Loading...
HomeMy WebLinkAboutDated 10.29.2018, Rec 10.30.2018, BOH Approval 11.05.2018 pg 2 - Approved Septic Plan - 50 SAW MILL ROAD 9/13/2019 ELEV.(FT) IDTH-I DEPTH(IN) ELEV_(FT) DEPTH(IN) DTH-2 TOP OF PIT 96,2 00" TOP OF PIT=96.2 00" HOWA HOR,A/FILL FSL FSL -------------T__ 9 a v 10" 20"DIA lHORIZON Bwl ORIZON Bw CLEANDLIT COVER SL LS 13 PLACES 1 IF I 110 YR 6/S( 110 YR 65/ to I 26'' 26" 104 tow -LAYER C H-LAYER Lb M Y 6/41 LS Z 5 Y 6/41 102' PROR Ch COWIRS TO GRADE n y 4'SCH.40 PVC 0' Boulders /I- BOT.OF PIT=89-8'1 i 77" B0T_OF PIT 89,8 77" REIMISAL 0 NONE REFUISAL 0 NONE "MR MTMG 0 77' MAR WITIMG 0 NWE TAPER PLAN'VIEW N40TI-�ES 0 36-(ELEV=93-2) MOTTLES 0 35'(ELEV�93.3') �-lhlshcd Dvde Ovs- 6 MEW Min. 'TOP("20) -IINSPECTICW POPT jA TO aRADE PLASTIC r NOR: SUL EXANNATIONS(DTH-1.CiTH11-2)AND PERCOLATION TESTS(PT-1) PIPE SEALI, IT AL 1 WERE PERFORMED BY JOHN D.SULLIVAN M OF SULLIVAN ENGINEERING GROUP,LLC 4'DIA NLET H _1-3 ON jUY lZ MlS AND ETNESSED BY ISSAC ROWE OF MILL RIVER CONSULTING x 4'DIA OUTILET (CONSULTANT FOR THE T0-WNl OF NORTH ANDOVER 130H) 1 m,qaxv A ENI LIMID LEVEL i CERTFY TWAT W OCTOAR 115 1 TV=THE S91 EINUAHR DAMWAPM AFT5011-01 U.GRADE 2-2 r-y-ow MGM-0.sow BY RE DEPARTW6VT 0-fWWR&&ENTAL MOTCUCUAl AND 71-fAT THE ABOWE ANALYSIS WAS PESh-CCRUED BY JME CON957."ElvT=4 uE REQUIRED TRAINING,EXPERPISE,AND Ell-PERIUNCE DESCPIKI-Vr IN j10 C1JR t.0'17. T 57 Sm C ALL SUL DOWN M 734E C-Ps AM WNW 5 FMT 07 TE S077-FIV MINE C01 MD DA E. AN I 'S-0 BE REMOVED AND REPLACED i I 94 L_--l-I iScH WRIH CLEAN TIME 5 SAND 13�/SOIL DATA SHEA 6,cpUSHErj NOT TO SCAE STONE GNPUT7 ------7-7- WSE 4' ------------ DAM MST ND DEPTH BOT,ELEV. RATE 6'CRUSHED STONEIC10IMPACTIED BASE S ySTE N-4 PROF-ILE 43`-61" 9M, GIN MR! 1 SECTION VIEW — SCALe ln20'(H-OR -T-r- 1-�2�(VERTICAL,� WEWT PEF&OLATION I L:ST FRESUIL T S FEM NO.T_k-1500 H-20 13,135# X NUITS: 1,CONCRETE A,000 PSI MINIMUM AF=LER 28 DAYS 2,DESIGIN CONFORMS WrTH 310 CMR 15.00,DEP DESIGN ANALYSIS TITLE 5 RBGS.FOR SEPTIC TANKS_ SEPTIC D',NK(MONOLI T 1C) �CTU DAILY FLOW� (2%MIN) 500 CALLON ES,AAT-1 T 3,ALL REINFORCEMENT PER ASTIM C1227-93 4 BMRWM HOME(EXISING) 9"MINI.EXUUING TOP SOIL 1 r-2'OF 1/8"TO 1/2' BREAKOUT ELEV, 77-7r.-I 4 BMRMMS X 110 GPD/BEDROOM 440 GPD(STATE REG) 36 MAX,INCLUDING TOP SOL 1 MMSHED STONE 1 (HIGH SIDE) TANK VOLUME: DESIGN FLOW 440 GPD BREAKOUT ELEV. (LOW SIDE) 4 40 GPD X 200% 880 3PD 4"PERF,P,V,C, 3' ­"l--7E 'E-1 0 4 L[:4B A 8 (TITLE 5 MINIMUM)180 GAL<1,500 GAL LEACHING AREA REQUIRED: OMFCES 5% 11 PERCOLATION RATE�20 k4l P 1(CLASS 11) T 11 U T L E T LXkk-OZ3 GPWSF 3/4"DOUBLE WASHED STONE— (1) 4e !NLET !I LEACHING AREA REQUIRED: jesesenk IPLASTIC PIPE: SEA 10MAJ11 L 6' V 440 GPD/0,53 GPD/SF=830-18 SF LEACHING AREA PIRCMDED: LEACHMG BED:'18'WIDE X 47 LONG 846 S-F, 18' M6 SF>- 8W 18 SF REQUIRED TD PREVENT aRRIBUOUT: 2R 7'aC 3 LEACHING LINES TO BE PROWD DAILY FLOW CAPACITY: THE FINISHED SOE SLOPES 07 THE PROPOSED SOIL ABSORPTION SYSTEM PW%W LEA%WG 5ED AS&WOWN, 2 1/20--i CM6 SF X 0.53 GPD/SF)�448.4 GPD SHALL NOT BE STEEPER THAN 3:1, A MINNUN 15 FOOT HORIZONTAL SEPARARON ON SHEET OF 2 1 44&4 GPD>440 GPD REVD D,STANCE SHALL BE PEOVIDED BETWEEN THE SOIL ABSORPTION AREA AND PLA14 VIEW E3 COUTLET H-20 SECTION VIEW THE ADjACENT SIDE SLOPE. WEIGHT L EE A C VA 1 N'G' B LE D DEZ T Al L NOMS: ET E m M NOT TO SCIE 1 CONCRETE:4,000 PSI MINIMUM AP-ER 28 DA __j c" NOI 2,DESIGN CONFORMS WITH 3W CMR MOM,DEP I TITLE 5 REGS,FOR DISTRIBUT-I 1)PFOODE 6'Chb"SHED ST0,NT,BASE TOP OF FND 100.00' ON BOXES, SNSTEM PROFILE 2)ALL D-BOX 101UTLETS TO BEE AT T;FE SAMIE ELEVAMM! NOTE: A MINIMUM OF 4' CO VER j)D-BaV TO BE WA7ERTIG�lff TO BE PROVIDE79 OVER SEP771C TANA Lli P40T TO SCALE MECHANICAL COMPACT r-4 c OF Q WL BME MARMQ C ALL PIPING TO BE A MIN.OF SCHEDULE 40 PVC D-Box M INSURE LEvEL/ mt CKI 14- FIRM BASE. AAN.RMSHED,GRADE CD 0 �6 COVER TO GRADE OVER D-BOX 9mv FRIRST BW F&Ir FINISHED GRADE J F _2%SLOPE(MIN,) D-BOX(6 OUTLET)BY SHEA CONCRETE PRODUCTS 20�Ak CAST hROGIN COVT--R I TO BE MT LEVAEL I/ r cc� X:�E -4- CUT R_D-BROX K_Q - ---------- N TO, SW _2' L �4J 02.2�Lu WASHED STIONE I DISTRIBUMION BOX I ar Liu (D W)4-Sy pVC 0-0 1 1 i I fKARIMT co 1=41-20 LOADING 9"MIN,EXCLUDING TOP S011 (50) SOLID PVC SCH,-0 L_�J'A�491 E'S 360-s MAK lNGLUYNG TOP SCIL 4'PERF,SCH,40 PIPE Top sTc�p4E i 16- jW"nmr==­5j4"-n' f% 0 Flow LVv 6 I S=0,07 --k-- _F- ' fill 3ULID Hv,­S61, I /-W/3/8--5,18-ORIFICES El=97.30' -Ti TOP STONE _4 _j Mol -1 1 il 1 Ulf Z j- CAP EX157WVG ZAal MAR 16"CRUSHED STONE BASE (WATERUGHT-MONOL17"HIC)(H-20 RATED) DOUBLE WASHED STME C) MECHMMCAL COMPACT EL�96 30-'/ WATERTIGHT , z N U EL-�A__ EL�=97,22'j RLL BASE MA-11ERIAL OF i&8 D-BOX TO INS LE!/ 33 MIN'TO BLDG 6''CRUSHED STONE BASE URE W GROUNDWATER FIRM BASE, ELEV_=933' 1500 GALLON CONCRETE NOTE. FLOW EQUALiZERS BOTTOM OF SEPTIC TANK 914 NOTTO SCALE LOCAL UPGRADE i (BASED ON DTH#2) MAX SFAAT%Q GROUUMMTER TABLE 93.-3'x APPROVAL RZEQUESTED SEPTIC TANK(MONOLITHIC) TO Bf PROV E AT ALL DAM, 20 MIN,TO BLDG, OUR-ETIS FROm D--qCDDX 1 LEACHING BED: 18' WIDE X 47'LONG -14EREFORE BOTTOM OF TANK ABOVE SEASONAL HIGH GW TABLE(OK) SEF 1 1 L 2018 towfF--_- 1) LOCAL UPGRADE APPROVAL REQUESTED(4'REQUIRED.3'REQUESTED) 0 f :2