Loading...
HomeMy WebLinkAbout- Correspondence - 435 ANDOVER STREET 11/5/2019 ENVIRONMENTAL CO N E C O ECOLOGICAL ENERGY Engineers & Scientists SURVEY September 6,2019 RECENE® CIVIL Coneco Project No. 9891 Mr.Brian LaGrasse,Health Director VER North Andover Health Department 'TOWN p�NpR1H TMEPIT 120 Main Street HF�ITH pPAR North Andover,Massachusetts 01845 RE: Public Involvement Notification Implementation of Release Abatement Measure Activities Non-Polychlorinated Biphenyl Mineral Oil Dielectric Fluid Release Pad-Mounted Electrical Transformer 435 Andover Street North Andover,Massachusetts 01845 Release Tracking Number 3-34729 Dear Mr.LaGrasse: Pursuant to 310 CMR 40.1403(3)(d)of the Massachusetts Contingency Plan(MCP),the following serves as written notification of the implementation of Release Abatement Measure (RAM)Activities. RAM activities are being initiated to address a historical release of non- polychlorinated biphenyl(PCB)mineral oil dielectric fluid(MODF)at the above-referenced location,hereinafter,the"Site." The release is a result of a slow leak from a pad-mounted electrical transformer located approximately 15 feet north of the Site building. This letter follows notification to the Massachusetts Department of Environmental Protection(MassDEP)on January 16,2019. Release Tracking Number 3-34729 was assigned to this release. Please note that this notice is being provided to inform you of these events. No action is being asked of you in response to this notice. The focus of the proposed RAM is the removal and proper off-Site recycling/disposal of MODF- impacted media. In order to accomplish this goal,Coneco will observe the performance of limited soil removal activities and the assessment of post-excavation conditions in the release area,including the collection and laboratory analysis of soil samples. Field activities associated with the RAM are scheduled to commence on or about September 9,2019,and are expected to take approximately one to two days to complete. This submittal is being made on behalf of the Massachusetts Electric Company d/b/a National Grid,the party conducting response actions relating to this release. If you have any questions,please contact the undersigned. Sincerely, Coneco Engineers& Scientists,Incorporated Patncla A.Jones Kenneth J. Gendron,PG,LSP Project Environmental Scientist Senior Project Manager PAJ:KJG:JDA jw Z:\\9891\NotiScations\KAM Plan-Municipal Notices.doc cc: Massachusetts Electric Company MassDEP 4 First Street,Bridgewater,MA 02324 (508)697-3191 (800)548-3355 Coneco.com