HomeMy WebLinkAboutConstruction Notes - Consultant Review - 1985 SALEM STREET 9/25/2019 North Andover Health Department Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 1985 Salem Street MAP: 106.B LOT: 248 INSTALLER: Dave Maynard DESIGNER: Christiansen and Sergi PLAN DATE: May 5, 2017, rev Aug 2017, rev Jan 17, 2018 BOH APPROVAL DATE ON PLAN: 01/29/2018 INSPECTIONS TANK INSPECTION: 5/24/2019 DATE OF BED BOTTOM INSPECTION: 5/29/2019 DATE OF FINAL CONSTRUCTION INSPECTION: 6/6/19 DATE OF FINAL GRADE INSPECTION: 9/23/2019 SITE CONDITIONS Contractor reports any changes to design plan Existing septic tank properly abandoned Internal plumbing all to one building sewer Topography not appreciably altered Comments: 6/6/19: Extensive site grading changes occurred for construction. Likely not a violation of Title 5, just worth noting. 6/6/19: Benchmark on plan has been removed, new benchmarks provided and reported to have been established by engineer. Requested confirmatory letter from engineer. 6/6/19: Well observed to have been drilled in general location as per approved plan SEPTIC TANK Building sewer in continuous grade, on compacted firm base Cleanouts per plan Bottom of tank hole has 6” stone base Weep hole plugged 1500 gallon tank has been installed H-10 loading Monolithic tank construction Water tightness of tank has been achieved by visual testing Inlet tee installed, centered under access port Outlet tee installed, centered under access port (gas baffle) 24 inch cover to within 6” of finish grade installed over one access port Hydraulic cement around inlet & outlet Comments: DISTRIBUTION-BOX Installed on stable stone base H-20 D-Box Inlet tee (if pumped or >0.08’/foot) Hydraulic cement around inlet & outlets Observed even distribution Speed levelers provided (not required) Schedule 40 PVC Pipe Comments: 6/6/19 – Very slight preferential flow to one arm observed. Contractor to install leveling devices SOIL ABSORPTION SYSTEM (General) Bottom of SAS excavated down to C soil layer, as provided on plan Size of SAS excavated as per plan Title 5 sand installed, if specified on plan 40 Mil HDPE barrier installed Laterals installed and ends connected to header (and vented if impervious material above) Elevations of laterals and chambers installed as on approved plan Retaining wall (boulder / concrete / timber/ block) Final cover as per plan Comments: Sand Onsite 5/29/2019 – 85’x25’ FINAL GRADE Loamed Seeded Cover per plan Comments: DOCUMENTS NEEDED Certification of Installation Form submitted By engineer and signed and dated by Engineer and installer As-Built Plan SYSTEM ELEVATIONS BM 2A reported to be 146.62, BM 1A reported to be 122.07 AS-BLT INVERT DESIGN INVERT ELEV ELEV Building Sewer OUT 140.66 134.00 Septic Tank IN 134.93 132.40 Septic Tank OUT 134.73 132.15 Distribution Box IN 120.27 120.26 Distribution Box OUT 120.07 120.09 Lateral 1 Beg 120.00 119.99 Lateral 1 End 119.84 119.83 Lateral 2 Beg 120.00 119.99 Lateral 2 End 119.85 119.83 Lateral 3 Beg 120.01 119.99 Lateral 3 End 119.84 119.83 Lateral 4 Beg 120.01 119.99 Lateral 4 End 119.84 119.83