Loading...
HomeMy WebLinkAboutDated 1.29.2018 pg 2 - Approved Septic Plan - 1985 SALEM STREET 9/25/2019 - GENERAL NOTES 1. NO GARBAGE ISPS ARE_ INSTALLED. - -- t Z FILL N NTERI L=Ott SYSTEMS CONSTRUCTED i FILE SHA- CONSIST �SELECT i ��C?�IMPORTED-SOIL -€ Tl - a T ;_' ERdAt HALL BE COMPRISED OF CAL �I N t� -F -- _ ,«#. - �I � «I - - t -I E ICE �.� � S �� ��. CiR�+7IC - ;€.,t rTtL3t :C [c.U 7 t I CIF- I F SOILS SHALL ;{ 4.-, _: - - _ - CONTAIN r fR s T, 4 gEARTH ; e NOT BE USED-f ICE.FILL S NOT �N,�=N ANY MATERIAL LARGER THAN�Ill 1 A SIEVEY ID USING MI .O °.MAXIMUM� BACK I L-« ,;i « - _ �-4DS TO BE CAPPIED � T - - A ? L E PER7R1E * I?E RESE T A T IVE SAMPLE r EI WEIGHT TT - - - . SIEVE,SIEVE A t YS AT �T P P THEFRACTION SAMPLE MAY BE REAMED O- . SIEVE,S,off ANALYSES MUST g_ 5, THAT THE MATERIAL MEETS' .3t S O �.a�CH'`�:��47,HE— — _n---FILL Sx.#mE PASSING:E —- W_Ai EACH OF THE FOLLOWING SPECIFICATIONS - :, Pa, SCHEDULE 40P� ..{,` - EFFECTIVE %FIAT MUST -SLCIPE-.s57 RT CA E I E S, TCF`=t42.0 t t-EXISTING e _ „ 0%5' 142 WHERE FiLI IS REQUIRED TO REP!.4CE UNSUITABLE OR IMPERME40 E SOILS,THE EXCKVAjION OF THE r` t UNSUITABLE MAT E``TIAL SHALL EXTEND A MINIMUM OF FIVE FEET LATE LI-.'IN ALLDIRECTIONS BEYOND THE STOW OUTER PERIMETER OF THE SOIL ABSORPTION SYSTEM TO THE DEFrrH OF NATURALCY 0CCURRtNG PERVIOUS ` MATERIAL AS REQUIRED BY 31E g'MR 15,24(SOIL ABSORPTION SYSTEMS AND R C WITH A L IM TERIAI MEETING THE SPECIFICATIONS OF NOTE#2 ABOVE 1 ` �. R?O TO PLACE iEN T CF FILL,WHICH SHALL BE STOCK ILE AT HE EDGE 0 i HE EXC A i ION AND FILLED Its - - LEACHING TRENCH LONGITUDINAL SECTION UALL,THE T4 OFT EEXCAVATIO SHALL S RIF,I -I RELATIVELY .RULSHALLNOTBE PLACED DURING RAIN OR SNOW STORMS.IF THE LATER TABLE ELFVA U0N!SABa,,fE THE ELEVATION OF THE 79 L F.4'SC 40 PVC S t 0 T NOT T;SCALE BOT TI OM OF f E E C:VATION,THE EXCAXkATION SHALL BE DE A;ERR AS NECES Y. g t 5 A T'VVO TO I=OITR YEAR SEPTIC TANS PUMPING SCHEDULE IS RECOMMENDED TO A'JOiD LEACHING AREA 13 ----. --..�. ---. -.- --- I--- --_ , ----. ----. : --.... _..._ PROBLEMS. t` - - ;' _ = 8- ALL PIPE INSTALLED AFTER THE SEPTIC T ANC SHALL SCHEDULE R 1=PdTS SHALL BELTOMcTII T i a 24- LD RISER TO WITHIN 6°OF FINISH GRADE ai.iTS.ASS FLY SHALL PERFORMED AS,aR -MANUFACTURERS GASKE ED INTc RfiL BELL TYPE 1 12 1 TO AXIMU ��� I�TI� SPECI l ATIC3t�S. 136 .aA—4'PP'VC SCHEDULE-PIPE'— — 'HE BUILDING SEINER SHALL BE A'SLIT de PVC PIPE SURROUNDED BY A-MINIMUNI OF m GRAVEL 3 < r I4 8, THERE ARE NO KNOWN WELLS WI I H:N 100 FEET OF THE PROPOSED SYS T - 4 14 TO 1 IN S vNE- /� - A SE3V ANALYSIS SHALL E PERFORMED t THE F(?i AT T KCAL T USED.A NY 7 iE ESI IL[S=E THE i 5 I, _ . ANALYSIS iA?LI SUBMITTED t Tv: =HI BOARD C F HEALTH E� 'AL PRIOR Y PLttC Et T ELL, TF s t f - a « T 10, THE F`=mL�.'ERIAL USED S r.CL BE PLACED I 12"�XIM .COMPACTED'ED' T S. I RESERVE 2 1 1 E , #N i HOUSE � """�-�. `` - - - -« ? _ ,i-- - aO.. WITHIN A NITROGEN SENSITIVE AR 4. i r 1= 'TILSLCTTTESP LIE - i 6 F 134.E ` - - c u ;; eT I r« = 12, MAGNETIC i AP i O BE PLI�� v R L SYSTEM O S. 132 13, ALL PIPING SHALL BE A MINIMUM OF SCHEDULE 40 PVC. V SEPTIC TANK INLET=132-WJ = a% S GCE _ LEACHING TRENCH CROSS SECTION }HIS LET DO E •-LIE WITHIN THE CCHIGEEICA ERSHEI IT I I I :T. €NV SEPTIC TANK OUTLET='32,15 NOT TO SCALE 1 D. THIS SITE I SUBJECT TO AN ORDER OF CONDITIONS FROM THE NORT,H ANDOVER CONSERVATION CO,_ISSIO 130 .<� 1 � CEP FILE 01242-9 n84. =.24 124 S � � 15W GALLS ' 1 °OF 1-^TO ASHI TT STONE SEPTIC TANK I �#__^L.F 4'SC 40 PVCS=0.v 5.0 f SCH 40 PER_-PVCf 8 �r} -PROPOSED E 1 t -- - -2$ t 3'4'TC 5 a,2 'ASHEC S T tiE - 22 €`3 PLACES' _ €t# -.... `_ 3 t = j r= _. f E ; BASE OF �" �� ! t'�---_�� ��„��� f ' � - �`..l i !2� TOP OF STONE=12033 qWk IN 4IF 120 120 £p 4Q 4`SCH 40--jf i EXISTING TRADE SCHa � I i-TOP OF STONE BEGINNING OF TRENCH=r T PVC TEE PVC,TEE . �s ,`-IT'S:" BEGIN NING a aC OF a-�iiCPi 31.E i PLAN VI`" T 'F $ t P"3`iF.4s SCE `t'f°,S '=IX� - .:_ �<._ 4'TOE tE HD- a 3' I AIR SPACE A `'=o TEES 122 -- - VS - P. ;TC ��_ - PLASTIC�S � 3 f 3 _ PIPE SEAL I T LET 116 1i6 ' , E N T U J' LEVEL 4 APPROX€MATE LIMITS OF REMOVAL OF i a I T CPSCIL,SIJBSOILz&UNSUITABLE -- 119_� ' j i SAILS RELCEMEN T 'F i(TI E s 10 `t > � N, _ i e SA D:SEE TES &3 ON SHED b TONE, XMIN E L� s - _ y s _ __. _ y _ .__ _. - - 1. _.. --___ - --. - SAS S.H.d g Im 'v. INtET T2ft _ FR-E !3' X LET I ET s n 3 SEAT CN VEN 1E ; TAPER f �c`1- 0-SLCrL, La4,sUI '0 's I 110 SOILS&REPtACCEMENT WIT`T r? �5 SPECIFICATIONS: 0*00 025 �+ 0+75 SAND SEE MUFFS 2 8 u ON SHEET 2 1.CONCRETE:4,10W PSI MINIMUMAFTER 28 DAYS i.AFL Rif.I=TCEE,m ER ASi`M C9Z" . 3.TONGUE&GR 3`7E j0tNT SSE-WITH B ITYLE RESIN, CROSS-SECTION - I S,H.W.T.ELEV-1128, 1500 GALLON SEPTIC TANK VERTICAL SCALE:1'e 7 USE SHEA CONCRETE PRODUCTS - SYSTEM NOTES: FOR OFESSIONAL ENGINEER 4 THESEPT IC T A E=S'0 BE kMOUTHIC O S RUCTION AND SHALL BE TREET - ____ - HT HR� ISPECIFICAT= ARRA TY LOT SALE IN c E SEPT�,EP-IC TANK NK SHALL E T`A L L�VEI����tt}E T'`'.-�s�;�;�T[~T A LEV'FL. f -MASS4 '�r- : ;.�; #. tea_ ; . ': _ S s I BAST-T ITAT HAS BEEN 1ECRAN'.CALL Y COMPACTED PAD ONTO WHICH SIX ��"�'r���' NORTH ANC S CFtJSHED STCE HAS SEEN PL4CED T C I=4IE F4E SETTLING. f IF a HCOMPACTION� R.: ��aE APPLICANT �-i. `!r� '� _. :�SEPT'SE:TiC TANS IS 4v .N Flif„PROPER REQUIRED TO �- - CIO - - A- ENSURE STATBILI A LT T . VE SETTLING.THE SEP:C TANK SPIN DIVE A ° V N T N DEVELOPMENT I F46 _ :.7 ,, .,r E 0�25 + r ? _> _ a MINIMUMC V EP F N NE INCHES, P.C-BOX � PROFILE(THROUGH LOWS LEACH NE a THE SEPTIC,.AJNK,CUVERS,CONNECTIONS AND PIP,N�SHALL E ESIGNED Are . =87 Cc`NS`-,RUCT�D S l AS TO vV FiSTAND AN ANTICS-PAE E I tVINI�M H-';3 LOADING.H�RI�I�P�,AA�SCALE:.`,_°e�' � z i=ili �CHRIS,LSEN:t E. VERTICAL SCALE:_ 2' 4: i PROFESSIONAL EI II EE S LAND VEY S _ ALL OUTLETS FROM THE E X OUTLET ARE TO AT THE !�#F rEIRT ELEVATION_"`' CHR AN N E .,INC. DAT �,�1 DISTR BLITION L€NES S`` L-�L FOR A iINIMU[OF THE FIRST;V FEET THEIR LENGT. SiT1ER ST.ITI�VERTi;L�,�.�3L?�'- `.CS7-EhIC_Ct`�� REV:ALIT.4, t7,.J�N.17, 18 TEL 978-373-031C FA.X.978-372-3960 GOPYMGHT 20 DWG,NO.1- 7