HomeMy WebLinkAboutContract #: 1248 - From: 05-23-2019 To: 11-30-2020 - Waterfield - DPW i Town of North Andover i Grogan's Field Restoration Professional Services Scope of Work az Estimate of Fee February 1,2019 Revised May 23,2019 Proiect Description During the Town's response to the Columbia Gas emergency, Grogan's Field was used for the placement of temporary housing using portable trailers. The field was damaged in this process and needs to be rebuilt for use this coming Spring and Summer. i (A.) Scope of Work Based on the summary above,the description that follows represents the specific scope of work needed to complete our work elements for this project. Task 1.0 Damage Assessment&Topographic Survey of Existing Conditions To assist the Town of North.Andover with their interactions with Columbia Gas thus far, our office has already performed an initial site inspection and conceptual level construction cost estimate. This task includes a more detailed assessment of damage to the field and related facilities (parking,fencing,dugouts,access, etc.)at the site. We will record specific impacts for use in the field restoration design in the subsequent tasks. We will perform a topographic survey of all existing conditions and create a base plan documenting same at an appropriate scale in AutoCAD. We will not record the property's boundary information since the legal limits of the site are well defined. Because of the addition of the playground to the design scope, additional field and survey time has been added to this task so that we may record the existing conditions of the playground area. Task 1.0 Fee $8,500. Task 2.0 Design Development & Construction Bid Documents Using the completed base plan,we will prepare a site design for the reconstructed baseball field giving specific design direction for how to repair the field to its former condition. Where possible,we will suggest improvements to what was once in place provided that it does not greatly exceed that which would be appropriate for the gas company to restore. We will prepare final design plans,specifications, and construction cost estimates to the Design Development (DD) and Construction Document(CD)levels.We will meet once with the Town at the submission of our DD and CD package to review the plans and to receive comments. If necessary,we will modify the DD plans in short order to address any review comments that may )AMI Waterfield Design Group i I i I benefit from an immediate dialogue. We will develop a proposed construction schedule illustrating what we think will be possible given the goals, objectives, and constraints of the site and its desired use. . The scope of the project is to replace what had been in place prior to the disruption of the field for the gas recovery effort. An underdrain system to assist with field runoff drainage will be j included in the design of the rebuilt field. We have assumed that no permitting will be necessary with any town board or authority.We will include with our submission the necessary Stormwater Pollution Prevention Plan(SWPPP)in conformance with state and local requirements for the construction process. In addition to the field of play reconstruction, damage to perimeter fencing and sport fencing requires that those elements also be replaced. Specifically,new perimeter fence is needed along Gilbert Street and new wood guardrail shall be designed for the Baldwin Street side. The existing chain link backstop will be replaced with a new shorter backstop fence and tall netting will be added along both baselines originating at the backstop to protect neighbors and spectators from the high speed of errant foul balls. The netting will be retractable so that it can be lowered when games are not being played. The existing dugouts will be reconstructed and integrated to the fencing approached as noted herein. We will design the same dugout elements that are proposed for the Middle School field project. We will select a prefabricated storage shed similar to those used on previous North Andover recreation field projects. We will rehabilitate the existing bathroom building to install new fixtures,finishes, interior lighting, and ventilation fans. We have assumed that i We have assumed that no new exterior lighting will be included at this time with our design improvements. No improvements will be made to the existing bathroom building. Our deliverable for this task will include all engineering and landscape architecture design plans, a technical specification, and cost estimate required for the elements noted herein. Our final deliverable will be two(2)sets of final design documents (plans,specifications)suitable for advertisement for public bid for construction by the Town of North Andover. We will utilize a bid form and specification`front end'provided by the Town. We assumed that up to three(3) meetings will be held with the Town during the design phase. Task 2.0 Fee $27,200. Task 3.0 Test Pit Evaluations To assist in the performance of the reconstructed natural turf grass field,we will perform a series of test pit excavations at pre-selected locations that are spread evenly to obtain a representative sampling. These excavated test pits will allow us to verify the soil percolation rate of the existing soils. This task assumes one(1)day of field excavation. If a second day is needed (doubtful),additional fees will be necessary. We will excavate one location in the outfield area to a depth of 8-10 feet in case the design of the new playground creates new impervious surfaces that would require on-site infiltration of the new runoff. We will prepare a soil log to record the results of our testing. MM I Waterfield Design Group Task 3.0 Fee $2,500. $2,000.per day—excavating machine Task 4.0 Bid Phase Services We will assist the Town of North Andover in their management of the public construction bid process. We will participate in a pre-bid conference on-site. We will respond to any written questions received during the bid period. We will review the technical aspects of the highest qualified low bidder. We will review the low bidder's past projects and contact references. We will prepare a written summary of our results to the Town for their consideration in the final award of a construction contract. The Town of North Andover shall be responsible for entering into a legal contract with the selected bidder. i Task 4.0 Fee $2,500. Task 5.0 Construction Phase Services Once a firm has been awarded the construction contract,we will participate in one(1)pre- construction meeting. We will review shop drawings and answer any requests for information (RFIs). We will review contractor payment requisitions for technical competence only. We will meet once weekly on-site to review progress and answer any technical questions. We will answer any questions the Town of North Andover has in their daily management and oversight of the contractor's work. We have assumed a construction duration of 3 months. We have included two(2) special meetings for general assistance and to accommodate unexpected construction issues. We will perform semi-final and final construction inspections and prepare a punch list of incomplete and inadequate items. Change orders based on unforeseen conditions or to accommodate the preferences of either the Town or the General Contractor are considered out of scope and shall be completed on an hourly basis,if requested. A full time on-site Construction Clerk is not included in the budget for this task. Task 5.0 Fee $23,000. Task 6.0 Full Time On-Site Clerk of the Works (OPTIONAL) If the Town prefers to have our company manage all aspects of the construction oversight,we can provide a full time on-site Clerk of the Works. This person will report to the Town on the progress and compliance of the work on a regular basis during construction and meet with the Town as needed. The Clerk will manage and oversee the Contractor's schedule. During this time,we have assumed that our on-site Clerk would be present the majority of the time, providing constant intermittent coverage(between 60-70%of the full time hours during this time period). A three(3)month construction duration has been budgeted for this task. Task 6.0 Fee $50,000. Waterfield Design Group (B.) Direct Expenses Reimbursable expenses are not included in the fee compensation outlined above. Reimbursable expenses will include the actual expenses incurred by the Waterfield Design Group in the interest of the project. They shall be reimbursed at cost and may include(but not be limited to)the following: 1. Cost of copies of drawings,documents and reports;xerography and photographic reproduction of drawings and other documents furnished or prepared in connection with the Scope of Services; 2. Cost of commercial carrier and/or transportation,lodging, car rental,parking, subsistence(meals)and out-of-pocket expenses for materials or plant selection only. No mileage expense required for on-site meetings and inspections. i 3. Cost of postage and shipping expenses other than first class mail. i 4. Photographic services,film and processing. 5. Costs related to models,printing special renderings,promotional photography,special process printing,color printing,special equipment,special printed reports or publications,maps and documents approved in advance by the Client. 6. Other expenses that may arise as needed to properly complete the contracted work. Permit Fees—In the event that any permitting is necessary or required,any and all fees required to file or secure a permit that may be necessary or required as a part of this work must be paid in full in advance by client.Permit(s)will not be filed nor drawings or documents submitted without payment by Client. Payments made by Client in this regard will be made directly to the subject agency or authority requiring such payment. Extraordinary expenses require advance approval of Client before use or engagement by Consultant. Rate, cost, and expense schedule may be updated yearly as necessary. Contracts underway may be amended to accommodate the annual update. Fees for direct expenses have been built into the budgets of each individual task. (C.) Total Estimated Fee Our fee for the work described herein is a lump sum amount of$65,700,which includes all expenses(assuming that expenses remain within the range projected above—actual costs must be paid). Invoicing will be not more than once monthly and progress payments will be required based on the approximate percentage of the work completed. This fee does not include a full time clerk during construction but we can modify the total proposed amount should the Town prefer to include that direction at any time. NAM I Waterfield Design Group i (D.) Notice to Proceed Your signature in the space provided below indicates your acceptance of the scope of work and fee estimate provided herein. Our company's Standard Terms and Conditions are made part of this Agreement by reference here once work begins. This additional work will abide by all terms contained in the fully executed original contract for this project between the Town of North j Andover and Waterfield Design Group,Inc. AGREED AND ACCEPTED: Town of North Andover j Signature: l ' Date Printed Name. L j i i I �,Waterfield Design Group