signal located inside: basement Comments: DISTRIBUTION-BOX Installed on stable stone base H-20 D-Box Inlet tee (if pumped or >0.08’/foot) Hydraulic cement around inlet & outlets Observed even distribution Speed levelers provided (not required) Schedule 40 PVC Pipe Comments: SOIL ABSORPTION SYSTEM (General) Bottom of SAS excavated down to C soil layer, as provided on plan Size of SAS excavated as per plan Title 5 sand installed, if specified on plan 40 Mil HDPE barrier installed Laterals installed and ends connected to header (and vented if impervious material above) Elevations of laterals and chambers installed as on approved plan Retaining wall (boulder / concrete / timber/ block) Final cover as per plan Comments: 29’x40’ 7/29/2019 SOIL ABSORPTION SYSTEM (Gravel-less Chambers) Brand and Model of Chamber: Standard Quick 4 Low Profile Infiltrator Chambers Number of chambers per row: 7 Number of rows (trenches): 5 Comments: Total Chambers = 35 FINAL GRADE Loamed Seeded Cover per plan Comments: DOCUMENTS NEEDED Certification of Installation Form submitted By engineer and signed and dated by Engineer and installer As-Built Plan BM = 100. HR = 0.97 HI = 100.97 SYSTEM ELEVATIONS ROD AS-BLT INVERT DESIGN INVERT ELEVATION ELEV ELEV Building Sewer OUT 6.02 94.62 94.67 Septic Tank IN 6.28 94.36 93.88 Septic Tank OUT 6.69 93.95 93.53 Pump Chamber IN 6.77 93.87 93.50 Pump Chamber OUT 7.32 93.48 93.30 Distribution Box IN 4.10 96.70 96.60 Distribution Box OUT 4.12 96.52 96.43 Lateral 1 TOP 4.23 96.41 96.38 SKETCH PLAN