Loading...
HomeMy WebLinkAbout2006 ATM-AG-FORM 2 - #3-FINAL BYLAW-ARTICLE 10-CHAPTER 77-BUILDING CONSTRUCTION OF NORTH qti et.lEO is U p 0^yq9 9SSNCHUSES TOWN OF NORTH ANDOVER OFFICE OF THE TOWN CLERK 120 MAIN STREET NORTH ANDOVER, MASSACHUSETTS 01845 Joyce A.Bradshaw,CMMC Telephone(978)688-9501 Town Clerk Fax (978)688-9557 E-mail Bradshaw(dtownofnorthandover.com This is to certify that the following is the text of Chapter 77 Building Construction of the General Bylaws for the Town of North Andover as amended by Article 10 on June 6, 2006 of the Dissolved 2006 Annual Town Meeting for the Town of North Andover: Chapter 77 BUILDING CONSTRUCTION [HISTORY: Adopted by the Town of North Andover April 26, 1980 Annual Town Meeting,Article 50. Amendments noted where applicable.] [Amended June 6, 2006 Annual Town Meeting, Article 10-Pending AG Approval] § 77-1 Building Permit Fees, Exclusive of Mechanical and Utility Fees The following costs and fees shall be established by the Board of Selectmen: A. A per square foot cost factor which shall be used to estimate the cost of new construction. B. Fees for new construction at a rate per thousand dollars of estimated cost of construction or actual contract price, whichever is greater. C. Fees for additions, alterations and remodeling at a rate per thousand dollars based upon the estimated cost of construction. Estimated construction cost of additions, alterations and remodeling shall be the actual contract price. There shall be a minimum fee per permit to be established by the Board of Selectmen. D. Copies of the actual contract price shall be submitted with the Building Permit Application. E. Building permit fees shall be required for municipally owned buildings and structures. Building permit fees for buildings and structures wholly owned by the Town of North Andover may be waived, in whole or in part, only by the Board of Selectmen based on the Board's determination of the benefits accruing to the Town from such a waiver. In all cases, fees will be required for mechanical and utility permits. The Building Inspector shall periodically make a recommendation to the Town Manager relative to the adequacy of the fees, fines and assessments and the schedule relative thereto, as cited above, which may be adjusted by the Board of Selectmen as required. Until a new fee is established by the Board of Selectmen, the Town shall continue to charge the same fees that were in effect immediately prior to the effective date of this bylaw.