Loading...
HomeMy WebLinkAbout20180917 Decision/insubstantial change - Insubstantial Change - 31 JOHNSON CIRCLE 9/17/2018 • • �zr�>;'6,¢ Town of North Andover Office of the Planning Department Community Development Division 120 Main Street North Andover, Massachusetts 01845 NOTICE OF DECISION(INSUBSTANTIAL CHANGE) Date of Decision: September 17, 2018 Petition of: Denise Favorat 31 Johnson Circle North Andover,MA 01845 Premises Affected: 31 Johnson Circle North Andover,MA Assessor's Map 97,Parcel 62 PROJECT On September 6, 2018 the Planning Board approved a Watershed Special Permit to allow the addition of a 14'X16',four season finished sunroom and 10'X10' deck with portions of work in the Non-Disturbance Zone and the Non-Discharge Zone of the Watershed Protection District. The project is located within the Residential 3 (R-3)Zoning District. The proposed deck and addition included the installation of a Stormtech infiltration system. On September 12, 2018,the Applicant requested an Insubstantial Change as to replace the proposed infiltration system with a crushed stone trench. The Town Engineer has stated that a trench constructed with fabric, crushed stone and piping for drainage is an acceptable design change. (See the attached email from John Borgesi dated September 14, 2018). The Town Engineer must be notified during construction prior to backfilling the infiltration area and piping in order to confirm the construction of the system. FINDINGS The proposed changes are deemed to be Insubstantial and do not alter either the intent or the conditions of the original Watershed Special Permit. All plan revisions will be reflected on the final as-built drawings. Monica Gregoire, taff Planner Attachment: J. Borgesi,P.E., Town Engineer, email dated September 14,2018 9/14/2018 Town of North Andover Mail-pdf Noull ANbOVER Massachusetts Monica Gregoire<mgregoire@northandoverma.gov> pdf John Borgesi <jborgesi@northandoverma.gov> Fri, Sep 14, 2018 at 8:44 AM To: Monica Gregoire <mgregoire@northandoverma.gov> Cc: Jean Enright<jen rig ht@northandoverma.gov>, Denise Favorat<dfavorat@gmail.com> Monica, As requested I have reviewed the proposed change to the infiltration design for the addition to be constructed at 31 Johnson Circle. Based on my review of the updated plan prepared by Christiansen &Sergi dated 9-11-18, the updated infiltration design is acceptable. Please make sure that this office is notified during construction prior to backfilling the infiltration area and piping so we can confirm the construction. Please let me know if you have any questions. Thank you! -John John J. Borgesi, P.E. Town Engineer Department of Public Works Town of North Andover 384 Osgood Street North Andover, MA 01845 Phone: 978.685.0950 Fax: 978.688.9573 [Quoted text hidden] https://mail.google.com/mail/u/0?ik=dadd 1872e7&view=pt&search=all&permmsgid=msg-f%3A1611586951181820757&simpl=msg-f%3A16115869511... 1/1 FOR REGISTRY USE ONLY ZONING DISTRICT: R3 MIN.LOT AREA= 1 CERTIFY THAT THE PROPERTY LINES SHOWN ARE THE LINES 125 S.F. = DIVIDING EXISTING OWNERSHIPS,AND THE LINES OF STREETS •�.�'�'�� �j MIN.FRONTAGE25 FT. AND WAYS SHOWN ARE THOSE OF PUBLIC OR PRIVATE --". r,O CjS MIN.FRONT YARD=30 FT. STREETS OR WAYS ALREADY ESTABLISHED,AND NO NEW LINES "'`•O�w C ON,C 1 MIN.SIDE YARD=20 FT. FOR DIVISION OF EXISTING OWNERSHIPS OR FOR NEW WAYS ...^"l ,`+C 1 I MIN.REAR YARD=30 FT. ARE SHOWN. J I CHAPTER 41 SECTION 81X / EXISTING i ///•"� //a'°= LANDSCAPEAREA DATE THE CERTIFICATION SHOWN ABOVE IS INTENDED TO MEET /r°i�i o `150'1111-1I1TURBANCE ZONE REGISTRATION REQUIREMENTS AND IS NOT CERTIFICATION TO TITLE OR OWNERSHIP OFPROPERTYSHOWN.OWNERSHIP EXISTING DECK OF ADJOINING PROPERTIES ARE ACCORDING TO ASSESSORS / ( �.�. TO BE REMOVED I CERTIFY THAT THIS PLAN CONFORMS TO RECORDS. I = THE RULES AND REGULATIONS OF THE PROPOSED EXISTING I REGISTER OF DEEDS. PLANNING BOARD owewNc ADDITION EXISTING TOWN OFNO.ANOOVER BIT.CONIC.DRIVEWA / /=10 ` 100'CONSERVATION BUFFER N INFILT T10 - DATE AREA 75'CONSERVATION ZONE PRosdsED / MICHAEL W CONNOLLY PRop ASSESSOR'S REFERENCE I NIP MAP 97,PARCEL 62 JAMES CARROLL DATE �,�---- PROPOSE IViBED A710tG — LOT REA \ CONTROL BARRI ROOF RECHARGE / 25,046 .F. CALCULATIONS, // a, \5t C. i F007PRINT AREA =224 SF 6^MIN.OF LOAM / \ ,• / REVISED WETLAND LI ,a AS PER JENNIFER HUG S R£OUIRED RECHARGE VOL = 2"MIN.OF STONE \ / (0.5)(1 V12)(224SF) =9.33 CY INSTALL LEACH FIELD 10 FEET LONG BY 5 FEET WIDE BY 1r-^ FOOT DEEP STORAGE VOLUME N/F 1OX5X1 =50 C.F. OF STONE XU CHEN 40X VOIDS SITE PLAN VOLUME OF STORAGE � 30 0 30 60 FT 20 C.F CROSS-L SECTION SCALE:1-30' 20 C.F.>9.33 C.F. OK SiFO� S/ONALO FlItre�9slitsoixn GUTTERS AND DOWNSPOUTS SHALL BE INSTALLED TO Area to be Protected Area b be Protected SPEC/AL PERMIT PLAN ROOF Work Aree COLLECT ALL ROOF RUNOFF LEADER FROIff M THE ADDITION&CONVEY R° LOCATED IN OVERFLOW IT TO THE INFILTRATION AREA. A� ^A' n■�/� PIPE SPLASH MIN.OF'3'STONE Work Area Rhona Compose O.ANVDOVERMA. 7 BLOCK SiI1Smx^' PREPARED FOR -- ---- ................. •- •-•- --.....---- tr x4 oxx? DEN/SEFAVOR,4T Plit an Vlew FiltrexRSiitSoxx?Section ti:i:=. 7'�a>y`�� t:p�C:"✓C y.� .?'a1�.'h�-•r:`l?e..`�••': 4 PPV PIPE 30 0 3o so FT SEDIMENTATION CONTROL DETAIL 31 JOHNSON CIRCLE NO.ANDDVER,MA.01845 CULTEC NO.410 Noses: O FILTER FABRIC TOP 1.All m tanial to meet FIV-8 specifications. (MANDATORY),SIDES 2.SNSorxT'mmpostlsofi/rock/seed fill to meelappllcalion requirements. DATE.7/11/18 REV 7113118,8121118,9111118 BUILDING AND BOTTOM 3.SIItSam-depicted is forminimum slopes.Greetarslopes meY requirela ryarsocks perthe Eng ine OFOUNDATN 4.Compost material to be dispersed on site,as determined by the Envirenmentel Monitor. SCALE'1"=30' STONE 1'BASE STONE I-1/2"-2"0 BORDER CLEAN WASHED BROKEN STONE FYP) Ad= AM PROFESSIONAL ENGINEERS&LAND SURVEYORS DOWNSPOUT & ROOF RUNOFF INFILTRATION AREA DETAIL CHRISTIANSEN& SERGI NOT TO SCALE A DIVISION OF THE MORIN-CAMERON GROUP,INC. 160 SUMMER ST.HAVERHILL,MA.01830 WWW.CSI-ENGR.COM TEL.978-373-0310 FAX 978-372-3960 COPYRIGHT 2018 9/17/2018 Town of North Andover Mail-pdf NORTit ANnOVER Massachuselis Monica Gregoire <mgregoire@northandoverma.gov> pdf Denise Favorat<dfavorat@gmail.com> Wed, Sep 12, 2018 at 1:36 PM To: John Borgesi <jborgesi@northandoverma.gov>, Monica Gregoire <mgregoire@northandoverma.gov> Hi Monica if John, As mentioned to John B. when we spoke yesterday... Both contractors I've been working with are quoting me $2500-$3K for the infiltration system with the device that Phil Christensen put into the Site Plan. In speaking with John Borgesi, a simpler trench, with fabric, crushed stone and piping for drainage would suffice, and be acceptable to John. This design would cost less than $1 K, which is what I had anticipated. (Obviously, a savings of over $2K is quite significant to me.) Consequently, I asked Phil to re-do the Site plan with a trench design (versus the pre-built expensive chamber). Please find it attached. John indicated that he would review this, and check it. Apparently, an Administrative change has been allowed in the past for this type of change, rather than needing to go back in front of the Planning Board. Could you please see if this would be possible? Thank you! Denisev dfavorat@grnaii.com M: 978-807-9607 ---------- Forwarded message--------- From: Phil Christiansen <phil @csi-engr.com> Date: Tue, Sep 11, 2018 at 1:58 PM Subject: RE: pdf To: Denise Favorat<dfavorat(c_)gmai!.com> See attached revised drainage area Good luck Philip r flan n P.E. Christiansen r 1 Division of The Morin-Cameron Group, Inc. 08 ,., https://mail.google.com/mai l/u/0?ik=dadd 1872e7&view=pt&search=all&permmsgid=msg-f°/o3A1611424125562148193&simpl=msg-f%3A16114241255... 1/3 9/17/2018 Town of North Andover Mail-pdf P: 978-373-0310 F: 978-372-3960 From: Denise Favorat<dtavorat@gmail.com> Sent: Tuesday, September 11, 2018 11:44 AM To: Phil Christiansen <phil@csi-engr.com> Subject: Re: pdf Hi Phil, So, I did get approval from the Planning Board this past week (whew[). However, the cost of this infiltration system is roughly $2500-$3K, with one chamber, according to two different contractors. spoke with John Borgesi, North Andover Town Engineer regarding if the chamber is required, or if just a trench would suffice. John told me that a trench, with fabric, crushed stone and pipe for drainage, would be fine. Looking at your Site Plan you revised with the infiltration system, he estimated that a 10x10x3 (or a little less, about 10x1Ox 2.5) trench (with 6" of top soil for grass to grow over it) would provide the volume you specified on the plan. This would cost less than $1 K, per one of the contractors. John told me that the Planning Board Admin, Monica, may be able to have this approved administratively - with a letter from him after he reviews the revised Site Plan. Could you, please revise the Site Plan (attached), with just a trench with fabric and crushed stone option. Obviously, $1.5Kto $2K is a significant savings for me : ). Please advise. Thanks! Denise Denise dfavorat@gmaii.com M: 978-807-9607 On Wed,Aug 22, 2018 at 2:08 PM Phil Christiansen <phil csi-engr.corn>wrote: [Quoted text hidden] 2 attachments httpg://mai1.google.com/mail/u/0?ik=dadd 1872e7&view=pt&search=all&permmsgid=msg-f`/`3A1611424125562148193&simpl=msg-f%3A16114241255... 2/3 9/17/2018 Town of North Andover Mail-pdf TRENCH.pdf 471 K 31 Johnson Circle Revised Site Plan with Infiltration TRENCH (1) 9-11-18.pdf 471 K https://mail.google.com/mail/u/0?ik=dadd 1872e7&view=pt&search=all&permmsgid=msg-f%3A1611424125562148193&simpl=msg-f%3A16114241255.,. 3/3