Loading...
HomeMy WebLinkAboutConstruction Notes - Consultant Review - 220 BOSTON STREET 10/2/2019 North Andover Health Department Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 220 Boston Street MAP: 107.B LOT: 32 INSTALLER: Boraczek DESIGNER: PLAN DATE: BOH APPROVAL DATE ON PLAN: INSPECTIONS 10/02/2019 - T-baffle Installed SEPTIC TANK Building sewer in continuous grade, on compacted firm base Cleanouts per plan Bottom of tank hole has 6” stone base Weep hole plugged 1500 gallon tank has been installed H-10 loading Monolithic tank construction Water tightness of tank has been achieved by visual testing Inlet tee installed, centered under access port Outlet tee installed, centered under access port (gas baffle/effluent filter) _____ inch cover to within 6” of finish grade installed over one access port Hydraulic cement around inlet & outlet Comments: