Loading...
HomeMy WebLinkAboutConstruction Inspection - Correspondence - 1 PENNI LANE 11/20/2019 8/1/2019 Town of North Andover Mail-1 Penni Lane-Construction Inspection NORTH ANDOVER Massachusetts Toni Wolfenden <twolfenden@northandoverma.gov> _.,Novo, �. 1 Penni Lane - Construction Inspection 1 message Dan Ottenheimer<dano@millriverconsulting.com> Thu, Aug 1, 2019 at 10:36 AM To: Brian LaGrasse <blagrasse@northandoverma.gov>, Stephen Casey <scasey@northandoverma.gov>, Toni Wolfenden <tolfenden@northandoverma.gov> Some issues were found during the inspection I completed this morning which I want to call to your attention. 1. The septic tank outlet tee is not centered inside the manhole as required. However, the effluent filter is accessible and the tank is already filled with sewage so I do not think it is critical to have this fixed 2. The pump used is not the one specified on the design plan. The designer needs to examine the pump, determine if it is appropriate, and provide specifications and calculations to show it is acceptable (if that is what he so determines). Alternatively, the designer may require the original pump that was specified to be used. 3. The floats were not set as specified per the approved plan. The installer was going to adjust them. The designer needs to examine these to confirm if they have been properly adjusted and confirm if this is the case or else provide documentation of the acceptability of the new settings including relevant calculations 4. The leach field piping is not uniform for all 4 arms of the field. The do all pitch from the distribution box, and they do all pitch from one end to the other, however they are at different heights with respect to each other. The designer needs to examine this and either require them to be adjusted or else specify the as-built elevations for all 4 arms of the leach field. The as-built plan that was provided only gives the elevations of the leach field piping for one arm. I have discussed this with the installer. He indicated he would be reviewing this with the designer. You may wish to do so as well. Feel free to forward this email if you wish. If you have the Construction Inspection Form started please do send that along, otherwise I will start one. Thanks hftps://mai l.google.com/mai I/u/0?ik=aOc6f4e4cf&view=pt&search=all&permth id=thread-f%3Al 640675616022043001&simpl=msg-f%3Al 64067561602... 1/2 8/1/2019 Town of North Andover Mail-1 Penni Lane-Construction Inspection Daniel Ottenheimer, PE President MRC_logo email 2 6 Sargent Street Gloucester, MA 01930-2719 Phone: 978-282-0014 ext.802 <blocked::http://www.miliriverconsuIting.com/>www.millriverconsulting.com Member: New England Water Environment Association, Yankee Onsite Wastewater Association, Massachusetts Environmental Health Association image001.png « MtLL RIVER CONSULTING 20K Ctxalire Solutiotts for iattd Development https://maii.google.com/mail/u/0?ik=aOc6f4e4cf&view=pt&search=all&permthid=thread-f%3Al 640675616022043001&simpl=msg-f%3A164067561602... 2/2